Notice of Pre-AIA or AIA Status
The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA .
In the event the determination of the status of the application as subject to AIA 35 U.S.C. 102 and 103 (or as subject to pre-AIA 35 U.S.C. 102 and 103) is incorrect, any correction of the statutory basis for the rejection will not be considered a new ground of rejection if the prior art relied upon, and the rationale supporting the rejection, would be the same under either status. (PBA)
DETAILED ACTION
Claims status
Claims 1-22 are pending as the applicant filed Preliminary Amendment on 09/26/2024.
Citation of Relevant Prior Art
The prior art made of record and not relied upon is considered pertinent to applicant’s disclosure. See MPEP 707.05. Although the prior art discloses several unclaimed, some claimed limitation. The closest Prior Art of record are considered to be defined by:
JIN, CN 110258202 A, Date Published: 2019-09-20, B01B 25/28 described a rail road and associated connected rail and bearing vehicle wheel mechanism with iron (iron wheel mechanism the same below) for short, wherein the conjoined rail are in turn connected, parallel embedded in the high-grade highway and road, directly milling the phase image on the guide rail on the rail bed spraying asphalt slurry adhered non-woven fabric and then the track rail arranged in turn, then the gap fixed asphalt mortar tank for asphalt road wheel mark surface of the two sides of the rail is adhered on high-type highway white quartz sand cloth.
ZHANG, CN 114204659 A, Date Published: 2022-03-18, CPC H01J 7/35 described an electric automobile solar mobile power supply, charging device, wherein the technical characteristics are as follows: supplying power to the running vehicle, the charging facility uses direct current or alternating current power supply, the electric is sent on the contact slide rail (301) and the contact slide rail (311), the easily exposed side of the wire (rail) is grounded, the bracket (309) bearing the contact slide rail and the non-grounded rail (wire) have good insulation; the device is provided with (driving) 'wheel (302) and collecting shoe (303) of (switching)' trolley (308) on the contact slide rail (301) and the contact slide rail (311); the lower part of the middle part of the trolley (308) is provided with an electromechanical connecting arm (304) mechanism of automatically retracting and capable of keeping the electric and mechanical connection with the charging vehicle, an electromechanical connecting arm (304) and a trolley (308) is mechanically connected with a universal joint (306), an electromechanical connecting arm (304) is provided with a retracting spring mechanism a recycling wheel rope receiver (305) with clockwork spring, and a power supply, a charging interface (202); the track line is above the two sides of the road; the stress point of the traction of the trolley is under the centre of the lower part, the front and back are provided with four wheels capable of rotating left and right, the rotating angle limit mechanism limited at 15 degrees and below, the rail contact matched with it at the curve; the lower part of the wheel is inclined 5 degrees to 25 degrees, the track is also inclined; In this way, it can become better and stably finish the electric automobile solar mobile power supply, charging device.
Claim Rejections - 35 USC § 101
35 U.S.C. 101 reads as follows:
Whoever invents or discovers any new and useful process, machine, manufacture, or composition of matter, or any new and useful improvement thereof, may obtain a patent therefor, subject to the conditions and requirements of this title.
Claims 1-22 are rejected under 35 U.S.C. 101 because the claimed invention is directed to a judicial exception (i.e., a law of nature, a natural phenomenon, or an abstract idea) without significantly more.
Claim 1, Step 1 the claim is a process (or machine) (Yes),
Step 2A Prong One, does the claim recite an abstract idea? current claim related to a method for aligning linear network railway track measurement data corresponding to a segment of railway track collected during time separated track measurement campaigns, the method comprising:
receiving first linear network railway track measurement data collected during a first track measurement campaign performed during a first time period, wherein the first linear network railway track measurement data includes first data corresponding to a shape and condition of a geographical segment of track during the first time period appears is an abstract idea of mental process (MPEP 2106.04(a)) or data gathering equivalent to mathematical concept or mathematical manipulation function (MPEP 2106.04 (a) (2) (concept need not be expressed in mathematical symbols, because "[w]ords used in a claim operating on data to solve a problem can serve the same purpose as a formula), (OR Mathematical Concepts and Mental Processes) Step 2A Prong One: Yes.
Step 2A Prong Two, is the claim directed to an abstract idea? In other words, does claim recite additional elements that integrate the Judicial Exception into a practical application? the additional elements of receiving second linear network railway track measurement data collected during a second track measurement campaign performed during a second time period, wherein the second linear network railway track measurement data includes second data corresponding to the shape and condition of the geographical segment of track during the second time period are recited at a high level of generality and merely amount to a particular field of use (see MPEP 2106.05(h)) and/or insignificant post-solution activity (MPEP 2106.05(g)), this does not integrate the Judicial Exception into a practical application,
Step 2A Prong Two: NO.
Step 2B, Does the claim recite additional element that amount to significantly more than the Judicial exception? the additional elements of geographically aligning the first and second linear network railway track measurement data collected during the first and second measurement campaigns using the first and second data corresponding to the shape and condition of the geographical segment of track collected in the first and second measurement campaigns to thereby generate first aligned data appears to be field of use (See MPEP 2106.05(h) and MPEP 2106.05(f)) and/or merely amounts to insignificant extra-solution output of the results (see MPEP 2106.05(g)) and therefore fails to integrate the abstract idea into a practical application or amount to significantly more. Step 2B: No. claim 1 not eligible.
Claim 14, Step 1 the claim is a process (or machine) (Yes),
Step 2A Prong One, does the claim recite an abstract idea? current claim related to a computing system comprising: receive linear network railway track measurement data associated with a plurality of measurement campaigns for a geographic segment of rail track; and
for each measurement campaign received: identify a curvature of measurement points along the geographic segment of rail track;
determine a slope for the measurement points of a curve;
identify a beginning and an end of at least one curve located within the segment of track based upon a relative value of the slope compared to a threshold appears is an abstract idea of mental process (MPEP 2106.04(a)) or data gathering equivalent to mathematical concept or mathematical manipulation function (MPEP 2106.04 (a) (2) (concept need not be expressed in mathematical symbols, because "[w]ords used in a claim operating on data to solve a problem can serve the same purpose as a formula), (OR Mathematical Concepts and Mental Processes) Step 2A Prong One: Yes.
Step 2A Prong Two, is the claim directed to an abstract idea? In other words, does claim recite additional elements that integrate the Judicial Exception into a practical application? the additional elements of a processor; a non-transitory computer readable storage medium having stored thereon computer readable instructions that, when executed by the processor, cause the computing system to perform a process of automatically aligning different rail track segment measurement campaigns, the computing system caused are recited at a high level of generality and merely amount to a particular field of use (see MPEP 2106.05(h)) and/or insignificant post-solution activity (MPEP 2106.05(g)), this does not integrate the Judicial Exception into a practical application,
Step 2A Prong Two: NO.
Step 2B, Does the claim recite additional element that amount to significantly more than the Judicial exception? the additional elements of align the beginning of the at least one curve; and align the end of the at least one curve appears to be field of use (See MPEP 2106.05(h) and MPEP 2106.05(f)) and/or merely amounts to insignificant extra-solution output of the results (see MPEP 2106.05(g)) and therefore fails to integrate the abstract idea into a practical application or amount to significantly more. Step 2B: No. claim 14 not eligible
Claim 21, Step 1 the claim is a process (or machine) (Yes),
Step 2A Prong One, does the claim recite an abstract idea? current claim related to a method of aligning measurement data for a segment of railway track, comprising: receiving a first set of linear network railway track measurement data relating to physical characteristics of the segment of railway track appears is an abstract idea of mental process (MPEP 2106.04(a)) or data gathering equivalent to mathematical concept or mathematical manipulation function (MPEP 2106.04 (a) (2) (concept need not be expressed in mathematical symbols, because "[w]ords used in a claim operating on data to solve a problem can serve the same purpose as a formula), (OR Mathematical Concepts and Mental Processes) Step 2A Prong One: Yes.
Step 2A Prong Two, is the claim directed to an abstract idea? In other words, does claim recite additional elements that integrate the Judicial Exception into a practical application? the additional elements of receiving a second set of linear network railway track measurement data relating to the physical characteristics of the segment of railway track are recited at a high level of generality and merely amount to a particular field of use (see MPEP 2106.05(h)) and/or insignificant post-solution activity (MPEP 2106.05(g)), this does not integrate the Judicial Exception into a practical application,
Step 2A Prong Two: NO.
Step 2B, Does the claim recite additional element that amount to significantly more than the Judicial exception? the additional elements of aligning the first set of linear network railway track measurement data with the second set of linear network railway track measurement data using the physical characteristics of the segment of railway track to align the physical characteristics to a track shape appears to be field of use (See MPEP 2106.05(h) and MPEP 2106.05(f)) and/or merely amounts to insignificant extra-solution output of the results (see MPEP 2106.05(g)) and therefore fails to integrate the abstract idea into a practical application or amount to significantly more. Step 2B: No. claim 21 not eligible
Claim 2 related to wherein the first and second data corresponding to the shape and condition of the geographical segment of track includes curvature data for one or more curves included in the geographical segment of track, geographically aligning the first and second linear network railway track measurement data comprises: determining slopes of the one or more curves of the geographical segment of track based on the curvature data; identifying a beginning and ending of the one or more curves based on the slopes of a first transition zone and second transition zone; and aligning the beginning and ending of the curves, its recites further data characterization and mathematical concepts that are part of the abstract idea, claim 2 not eligible.
Claim 3 related to the first and second linear network railway track measurement data further includes one or more of track shape data, track profile data, track alignment data, curvature data, rail shape data, rail profile data, rail wear data, third rail data, or rail overhead wire data, its recites further data characterization and mathematical concepts that are part of the abstract idea, claim 3 not eligible.
Claim 4 related to wherein the first and second linear network railway track measurement data is compiled into one of a table, a matrix, or a graph, its recites further data characterization and mathematical concepts that are part of the abstract idea, claim 4 not eligible.
Claim 5 related to the first and second linear network railway track measurement data stored in the table or matrix includes one of i) time data that specifies a sequential time relationship between the first and second linear network railway track measurement data or ii) Mass Gross Tonnage (MGT)usage data, its recites further data characterization and mathematical concepts that are part of the abstract idea, claim 5 not eligible.
Claim 6 related to the second linear network railway track measurement data includes fewer measurement points than the first linear network railway track measurement data, its recites further data characterization and mathematical concepts that are part of the abstract idea, claim 6 not eligible.
Claim 7 related to the geographical segment of track is located between one of two towns, two railroad switches, or two railroad stations, its recites further data characterization and mathematical concepts that are part of the abstract idea, claim 7 not eligible.
Claim 8 related to the second linear network railway track measurement data is offset from the first linear network railway track measurement data, wherein geographically aligning the first and second linear network railway track measurement data comprises: applying an offset value to the second linear network railway track measurement data so as to shift the second linear network railway track measurement data to align with the first linear network railway track measurement data, its recites further data characterization and mathematical concepts that are part of the abstract idea, claim 8 not eligible.
Claim 9 related to the first and second linear network railway track measurement data are aligned without the use of an Absolute Position Based system or method or a Relative Position Based system or method, its recites further data characterization and mathematical concepts that are part of the abstract idea, claim 9 not eligible.
Claim 10 related to receiving third linear network railway track measurement data collected during a third measurement campaign performed during a third time period, wherein the third linear network railway track measurement data includes third data corresponding to the shape and condition of the geographical segment of track during the third time period; and geographically aligning the third linear network railway track measurement data collected during the third measurement campaign with the first aligned data using the third data corresponding to the shape and condition of the geographical segment of track collected in the third measurement campaign to thereby generate second aligned data, its recites further data characterization and mathematical concepts that are part of the abstract idea, claim 10 not eligible.
Claim 11 related to the first and second measurement campaigns collect the first and second railway track measurement data about every 25 centimeters, its recites further data characterization and mathematical concepts that are part of the abstract idea, claim 11 not eligible.
Claim 12 related to the first and second measurement campaigns collect the first and second railway track measurement data at intervals less than every three meters, its recites further data characterization and mathematical concepts that are part of the abstract idea, claim 12 not eligible.
Claim 13 related to analyzing the first aligned data; and based on the analysis, characterizing a progression of one or more track defects in the geographical segment of track, its recites further data characterization and mathematical concepts that are part of the abstract idea, claim 13 not eligible.
Claim 15 related to generate aligned linear network railway track measurement data that includes the linear network railway track measurement data of the plurality of measurement campaigns for the segment of rail track that has had the beginning and the end of the least one curve aligned, its recites further data characterization and mathematical concepts that are part of the abstract idea, claim 15 not eligible.
Claim 16 related to wherein the segment of rail track is located between one of two towns, two railroad switches, or two railroad stations, its recites further data characterization and mathematical concepts that are part of the abstract idea, claim 16 not eligible.
Claim 17 related to where the linear network railway track measurement data includes one or more of track shape data, track profile data, track alignment data, curvature data, rail shape data, rail profile data, rail wear data, third rail data, or rail overhead wire data, its recites further data characterization and mathematical concepts that are part of the abstract idea, claim 17 not eligible.
Claim 18 related to the geographic segment of rail track includes a plurality of curves, computing system further caused to: identify a beginning and an end of the plurality of curves located within the segment of track based upon a relative value of the slope compared to a threshold; align the beginning of the plurality of curves; and align the end of the plurality of curves, its recites further data characterization and mathematical concepts that are part of the abstract idea, claim 18 not eligible.
Claim 19 related to apply an offset value to the linear network railway track measurement data of one of the plurality of measurement campaigns, its recites further data characterization and mathematical concepts that are part of the abstract idea, claim 19 not eligible.
Claim 20 related to the linear network railway track measurement data of one of the plurality of measurement campaigns includes less measurement points than the linear network railway track measurement data of at least one other of one of the plurality of measurement campaigns, its recites further data characterization and mathematical concepts that are part of the abstract idea, claim 20 not eligible.
Claim 22 related to receiving a third set of linear network railway track measurement data relating to the physical characteristics of the segment of railway track; and aligning the third set of linear network railway track measurement data with the first and second sets of linear network railway track measurement data, its recites further data characterization and mathematical concepts that are part of the abstract idea, claim 22 not eligible.
Claim Rejections - 35 USC § 102
The following is a quotation of the appropriate paragraphs of 35 U.S.C. 102 that form the basis for the rejections under this section made in this Office action:
A person shall be entitled to a patent unless –
(a)(1) the claimed invention was patented, described in a printed publication, or in public use, on sale, or otherwise available to the public before the effective filing date of the claimed invention.
Claim(s) 1-22 are rejected under 35 U.S.C. 102 (a) (1) as being anticipated by MA, CN 202054037 U, Date Published: 2011-11-30, CPC B61K 9/08.
Regarding claim 1:
MA described a method for aligning linear network railway track measurement data corresponding to a segment of railway track collected during time separated track measurement campaigns (0002, 0006, curve shape of railway track changes with time so as to continuously deviates from its design value, when the deviation value reaches a certain range, will influence the driving, even cause damage to safety, in order to measure the value of the offset in the one large-scale. the plurality of track measuring device occur, linear manner), the method comprising:
receiving first linear network railway track measurement data collected during a first track measurement campaign performed during a first time period, wherein the first linear network railway track measurement data includes first data corresponding to a shape and condition of a geographical segment of track during the first time period (0004, the mobile measuring trolley, form a track curve parameter pick-up measuring system by the mobile measuring trolley and the fixed measuring trolley; in addition, further can be equipped with measuring geometry for determining midpoint and the rail along the distance measuring sensor of the distance on the mobile measuring trolley or the fixed measuring trolley; for measuring the height difference of the left and right two rail inclination angle sensor measuring rotary encoder of the moving distance of the car, a set of display track theoretical parameter and actual parameter and calculating the track parameter computer two difference, 0023, real-time measuring out itself to track the relative distance h );
receiving second linear network railway track measurement data collected during a second track measurement campaign performed during a second time period, wherein the second linear network railway track measurement data includes second data corresponding to the shape and condition of the geographical segment of track during the second time period (0004, the mobile measuring trolley, form a track curve parameter pick-up measuring system by the mobile measuring trolley and the fixed measuring trolley; in addition, further can be equipped with measuring geometry for determining midpoint and the rail along the distance measuring sensor of the distance on the mobile measuring trolley or the fixed measuring trolley; for measuring the height difference of the left and right two rail inclination angle sensor measuring rotary encoder of the moving distance of the car, a set of display track theoretical parameter and actual parameter and calculating the track parameter computer two difference); and
geographically aligning the first and second linear network railway track measurement data collected during the first and second measurement campaigns using the first and second data corresponding to the shape and condition of the geographical segment of track collected in the first and second measurement campaigns to thereby generate first aligned data (0006, the utility model adopts absolute coordinate measuring system, construction method based on absolute coordinate in upper construction method based on the relative coordinates by adding a set ground coordinate control point; through these control points can be on each one point of the rail or rail to control the actual ground absolute coordinate of marking point linear calculated, so the reply in the construction to theoretical absolute coordinate position, effectively solve relative linear offset coordinate construction method. rotation).
Regarding claim 14:
MA described a computing system comprising: a processor;
a non-transitory computer readable storage medium having stored thereon computer readable instructions that, when executed by the processor, cause the computing system to perform a process of automatically aligning different rail track segment measurement campaigns, the computing system caused to (0012, 0015, using computer system):
receive linear network railway track measurement data associated with a plurality of measurement campaigns for a geographic segment of rail track; and
for each measurement campaign received: identify a curvature of measurement points along the geographic segment of rail track (0002, 0006, curve shape of railway track changes with time so as to continuously deviates from its design value, when the deviation value reaches a certain range, will influence the driving, even cause damage to safety, in order to measure the value of the offset in the one large-scale. the plurality of track measuring device occur, linear manner);
determine a slope for the measurement points of a curve (0016, based on the track curve parameter measuring device for measuring method);
identify a beginning and an end of at least one curve located within the segment of track based upon a relative value of the slope compared to a threshold;
align the beginning of the at least one curve; and
align the end of the at least one curve (0006, the utility model adopts absolute coordinate measuring system, construction method based on absolute coordinate in upper construction method based on the relative coordinates by adding a set ground coordinate control point; through these control points can be on each one point of the rail or rail to control the actual ground absolute coordinate of marking point linear calculated, so the reply in the construction to theoretical absolute coordinate position, effectively solve relative linear offset coordinate construction method. Rotation, 0016, 0020, based on the track curve parameter measuring device for measuring method).
Regarding claim 21:
MA described a method of aligning measurement data for a segment of railway track, comprising:
receiving a first set of linear network railway track measurement data relating to physical characteristics of the segment of railway track (0002, 0006, curve shape of railway track changes with time so as to continuously deviates from its design value, when the deviation value reaches a certain range, will influence the driving, even cause damage to safety, in order to measure the value of the offset in the one large-scale. the plurality of track measuring device occur, linear manner) ;
receiving a second set of linear network railway track measurement data relating to the physical characteristics of the segment of railway track (0004, the mobile measuring trolley, form a track curve parameter pick-up measuring system by the mobile measuring trolley and the fixed measuring trolley; in addition, further can be equipped with measuring geometry for determining midpoint and the rail along the distance measuring sensor of the distance on the mobile measuring trolley or the fixed measuring trolley; for measuring the height difference of the left and right two rail inclination angle sensor measuring rotary encoder of the moving distance of the car, a set of display track theoretical parameter and actual parameter and calculating the track parameter computer two difference, 0023, real-time measuring out itself to track the relative distance h );; and
aligning the first set of linear network railway track measurement data with the second set of linear network railway track measurement data using the physical characteristics of the segment of railway track to align the physical characteristics to a track shape (0006, the utility model adopts absolute coordinate measuring system, construction method based on absolute coordinate in upper construction method based on the relative coordinates by adding a set ground coordinate control point; through these control points can be on each one point of the rail or rail to control the actual ground absolute coordinate of marking point linear calculated, so the reply in the construction to theoretical absolute coordinate position, effectively solve relative linear offset coordinate construction method. Rotation, 0016, 0020, based on the track curve parameter measuring device for measuring method).
Regarding claim 2, MA further described wherein the first and second data corresponding to the shape and condition of the geographical segment of track includes curvature data for one or more curves included in the geographical segment of track, geographically aligning the first and second linear network railway track measurement data comprises (abstract, form a track curve parameter pick-up measuring system): determining slopes of the one or more curves of the geographical segment of track based on the curvature data; identifying a beginning and ending of the one or more curves based on the slopes of a first transition zone and second transition zone; and aligning the beginning and ending of the curves (0012, form a track curve parameter pick-up measuring system by the mobile measuring trolley and the fixed measuring trolley).
Regarding claim 3, MA further described where the first and second linear network railway track measurement data further includes one or more of track shape data (0012, form a track curve parameter pick-up measuring system by the mobile measuring trolley and the fixed measuring trolley; In addition, it can be provided for determining measuring geometrical point along the distance measuring sensor with the rail distance, for measuring left and right two rail height difference of inclination angle sensors,), track profile data, track alignment data, curvature data, rail shape data, rail profile data, rail wear data, third rail data, or rail overhead wire data.
Regarding claim 4, MA further described wherein the first and second linear network railway track measurement data is compiled into one of a table (0023, real-time data @ min multiple line table data), a matrix, or a graph.
Regarding claim 5, MA further described the first and second linear network railway track measurement data stored in the table or matrix includes one of i) time data that specifies a sequential time relationship between the first and second linear network railway track measurement data (0023, real-time sequential time) or ii) Mass Gross Tonnage (MGT)usage data.
Regarding claim 6, MA further described the second linear network railway track measurement data includes fewer measurement points than the first linear network railway track measurement data (0023, real-time manner depend on track data more or less).
Regarding claim 7, MA further described the geographical segment of track is located between one of two towns (0023, real-time manner any where), two railroad switches, or two railroad stations.
Regarding claim 8, MA further described the second linear network railway track measurement data is offset from the first linear network railway track measurement data, wherein geographically aligning the first and second linear network railway track measurement data comprises: applying an offset value to the second linear network railway track measurement data so as to shift the second linear network railway track measurement data to align with the first linear network railway track measurement data (0020-0023, offset target @ real-time manner any where).
Regarding claim 9, MA further described the first and second linear network railway track measurement data are aligned without the use of an Absolute Position Based system (0004, absolute parameter coordinate measuring system) or method or a Relative Position Based system or method.
Regarding claim 10, MA further described receiving third linear network railway track measurement data collected during a third measurement campaign performed during a third time period, wherein the third linear network railway track measurement data includes third data corresponding to the shape and condition of the geographical segment of track during the third time period; and geographically aligning the third linear network railway track measurement data collected during the third measurement campaign with the first aligned data using the third data corresponding to the shape and condition of the geographical segment of track collected in the third measurement campaign to thereby generate second aligned data (0014, 0020-0023, @ real-time manner any time or process in time data including curve track data).
Regarding claim 11, MA further described wherein the first and second measurement campaigns collect the first and second railway track measurement data about every 25 centimeters (0020-0023, @ real-time manner any time or process in time data including curve track data).
Regarding claim 12, MA further described the first and second measurement campaigns collect the first and second railway track measurement data at intervals less than every three meters (0020-0023, @ real-time manner any time or process in time data including curve track data).
Regarding claim 13, MA further described analyzing the first aligned data; and based on the analysis, characterizing a progression of one or more track defects in the geographical segment of track (0020-0023, @ real-time manner any time or process in time data including curve track data).
Regarding claim 15, MA further described generate aligned linear network railway track measurement data that includes the linear network railway track measurement data of the plurality of measurement campaigns for the segment of rail track that has had the beginning and the end of the least one curve aligned (0006, the utility model adopts absolute coordinate measuring system, construction method based on absolute coordinate in upper construction method based on the relative coordinates by adding a set ground coordinate control point; through these control points can be on each one point of the rail or rail to control the actual ground absolute coordinate of marking point linear calculated, so the reply in the construction to theoretical absolute coordinate position, effectively solve relative linear offset coordinate construction method. Rotation, 0016, 0020, based on the track curve parameter measuring device for measuring method).
Regarding claim 16, MA further described wherein the segment of rail track is located between one of two towns (0023, real-time manner any where), two railroad switches, or two railroad stations.
Regarding claim 17, MA further described where the linear network railway track measurement data includes one or more of track shape data (0023, real-time manner any where, curve track data), track profile data, track alignment data, curvature data, rail shape data, rail profile data, rail wear data, third rail data, or rail overhead wire data.
Regarding claim 18, MA further described wherein the geographic segment of rail track includes a plurality of curves, computing system further caused to: identify a beginning and an end of the plurality of curves located within the segment of track based upon a relative value of the slope compared to a threshold; align the beginning of the plurality of curves; and align the end of the plurality of curves (0023, real-time manner any where, curve track data).
Regarding claim 19, MA further described apply an offset value to the linear network railway track measurement data of one of the plurality of measurement campaigns (0020, offset optical target in the subsequent image relative to the initial position of the method of the image).
Regarding claim 20, MA further described wherein the linear network railway track measurement data of one of the plurality of measurement campaigns includes less measurement points than the linear network railway track measurement data of at least one other of one of the plurality of measurement campaigns (0023, real-time manner any where, curve track data).
Regarding claim 22, MA further described receiving a third set of linear network railway track measurement data relating to the physical characteristics of the segment of railway track; and aligning the third set of linear network railway track measurement data with the first and second sets of linear network railway track measurement data (0023, real-time manner any where, curve track data).
Contact information
Any inquiry concerning this communication or earlier communications from the examiner should be directed to Tung Lau whose telephone number is (571)272-2274, email is Tungs.lau@uspto.gov. The examiner can normally be reached on Tuesday-Friday 7:00 AM-5:00 PM EST.
Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice.
If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, TURNER SHELBY, can be reached on 571-272-6334. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300.
Information regarding the status of an application may be obtained from the Patent Application Information Retrieval (PAIR) system. Status information for published applications may be obtained from either Private PAIR or Public PAIR. Status information for unpublished applications is available through Private PAIR only. For more information about the PAIR system, see https://ppair-my.uspto.gov/pair/PrivatePair. Should you have questions on access to the Private PAIR system, contact the Electronic Business Center (EBC) at 866-217-9197 (toll- free). If you would like assistance from a USPTO Customer Service Representative or access to the automated information system, call 800-786-9199 (IN USA OR CANADA) or 571-272- 1000.
/TUNG S LAU/Primary Examiner, Art Unit 2857
Technology Center 2800
October 26, 2026