Prosecution Insights
Last updated: October 25, 2026
Application No. 18/888,826

SYSTEMS AND METHODS FOR PRODUCING COLD CNG FROM WELLHEAD GAS PRESSURE

Final Rejection §102§103
Filed
Sep 18, 2024
Priority
Sep 08, 2022 — divisional of 12/123,433
Examiner
NOUKETCHA, LIONEL W
Art Unit
3763
Tech Center
3700 — Mechanical Engineering & Manufacturing
Assignee
Cnx Resources Corporation
OA Round
2 (Final)
81%
Grant Probability
Favorable
3-4
OA Rounds
4m
Est. Remaining
94%
With Interview

Examiner Intelligence

Grants 81% — above average
81%
Career Allowance Rate
486 granted / 600 resolved
+11.0% vs TC avg
Moderate +13% lift
Without
With
+13.4%
Interview Lift
resolved cases with interview
Typical timeline
2y 5m
Avg Prosecution
39 currently pending
Career history
635
Total Applications
across all art units

Statute-Specific Performance

§101
0.2%
-39.8% vs TC avg
§103
41.6%
+1.6% vs TC avg
§102
21.1%
-18.9% vs TC avg
§112
35.0%
-5.0% vs TC avg
Black line = Tech Center average estimate • Based on career data from 600 resolved cases

Office Action

§102 §103
DETAILED ACTION Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . Claim Rejections - 35 USC § 102 In the event the determination of the status of the application as subject to AIA 35 U.S.C. 102 and 103 (or as subject to pre-AIA 35 U.S.C. 102 and 103) is incorrect, any correction of the statutory basis for the rejection will not be considered a new ground of rejection if the prior art relied upon, and the rationale supporting the rejection, would be the same under either status. The following is a quotation of the appropriate paragraphs of 35 U.S.C. 102 that form the basis for the rejections under this section made in this Office action: A person shall be entitled to a patent unless – (a)(1) the claimed invention was patented, described in a printed publication, or in public use, on sale or otherwise available to the public before the effective filing date of the claimed invention. Claim(s) 1-2, 4-5, 8, 10-11, 14-16, and 18 is/are rejected under 35 U.S.C. 102(a)(1) as being anticipated by Minta (US 20100186445 A1). Regarding claim 1: Minta discloses a system for processing a gas produced from an oil and gas well (Fig. 1; [0013]), the system comprising: a plurality of fluid flow paths ((i) path through #10a and (ii) path through #11) in fluid communication with a wellbore (inherently present. Feed gas is extracted from a wellbore), the plurality of fluid flow paths comprising: a first segment #10a in fluid communication with one or more containers (either #80 or any structure that receives LNG #15. Also note that “one or more containers” has not been claimed as part of the invention. Thus, the phrase “in fluid communication with one or more containers” is a functional or relational limitation); and a second segment #11 in fluid communication with a pipeline ([0024]: #11 is in fluid communication with loop #5; which is a pipeline. Loop #5 qualifies as a pipeline at least because it is used to transport gas. Also note that “a pipeline” has not been claimed as part of the invention. Thus, the phrase “in fluid communication with a pipeline” is a functional or relational limitation; rather than a structural component of the device. Thus, even if applicant argues that loop #5 is not a pipeline, segment #11 is capable of connecting to a pipeline to allow fluid flow. Accordingly, Minta meets all the limitations of a second segment in fluid communication with a pipeline); at least one heat exchanger #50 in thermal communication with the first segment and the second segment (at least via lines #10b & #13a within #50), the at least one heat exchanger configured to cool the gas in the first segment ([0024]); and a compressor #25 in fluid communication with the first segment, the compressor configured to compress the gas in the first segment ([0024]). Regarding claim 2: Minta further discloses an expander #40 in fluid communication with the second segment (see Fig. 1), the expander configured to supply power as the gas in the second segment flows through the expander ([0021]). Regarding claim 4: Minta further discloses wherein the gas in the first segment flows through the compressor #25 prior to flowing through the at least one heat exchanger #50 (see Fig. 1). Regarding claim 5: Minta further discloses wherein the gas in the second segment is heated by the at least one heat exchanger prior to being delivered to the pipeline ([0021] & [0024]). Regarding claim 8: The subject matter claimed here is substantially similar to that of claim 2. Thus, for sake of simplicity, conciseness, and brevity, please refer to the rejection of claim 2 above for the rejection of claims 8. Regarding claim 10: Minta further discloses wherein the gas in the first segment flows through the compressor #25 prior to flowing through the at least one heat exchanger #50 (see Fig. 1). Regarding claim 11: Minta further discloses wherein the gas in the second segment is heated by the at least one heat exchanger prior to being delivered to the pipeline ([0021] & [0024]). Regarding claim 14: If a prior art device, in its normal and usual operation, would necessarily perform the method claimed, then the method claimed will be considered to be anticipated by the prior art device. Thus, the method of claim 14, as claimed, would necessarily result from the normal operation of the apparatus of claim 1. See MPEP 2112.02. Regarding claim 15: Minta further discloses heating the gas in the second segment with the at least one heat exchanger prior to delivering the gas in the second segment to the pipeline ([0021] & [0024]). Regarding claim 16: Minta further discloses wherein the gas in the first segment flows through the at least one compressor prior to flowing through the at least one heat exchanger (see Fig. 1). Regarding claim 18: Minta further discloses supplying power, by an expander #40 in fluid communication with the second segment, as gas in the second segment flows through the expander ([0021]). Claim Rejections - 35 USC § 103 In the event the determination of the status of the application as subject to AIA 35 U.S.C. 102 and 103 (or as subject to pre-AIA 35 U.S.C. 102 and 103) is incorrect, any correction of the statutory basis for the rejection will not be considered a new ground of rejection if the prior art relied upon, and the rationale supporting the rejection, would be the same under either status. The following is a quotation of 35 U.S.C. 103 which forms the basis for all obviousness rejections set forth in this Office action: A patent for a claimed invention may not be obtained, notwithstanding that the claimed invention is not identically disclosed as set forth in section 102, if the differences between the claimed invention and the prior art are such that the claimed invention as a whole would have been obvious before the effective filing date of the claimed invention to a person having ordinary skill in the art to which the claimed invention pertains. Patentability shall not be negated by the manner in which the invention was made. The factual inquiries set forth in Graham v. John Deere Co., 383 U.S. 1, 148 USPQ 459 (1966), that are applied for establishing a background for determining obviousness under 35 U.S.C. 103 are summarized as follows: 1. Determining the scope and contents of the prior art. 2. Ascertaining the differences between the prior art and the claims at issue. 3. Resolving the level of ordinary skill in the pertinent art. 4. Considering objective evidence present in the application indicating obviousness or nonobviousness. Claim(s) 7, 13, and 17 is/are rejected under 35 U.S.C. 103 as being unpatentable over Minta (US 20100186445 A1) in view of Tremblay (US 20170074583 A1). Regarding claims 7 and 13: Minta discloses all the limitations, except for a plurality of valves coupled to the plurality of fluid flow paths; a controller in electronic communication with at least one valve of the plurality of valves; and a plurality of sensors coupled to at least one of the wellbore or the plurality of fluid flow paths, the plurality of sensors being in electronic communication with the controller; wherein the controller is configured to actuate at least one valve of the plurality of valves, based at least in part on a signal from the plurality of sensors, to direct a flow of at least one portion of the gas. In other words, the difference between the prior art and the claim herein so far is the fact that valves along with a controller are provided to control distribution of the gas to the fluid flow paths. Nonetheless, Because Minta clearly discloses that feed stream is the side stream 11 of feed gas to be used as the refrigerant in expander loop 5 may be withdrawn from the feed gas stream 10 ([0019]); and because it is known in the art to use a valve along with a controller to optimize flow control (see for example Tremblay, [0064-0065]); it would have been obvious to one of ordinary skill in the art before the effective filing date to have provided the apparatus/method of Minta with the claimed arrangement above. One on ordinary skill in the art would have recognized that doing so would have yielded the predictable result of optimizing gas flow to their respective fluid flow paths; whereby optimal processing of gas stream will be achieved. Regarding claim 17: If a prior art device, in its normal and usual operation, would necessarily perform the method claimed, then the method claimed will be considered to be anticipated by the prior art device. Thus, the method of claim 17, as claimed, would necessarily result from the normal operation of the apparatus of claim 7. See MPEP 2112.02. Allowable Subject Matter Claims 3, 6, 9, 12, and 19-20 are objected to as being dependent upon a rejected base claim, but would be allowable if rewritten in independent form including all of the limitations of the base claim and any intervening claims. The following is a statement of reasons for the indication of allowable subject matter: There is no teaching in the prior art of record that would, reasonably and absent impermissible hindsight, motivate one of ordinary skill in the art to modify the teachings of the prior art of record so as to (i) cool the gas in the second segment via the at least one heat exchanger before allowing the gas in the second segment to flow through the expander as required by claims 6, 12, and 19; at least because the at least one heat exchanger of Minta is configured instead to heat the gas in the second segment (see Minta, [0021] & [0024]); and (ii) to provide the plurality of fluid flow paths with at least one of: (a) a third segment in fluid communication with the expander and the pipeline, wherein the gas in the third segment bypasses the at least one heat exchanger as the gas in the third segment is delivered from the wellbore to the expander; or (b) a fourth segment in fluid communication with the one or more storage devices, wherein the gas in the fourth segment bypasses the at least one heat exchanger as the gas in the fourth segment is delivered from the wellbore to the one or more storage devices. Response to Arguments Applicants’ arguments filed on 06/17/2026 have been fully considered. Applicant submitted that side stream 11 of Minta is fed to an expander loop 5 as refrigerant; not a pipeline as required by Claim 1. It was pointed out to the applicant that loop #5 qualifies as a pipeline at least because it is used to transport gas ([0024]). Also, “a pipeline” has not been claimed as part of the invention. Thus, the phrase “in fluid communication with a pipeline” is a functional or relational limitation; rather than a structural component of the device. Thus, even if applicant argues that loop #5 is not a pipeline, segment #11 is capable of connecting to a pipeline to allow fluid flow. Accordingly, Minta meets all the limitations of “a second segment in fluid communication with a pipeline”. Accordingly, Minta clearly discloses the arrangement of the plurality of fluid flow paths as required by claim 1. Applicant further submitted that claim 14 recites, "storing the gas in the first segment in the one or more containers as CNG"; which is not contemplated by Minta. It was pointed out to the applicant that either #80 or any structure that receives LNG #15 is a container that stores the gas in the first segment. Gas-liquid separation unit #80 is clearly a container that stores CNG (see [0025]). It was also pointed out to the applicant that “one or more containers” has not been claimed as part of the invention. Thus, the phrase “in fluid communication with one or more containers” is a functional or relational limitation; rather than a structural component of the device. Thus, Minta disclose all the limitations of independent Claim 14. Refer to the 102 and 103 rejection sections above for the detailed rejection of the claims. Conclusion Applicant's amendment necessitated the new ground(s) of rejection presented in this Office action. Accordingly, THIS ACTION IS MADE FINAL. See MPEP § 706.07(a). Applicant is reminded of the extension of time policy as set forth in 37 CFR 1.136(a). A shortened statutory period for reply to this final action is set to expire THREE MONTHS from the mailing date of this action. In the event a first reply is filed within TWO MONTHS of the mailing date of this final action and the advisory action is not mailed until after the end of the THREE-MONTH shortened statutory period, then the shortened statutory period will expire on the date the advisory action is mailed, and any nonprovisional extension fee (37 CFR 1.17(a)) pursuant to 37 CFR 1.136(a) will be calculated from the mailing date of the advisory action. In no event, however, will the statutory period for reply expire later than SIX MONTHS from the mailing date of this final action. Any inquiry concerning this communication or earlier communications from the examiner should be directed to LIONEL W NOUKETCHA whose telephone number is (571)272-8438. The examiner can normally be reached on Mon - Fri: 08:00 AM - 04:00 PM. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Frantz Jules can be reached on 571-272-6681. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of an application may be obtained from the Patent Application Information Retrieval (PAIR) system. Status information for published applications may be obtained from either Private PAIR or Public PAIR. Status information for unpublished applications is available through Private PAIR only. For more information about the PAIR system, see http://pair-direct.uspto.gov. Should you have questions on access to the Private PAIR system, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative or access to the automated information system, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /LIONEL NOUKETCHA/Primary Examiner, Art Unit 3763
Read full office action

Prosecution Timeline

Sep 18, 2024
Application Filed
Mar 17, 2026
Non-Final Rejection mailed — §102, §103
Jun 17, 2026
Response Filed
Sep 02, 2026
Final Rejection mailed — §102, §103
Oct 08, 2026
Applicant Interview (Telephonic)
Oct 08, 2026
Examiner Interview Summary

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12760950
REFRIGERATOR AND CONTROL METHOD THEREOF
2y 9m to grant Granted Oct 13, 2026
Patent 12759370
Heat Pump Systems Having Deicing Features
2y 0m to grant Granted Oct 13, 2026
Patent 12753957
HEAT PUMP SYSTEM AND CONTROL METHOD THEREOF
2y 1m to grant Granted Oct 06, 2026
Patent 12747880
AIR CONDITIONER, CONTROL SYSTEM AND CONTROL METHOD OF AIR CONDITIONER
2y 5m to grant Granted Sep 29, 2026
Patent 12747895
COLD WATER TANK ASSEMBLY AND MANUFACTURING METHOD THEREOF
1y 10m to grant Granted Sep 29, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

3-4
Expected OA Rounds
81%
Grant Probability
94%
With Interview (+13.4%)
2y 5m (~4m remaining)
Median Time to Grant
Moderate
PTA Risk
Based on 600 resolved cases by this examiner. Grant probability derived from career allowance rate.