Prosecution Insights
Last updated: November 20, 2026
Application No. 18/946,758

END-TO-END (E2E) NETWORK CAPACITY PLANNING TOOL IN A CELLULAR NETWORK

Non-Final OA §103
Filed
Nov 13, 2024
Examiner
BEYEN, ZEWDU A
Art Unit
2461
Tech Center
2400 — Computer Networks
Assignee
Dish Wireless LLC
OA Round
1 (Non-Final)
84%
Grant Probability
Favorable
1-2
OA Rounds
9m
Est. Remaining
98%
With Interview

Examiner Intelligence

Grants 84% — above average
84%
Career Allowance Rate
729 granted / 871 resolved
+25.7% vs TC avg
Moderate +15% lift
Without
With
+14.8%
Interview Lift
resolved cases with interview
Typical timeline
2y 9m
Avg Prosecution
33 currently pending
Career history
914
Total Applications
across all art units

Statute-Specific Performance

§101
5.0%
-35.0% vs TC avg
§103
61.3%
+21.3% vs TC avg
§102
17.0%
-23.0% vs TC avg
§112
10.8%
-29.2% vs TC avg
Black line = Tech Center average estimate • Based on career data from 871 resolved cases

Office Action

§103
DETAILED ACTION Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . Claim Rejections - 35 USC § 103 In the event the determination of the status of the application as subject to AIA 35 U.S.C. 102 and 103 (or as subject to pre-AIA 35 U.S.C. 102 and 103) is incorrect, any correction of the statutory basis (i.e., changing from AIA to pre-AIA ) for the rejection will not be considered a new ground of rejection if the prior art relied upon, and the rationale supporting the rejection, would be the same under either status. The following is a quotation of 35 U.S.C. 103 which forms the basis for all obviousness rejections set forth in this Office action: A patent for a claimed invention may not be obtained, notwithstanding that the claimed invention is not identically disclosed as set forth in section 102, if the differences between the claimed invention and the prior art are such that the claimed invention as a whole would have been obvious before the effective filing date of the claimed invention to a person having ordinary skill in the art to which the claimed invention pertains. Patentability shall not be negated by the manner in which the invention was made. The factual inquiries for establishing a background for determining obviousness under 35 U.S.C. 103 are summarized as follows: 1. Determining the scope and contents of the prior art. 2. Ascertaining the differences between the prior art and the claims at issue. 3. Resolving the level of ordinary skill in the pertinent art. 4. Considering objective evidence present in the application indicating obviousness or nonobviousness. Claim(s) 1-20 is/are rejected under 35 U.S.C. 103 as being unpatentable over Filomeno to (US20240259827) in view of Wang to (WO 2020083051 A1) further in view of Ravichandran to (US 20200186411 A1) Regarding claims 1,9,17 Filomeno teaches a method of end-to-end (E2E) network resource planning in a cellular network, the method comprising: adjusting an input to a network resource planning tool, ([0093] discloses modify the candidate network deployment using an output of the bottleneck structure model to generate a next candidate network deployment in block 512. For example, the processor may use an output of the bottleneck structure model to modify the candidate network deployment, to generate a modified or tweaked candidate network deployment (a next network deployment). .. the processor may determine the effect of small changes to a candidate network deployment without the need to generate and simulate an entirely new network deployment. In some embodiments, the processor may compare the effects of such small changes, and determine whether to keep or discard such changes based on whether the small changes result in an improvement in one or more network performance criteria) wherein the input comprises a parameter associated with data demand,([0090] repeat the operations of generating a (next) candidate network deployment and simulating a performance of the (next) candidate network deployment … the processor may determine the effect of small changes to a candidate network deployment without the need to generate and simulate an entirely new network deployment) wherein the network resource planning tool comprises a plurality of entities representing a plurality of network elements in the cellular network([0085] discloses obtain information regarding a plurality of network element locations in a geographic area, communication characteristics of network element types suitable for deployment in the plurality of network element locations, a network demand from UEs in the geographic area, and a deployment cost of the network elements), monitoring a plurality of capacity metrics,([0091] discloses determining whether a stop condition is satisfied by the candidate network deployment includes determining whether the simulated performance of the candidate network deployment satisfies the network demand from the UEs in the geographic area. .. the network demand from the UEs may be expressed in terms of data throughput, data rates provided to UEs, or another suitable metric, value, or expression of network demand from the UEs) Filomeno does not explicitly teach wherein each capacity metric of the plurality of capacity metrics is associated with a corresponding network element of the plurality of network elements; determining whether a capacity metric of the plurality of capacity metric satisfies a corresponding threshold criterion of the capacity metric, wherein each capacity metric of the plurality of capacity metric corresponds to a respective threshold criterion of a plurality of threshold criteria; and responsive to determining that the capacity metric satisfies the corresponding threshold criterion, outputting a notification indicating a breakage associated with the corresponding network element However, Wang teaches wherein each capacity metric of the plurality of capacity metrics is associated with a corresponding network element of the plurality of network elements; (p12, last paragraph "obtaining the CPU utilization rate of the virtualized network element in the network element pool; in order to obtain the CPU utilization rate of a network element, the network element must be identified) determining whether a capacity metric of the plurality of capacity metric satisfies a corresponding threshold criterion of the capacity metric, (p12, last paragraph " obtaining the CPU utilization rate of the virtualized network element in the network element pool; "; note that CPU utilization rate is a capacity metric) wherein each capacity metric of the plurality of capacity metric corresponds to a respective threshold criterion of a plurality of threshold criteria (p12, last paragraph " if the CPU utilization rate of the virtualized network element exceeds a preset threshold, the Set up an elastic strategy for expansion ") However, Ravichandran teaches responsive to determining that the capacity metric satisfies the corresponding threshold criterion, outputting a notification indicating a breakage associated with the corresponding network element ("[0088] The FPPM 209 may perform at least following functions: [0089] a) predict/detect fault or performance issue in one or more service(s)/slice(s) using pre-provisioned inputs (FPP-RULES) that may be adapted by the EAAM 205 (ADAPT-FPP-RULES) or [0173] " prediction of fault or performance issues from a CF, and SO forth.", or "[0174] end-to-end latency within the network shows an increasing trend, and is predicted to cross the threshold for maximum latency in next 2 observation intervals ") Therefore, it would have been obvious to one ordinarily skilled in the art before the effective filing date of the claimed invention to enable the system of Filomeno include wherein each capacity metric of the plurality of capacity metrics is associated with a corresponding network element of the plurality of network elements; determining whether a capacity metric of the plurality of capacity metric satisfies a corresponding threshold criterion of the capacity metric, wherein each capacity metric of the plurality of capacity metric corresponds to a respective threshold criterion of a plurality of threshold criteria; and responsive to determining that the capacity metric satisfies the corresponding threshold criterion, outputting a notification indicating a breakage associated with the corresponding network element, as suggested by Wang and Ravichandran. This modification would benefit the system reduce network congestion and predicting network fault/performance issues ([0173] of RAVICHANDRAN). Regarding claims 2,10,18 Filomeno and Wang and Ravichandran teaches wherein the network resource planning tool comprises a plurality of modules, wherein a first module of the plurality of modules comprises a first set of entities representing a first set of network elements in one or more base stations, wherein a second module of the plurality of modules comprises a second set of entities representing a second set of network elements in one or more transports(Wang, p2, last paragraph " Taking the 2/3 / 4G wireless access network element selecting the core network element as an example, in the mobile switching center (Mobile Switching Centre, MSC) / service General Packet Radio Service (General Packet Radio Service (GPRS) support node (Serving GPRS In the case of Support Node, SGSN) / Mobile Management Entity (Mobile Management Entity, MME) group pool, the Radio Network Controller (RNC) selects the MSC / SGSN / MME serving it in the pool. ..."), wherein a third module of the plurality of modules comprises a third set of entities representing a third set of network elements in one or more core networks, and wherein a fourth module of the plurality of modules comprises a fourth set of entities representing a fourth set of network elements in one or more cloud-computing platforms (Wang, p2, last paragraph " Taking the 2/3 / 4G wireless access network element selecting the core network element as an example, in the mobile switching center (Mobile Switching Centre, MSC) / service General Packet Radio Service (General Packet Radio Service (GPRS) support node (Serving GPRS In the case of Support Node, SGSN) / Mobile Management Entity (Mobile Management Entity, MME) group pool, the Radio Network Controller (RNC) selects the MSC / SGSN / MME serving it in the pool. ..."). Regarding claims 3,11 Filomeno teaches wherein the first set of network elements comprises at least one of: a radio unit (RU), a distributed unit (DU), a control plane centralized unit (CU-CP), a user plane centralized unit (CU-UP), a sector, or a cell site([0030] one or more of a Centralized Unit (CU), a Distributed Unit (DU), a Radio Unit (RU), a near-real time (RT) RAN intelligent controller (RIC), or a non-real time RIC. Each network device may provide communication coverage for a particular geographic area. In 3GPP, the term “cell” can refer to a coverage area of a network device, a network device subsystem serving this coverage area, or a combination thereof, depending on the context in which the term is used. The core network 140 may be any type core network, such as an LTE core network (e.g., an evolved packet core (EPC) network), 5G core network, etc) , wherein the second set of network elements comprises at least one of: an interface, or a communication link, ([0078] network elements have a limited amount of time to allocate to each of communication links (connections) with UEs supported by each network element ) wherein the third set of network elements comprises at least one network function,([0051] Each control function may be implemented with an interface configured to communicate signals with other control functions hosted by the CU 162) and wherein the fourth set of network elements comprises at least one cloud-native network function([0054] the SMO Framework 166 may be configured to interact with a cloud computing platform (such as an open cloud (O-Cloud) 176) to perform network element life cycle management (such as to instantiate virtualized network elements) via a cloud computing platform interface (such as an O2 interface)) . Regarding claims 4,12,19 Filomeno and Wang and Ravichandran teach wherein the capacity metric comprises at least one of: a counter, or a key performance indicator (KPI) (Ravichandran "[0003] a rule to allocate an additional virtual machine (VM) to a network function may not work if sufficient resources are not available in the specific location, thereby leading to increased latency affecting key performance indicators (KPIs) of services, etc. "). Regarding claims 5,13 Filomeno and Wang and Ravichandran teach wherein the threshold criterion of the capacity metric is determined using historical data or one or more capacity limits of the network element (Wang, p12, last paragraph " if the CPU utilization rate of the virtualized network element exceeds a preset threshold, the Set up an elastic strategy for expansion ") . Regarding claims 6,14,20 Filomeno and Wang and Ravichandran teach wherein the parameter associated with data demand comprises at least one of: a number of subscribers, or an amount of data traffic (Ravichandran [0173] " prediction of fault or performance issues from a CF, and SO forth.", or "[0174] end-to-end latency within the network shows an increasing trend, and is predicted to cross the threshold for maximum latency in next 2 observation intervals "). Regarding claims 7,15 Filomeno and Wang and Ravichandran teach further comprising: recording a value of the input corresponding to the breakage (Ravichandran [0173] " prediction of fault or performance issues from a CF, and SO forth.", or "[0174] end-to-end latency within the network shows an increasing trend, and is predicted to cross the threshold for maximum latency in next 2 observation intervals "). Regarding claims 8,16 Filomeno and Wang and Ravichandran teach make a recommendation regarding the breakage, wherein the recommendation comprises adjusting at least one of: a capacity of memory, a capacity of storage, a number of central processing unit (CPU), or a bandwidth of network interconnection (Wang, p5, 2ⁿᵈ paragraph , from the bottom (" network device is the first network element and includes: a processor; a memory and a transceiver connected to the processor; or p12, last para " obtaining the CPU utilization rate of the virtualized network element in the network element pool; not that "CPU utilization rate" is associated with number of CPUs). Conclusion Any inquiry concerning this communication or earlier communications from the examiner should be directed to ZEWDU A BEYEN whose telephone number is (571)270-7157. The examiner can normally be reached M-F 9:00-6:00. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Huy D Vu can be reached at 571-272-3155. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /ZEWDU A BEYEN/Primary Examiner, Art Unit 2461
Read full office action

Prosecution Timeline

Nov 13, 2024
Application Filed
Oct 20, 2026
Non-Final Rejection mailed — §103 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12804407
SYSTEMS AND METHODS FOR MULTI-OBJECTIVE RADIO NETWORK OPTIMIZATION
2y 10m to grant Granted Nov 17, 2026
Patent 12786988
TECHNIQUES TO FACILITATE RESOURCES SELECTED OVER TIME
3y 7m to grant Granted Nov 03, 2026
Patent 12786994
RANDOM ACCESS ON ENHANCED SECONDARY UPLINK CELL
3y 1m to grant Granted Nov 03, 2026
Patent 12771512
METHOD FOR DETERMINING TRANSMISSION PARAMETER, METHOD FOR SENDING HARQ-ACK, APPARATUS, DEVICE, AND MEDIUM
3y 1m to grant Granted Oct 20, 2026
Patent 12772201
MODEL MONITORING FOR POSITIONING
2y 2m to grant Granted Oct 20, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

1-2
Expected OA Rounds
84%
Grant Probability
98%
With Interview (+14.8%)
2y 9m (~9m remaining)
Median Time to Grant
Low
PTA Risk
Based on 871 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month