Prosecution Insights
Last updated: October 26, 2026
Application No. 18/941,803

TECHNIQUES FOR TIME DIVISION DUPLEXING PATTERNS FOR USER EQUIPMENT WITH FULL SUB-BAND FULL DUPLEX CAPABILITY

Non-Final OA §102§103
Filed
Nov 08, 2024
Examiner
TSE, YOUNG TOI
Art Unit
2469
Tech Center
2400 — Computer Networks
Assignee
Qualcomm Incorporated
OA Round
1 (Non-Final)
89%
Grant Probability
Favorable
1-2
OA Rounds
5m
Est. Remaining
98%
With Interview

Examiner Intelligence

Grants 89% — above average
89%
Career Allowance Rate
928 granted / 1040 resolved
+31.2% vs TC avg
Moderate +8% lift
Without
With
+8.5%
Interview Lift
resolved cases with interview
Typical timeline
2y 5m
Avg Prosecution
26 currently pending
Career history
1075
Total Applications
across all art units

Statute-Specific Performance

§101
5.8%
-34.2% vs TC avg
§103
20.1%
-19.9% vs TC avg
§102
17.6%
-22.4% vs TC avg
§112
48.3%
+8.3% vs TC avg
Black line = Tech Center average estimate • Based on career data from 1040 resolved cases

Office Action

§102 §103
DETAILED ACTION Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . Specification The lengthy specification has not been checked to the extent necessary to determine the presence of all possible minor errors. Applicant’s cooperation is requested in correcting any errors of which applicant may become aware in the specification. Claim Objections Claims 1-20 are objected to because of the following informalities: 1. (Proposed Amendment) A user equipment (UE) for wireless communication, the UE comprising: one or more memories; and one or more processors, coupled to the one or more memories, configured to cause the UE to: receive a configuration for sub-band full duplex (SBFD) resources in at least a first time division duplexing (TDD) pattern; transmit an uplink communication in an SBFD slot or symbol in accordance with the SBFD resources; and receive a downlink communication in the SBFD slot or symbol in accordance with the SBFD resources. 12. (Proposed Amendment) The UE of claim 11, wherein at least one of the one or more periodicities [[are]] is semi-statically configured. 15. (Proposed Amendment) A method of wireless communication performed by a user equipment (UE), the method comprising: receiving a configuration for sub-band full duplex (SBFD) resources in at least a first time division duplexing (TDD) pattern; transmitting an uplink communication in an SBFD slot or symbol in accordance with the SBFD resources; and receiving a downlink communication in the SBFD slot or symbol in accordance with the SBFD resources. 20. (Proposed Amendment) An apparatus for wireless communication, the apparatus comprising: means for receiving a configuration for sub-band full duplex (SBFD) resources in at least a first time division duplexing (TDD) pattern; means for transmitting an uplink communication in an SBFD slot or symbol in accordance with the SBFD resources; and means for receiving a downlink communication in the SBFD slot or symbol in accordance with the SBFD resources. Claims 2-11, 13, and 14 are dependent either directly or indirectly from claim 1, therefore they are also objected. Claims 16-19 are all dependent on claim 15, therefore they are also objected. Appropriate correction is required. Claim Rejections - 35 USC § 102 In the event the determination of the status of the application as subject to AIA 35 U.S.C. 102 and 103 (or as subject to pre-AIA 35 U.S.C. 102 and 103) is incorrect, any correction of the statutory basis (i.e., changing from AIA to pre-AIA ) for the rejection will not be considered a new ground of rejection if the prior art relied upon, and the rationale supporting the rejection, would be the same under either status. The following is a quotation of the appropriate paragraphs of 35 U.S.C. 102 that form the basis for the rejections under this section made in this Office action: A person shall be entitled to a patent unless – (a)(1) the claimed invention was patented, described in a printed publication, or in public use, on sale, or otherwise available to the public before the effective filing date of the claimed invention. (a)(2) the claimed invention was described in a patent issued under section 151, or in an application for patent published or deemed published under section 122(b), in which the patent or application, as the case may be, names another inventor and was effectively filed before the effective filing date of the claimed invention. Claims 1-2, 4-7, 11-12, 14-16, and 19-20 are rejected under 35 U.S.C. 102(a)(2) as being anticipated by YOU et al. (2026/0254602 A1), hereinafter “You”. You illustrates signaling and operation methods in FIG. 20 between a base station and a UE and illustrates a wireless device in FIG. 21 comprising a first wireless device 100 and a second wireless device 200, wherein each of the first wireless device 100 and the second wireless device 200 includes one or more processors 102/202, one or more memories 104/204, one or more transceivers 106/206, and one or more antennas 108/208. You teaches that the UE performs DL reception in an SBFD symbol, i) the UE may perform DL reception using frequency resources within the DL subband. ii) The UE does not perform DL reception on frequency resources outside the DL subband. The UE does not perform DL reception using frequency resources outside the DL subband within the DL BWP. Paragraph [0196]. You also teaches that If the UE performs UL transmission on SBFD symbols, i) the UE may use frequency resources within the UL subband to perform UL transmission. The UE may use frequency resources within the UL subband to perform UL transmission within the UL BWP. ii) The UE does not perform UL transmission on frequency resources other than the UL subband. The UE does not perform UL transmission using frequency resources other than the UL subband within the UL BWP. Paragraph [0197]. You further teaches that if pattern 1 is indicated by the TDD pattern, then: i) the UE may determine that the SBFD symbol resource exists within the time duration of (P+P2)*N′ msec to (P+P2)*N′+P msec relative to the start of each period within the duration of each period. Or ii) the UE determines that the SBFD symbol resource exists within the pattern1 resource, which is the N′th resource within the duration of each period. Alternatively, if pattern 2 is dictated by the TDD pattern, then: i) the UE may determine that the SBFD symbol resource exists within a time duration of (P+P2)*N′+P msec to (P+P2)*(N′+1) msec relative to the start of each period within the duration of each period. Or ii) the UE determines that the SBFD symbol resource is present in the pattern2 resource, which is the N′th resource within the duration of each period. Based on the starting point of the time duration in which the SBFD symbol exists, as determined in 1) above, the UE determines that time resources consisting of consecutive symbols as long as the SBFD symbol duration from the SBFD symbol offset location constitute the SBFD symbol resource. That is, if pattern1 is indicated by the TDD pattern, the UE determines that a contiguous time resource equal to the SBFD symbol duration from the SBFD symbol offset location based on the location of (P+P2)*N′ msec within each period constitutes the SBFD symbol resource. Alternatively, if pattern 2 is indicated by the TDD pattern, the UE determines that a contiguous time resource equal to the SBFD symbol duration from the SBFD symbol offset location based on the location of (P+P2)*N′+P msec within each period constitutes the SBFD symbol resource. Paragraphs [0290]-[0292]. Regarding claim 1, You illustrates a user equipment (UE) in FIG. 21 for wireless communication, comprising: one or more memories (104 or 204); and one or more processors (102 or 202), coupled to the one or more memories, configured to cause the UE to: receive a configuration for sub-band full duplex (SBFD) resources in at least a first time division duplexing (TDD) pattern (the UE receiving a TDD pattern indicating SBFD configurations: “if pattern 1 is indicated by the TDD pattern, the UE determines... the SBFD symbol resource.” It also describes an alternative pattern 2); transmit an uplink communication in an SBFD slot or symbol in accordance with the SBFD resources (If the UE performs UL transmission on SBFD symbols... the UE may use frequency resources within the UL subband to perform UL transmission); and receive a downlink communication in the SBFD slot or symbol in accordance with the SBFD resources (the UE configured to perform DL reception in an SBFD symbol, i) the UE may perform DL reception using frequency resources within the DL subband). Regarding claim 15, it is a method claim with steps that correspond to the claim features recited in apparatus claim 1 above. Regarding claim 20, the disclosed structure performing the recited function corresponds directly to the claim features recited in apparatus claim 1. Regarding claims 2 and 16, You explicitly defines and distinguishes configurations for SBFD resources using both a first TDD pattern (pattern 1) and a second TDD pattern (pattern 2). Pattern 1 is indicated by the TDD pattern, specifying the exact time durations and resource locations for SBFD symbols. Pattern 2 is dictated by the TDD pattern, defining its distinct time duration relative to the period start. Regarding claim 4, You directly links SBFD symbol resources to an indicated TDD pattern, states that the SBFD symbol resources are determined if pattern 1 is indicated by the TDD pattern or if pattern 2 is dictated by the TDD pattern, and explicitly derives the timing and existence of SBFD symbols from a TDD pattern, it inherently relies on the fundamental symbol types (such as downlink or flexible symbols) defined by that very same TDD pattern. Regarding claim 5, the details of pattern 1 and pattern 2 are as options indicated by a TDD pattern, they are directly applied to the first TDD pattern and the second TDD pattern. You also provides concrete formulas, such as time durations from (P+P₂)*N' to (P+P₂)*N'+P msec and frequency subband boundaries. These details explicitly show how the SBFD pattern allocates the SBFD resources. Regarding claims 6 and 7, You provides the exact structural and operational definitions (Pattern 1 and Pattern 2 timing and frequency rules) required to configure and allocate the distinct sets of SBFD resources across different TDD patterns. You also explicitly outlines how SBFD symbol resources are determined using specific time durations and formulas (such as P, P₂, and N'), which directly corresponds to defining the first SBFD pattern and the second SBFD pattern. You further specifies the exact boundaries of DL and UL subbands within a bandwidth part (BWP), explaining how different sets of SBFD resources are partitioned and allocated under different TDD pattern indicators. Regarding claims 11-12 and 19, You explicitly describes pattern 1 and pattern 2 dictated by the TDD pattern and defines the SBFD resource locations relative to the start of each period (within the duration of each period), establishing a recurring, periodic time structure using parameters like duration P, P₂, and index N'. The fixed time durations and period formulas (P, P₂) function as semi-statically configured parameters that dictate where the SBFD symbols appear across the periodic frames. Regarding claim 14, You details specific configurations, such as frequency subband restrictions for DL/UL and time duration formulas like (P+P2)*N′ msec for Pattern 1 and Pattern 2. Claim 14 specifies allocation using “default SBFD symbols.” You provides the explicit procedural and mathematical framework used to establish these default or configured TDD patterns, making the mechanism a matter of explicit technical disclosure rather than an implicit, hidden necessity. Claim Rejections - 35 USC § 103 In the event the determination of the status of the application as subject to AIA 35 U.S.C. 102 and 103 (or as subject to pre-AIA 35 U.S.C. 102 and 103) is incorrect, any correction of the statutory basis (i.e., changing from AIA to pre-AIA ) for the rejection will not be considered a new ground of rejection if the prior art relied upon, and the rationale supporting the rejection, would be the same under either status. The following is a quotation of 35 U.S.C. 103 which forms the basis for all obviousness rejections set forth in this Office action: A patent for a claimed invention may not be obtained, notwithstanding that the claimed invention is not identically disclosed as set forth in section 102, if the differences between the claimed invention and the prior art are such that the claimed invention as a whole would have been obvious before the effective filing date of the claimed invention to a person having ordinary skill in the art to which the claimed invention pertains. Patentability shall not be negated by the manner in which the invention was made. The factual inquiries for establishing a background for determining obviousness under 35 U.S.C. 103 are summarized as follows: 1. Determining the scope and contents of the prior art. 2. Ascertaining the differences between the prior art and the claims at issue. 3. Resolving the level of ordinary skill in the pertinent art. 4. Considering objective evidence present in the application indicating obviousness or nonobviousness. Claims 3, 8, and 17 are rejected under 35 U.S.C. 103 as being unpatentable over You. Regarding claims 3 and 8, as applied to 1, and claim 17 as applied to claim 15 discussed above, although You does not explicitly show or teach the claimed limitations that wherein the configuration for the SBFD resources allocates the SBFD resources in the first TDD pattern and allocates non-SBFD resources in a second TDD pattern as recited in claims 3 and 17, and wherein the configuration defines the first TDD pattern and a second TDD pattern, and wherein the SBFD resources are allocated only in the first TDD pattern as recited in claim 8, You explicitly discusses different operational schedules, referring to “pattern 1” for SBFD resource allocation and “pattern 2” for handling transitions between non-SBFD and SBFD symbols. See paragraphs [0254], [0257], [0288], [0289], [0310], [0336]-[0338], [0341], [0342], [0344], [0345], [0348], [0349], [0376], [0377], [0379], and [0381]. Therefore, it would have been obvious before the effective filing date of the claimed invention to a skilled person in wireless network design, such as You’s UE of a wireless communication system, would find it simple and obvious to assign SBFD resources to one pattern and non-SBFD resources to another in order to split resource types across different indicated TDD patterns does not create a new or unexpected technical result just simple by applying the scheduling options already provided in the source text and because You teaches multiple patterns and restricts SBFD resource rules to the first pattern, a person of ordinary skill in the art would find the limitation of allocating SBFD resources to only the first TDD pattern. Claim 13 is rejected under 35 U.S.C. 103 as being unpatentable over You in view of ZHOU et al. (US 2024/0405962 A1), hereinafter “Zhou”. Regarding claim 13, as applied to claim 1 discussed above, You fails to show or teach that wherein the SBFD resources in the first TDD pattern are allocated in accordance with one or more legacy SBFD symbols allocated in the first TDD pattern. Zhou also relates to a UE may transmit an indication of a limit on a number of switching points (or transition points) between one or more first symbols configured for sub-band full duplex (SBFD) communications and one or more second symbols configured for non-SBFD communications, within a period of time. The UE may receive a configuration for the SBFD communications, which is in accordance with the indication. See abstract. Zhou also teaches that techniques can be used to improve resource utilization and reduce latency (e.g., since the SBFD mode allows the UE to transmit UL signal in UL subband in DL only or flexible slots or receive DL signal in DL subband(s) in legacy UL only slots). Additionally, a limit on a number of switching points between the SBFD symbols and the non-SBFD symbols within the slot may reduce the frequent switching between the SBFD symbols and the non-SBFD symbols, which may further prevent or reduce the interruptions of the transmissions/receptions within the slot. See paragraph [0024]. Zhou also illustrates example slots that consist of both SBFD and non-SBFD symbols in FIGs. 11 and 12 and teaches in paragraphs [0108] and [0109] that FIG. 11 depicts one example slot 1100 for legacy TDD and SBFD communication. As depicted, the slot 1100 includes both SBFD and non-SBFD symbols (e.g., in accordance with symbol-level TDD UL/DL configuration). For example, in the slot 1100, DL symbols 1102 can be configured as SBFD symbols followed by guard symbols and then UL symbols (e.g., non-SBFD symbols) 1104 at the end. FIG. 12 depicts another example slot 1200 for legacy TDD and SBFD communication. As depicted, the slot 1200 also includes both SBFD and non-SBFD symbols (e.g., in accordance with symbol-level TDD UL/DL configuration). For example, in the slot 1200, initial one or more symbols may be DL symbols (e.g., non-SBFD symbols) 1202 followed with guard symbols and then remaining DL symbols 1204 can be configured (e.g., semi-static configured) as SBFD symbols. Zhou explicitly describes mixing SBFD and non-SBFD symbols within a slot based on a “symbol-level TDD UL/DL configuration.” Therefore, allocating SBFD resources “in accordance with one or more legacy SBFD symbols” as recited in the claim inherently apply to the teaching of configuring remaining or initial symbols (like DL or guard symbols) into SBFD modes using established TDD structures. Therefore, it would have been obvious before the effective filing date of the claimed invention to a person having ordinary skill in the art as taught by Zhou to align new SBFD resource allocations to You’s UE with existing legacy SBFD or TDD patterns in order to maintain compatibility and reduce transition overhead. Allowable Subject Matter Claims 9, 10, and 18 would be allowable if rewritten to overcome the objection(s) set forth in this Office action and to include all of the limitations of the base claim and any intervening claims. Conclusion The prior art made of record and not relied upon is considered pertinent to applicant's disclosure. ABOTABL et al. (US 2023/0155798 A) relates to a full-duplex communication in a time division duplexing (TDD) band, a network node (e.g., a user equipment (UE)) may be configured to communicate in one or more flexible bandwidth parts (BWPs) using BWP-specific TDD patterns regardless of a TDD pattern configured for the underlying band. However, in some cases, half-duplex communication may offer better performance than full-duplex communication (e.g., when full-duplex communication may cause self-interference or there is a need for high throughput half-duplex communication). ABDELGHAFFAR et al. (US 2024/0284460 A) relates to mechanisms for duplex-specific physical uplink control channel (PUCCH) configuration and transmission. A UE may receive a first configuration of PUCCH for sub-band full duplex (SBFD) symbols including downlink or flexible symbols with a configured uplink sub-band. In addition, the UE may receive a second configuration of PUCCH for non-SBFD symbols including uplink symbols or flexible symbols configured for uplink communication. ZHANG et al. (US 2025/0105991 A) relates to a network may configure a user equipment (UE) with a time duration pattern, and may further indicate (e.g., via control signaling) which time intervals (e.g., slots or symbols) of the time duration pattern are designated as full duplex time intervals. The network may indicate a full duplex time interval on a configured downlink symbol, a configured uplink symbol, or a configured flexible symbol. The network may further indicate frequency resources (e.g., an uplink subband, a downlink subband, etc.) via which the UE is to perform the full duplex communication during the indicated time intervals. The control signaling may include an indication of a full duplex mode for each of the time intervals. Multiple transmission receive points (TRPs) may communicate to determining which TRP will schedule uplink signaling and which TRP will schedule downlink signaling in the full duplex time interval. GRANT et al. (US 2025/0254018 A) relates to a UE may transmit an indication of a limit on a number of switching points (or transition points) between one or more first symbols configured for sub-band full duplex (SBFD) communications and one or more second symbols configured for non-SBFD communications, within a period of time. The UE may receive a configuration for the SBFD communications, which is in accordance with the indication. Any inquiry concerning this communication or earlier communications from the examiner should be directed to Young T. Tse whose telephone number is (571)272-3051. The examiner can normally be reached Mon-Fri 10:30am-7pm. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Chieh M Fan can be reached at 571-272-3042. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /Young T. Tse/Primary Examiner, Art Unit 2632
Read full office action

Prosecution Timeline

Nov 08, 2024
Application Filed
Sep 02, 2026
Non-Final Rejection mailed — §102, §103
Oct 22, 2026
Interview Requested

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12768934
TIMING ERROR GROUP REPORTING WITH ANGULAR VALIDITY INDICATION
2y 6m to grant Granted Oct 20, 2026
Patent 12771408
RECONFIGURABLE INTELLIGENT SURFACE-ASSISTED FLEXIBLE WIRELESS NETWORK
2y 3m to grant Granted Oct 20, 2026
Patent 12763805
Method and apparatus for crest factor reduction
3y 9m to grant Granted Oct 13, 2026
Patent 12756445
METHODS AND NODES TO PERFORM PRECODER CANDIDATE RESTRICTION FOR MULTI-ANTENNA UE
1y 11m to grant Granted Oct 06, 2026
Patent 12750258
EQUALIZER AND TRANSMITTER INCLUDING THE SAME
1y 10m to grant Granted Sep 29, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

1-2
Expected OA Rounds
89%
Grant Probability
98%
With Interview (+8.5%)
2y 5m (~5m remaining)
Median Time to Grant
Low
PTA Risk
Based on 1040 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month