Application No. 18/963,138

MEASUREMENT FOR CALIBRATION

Non-Final OA §102
Filed
Nov 27, 2024
Priority
Dec 08, 2023 — provisional 63/608,082
Examiner
HAN, CLEMENCE S
Art Unit
Tech Center
Assignee
Samsung Electronics Co., Ltd.
OA Round
1 (Non-Final)
91%
Grant Probability
Favorable
1-2
OA Rounds
6m
Est. Remaining
96%
With Interview

Examiner Intelligence

Grants 91% — above average
91%
Career Allowance Rate
1032 granted / 1136 resolved
+30.8% vs TC avg
Moderate +5% lift
Without
With
+5.2%
Interview Lift
resolved cases with interview
Typical timeline
2y 4m
Avg Prosecution
31 currently pending
Career history
1158
Total Applications
across all art units

Statute-Specific Performance

§101
6.0%
-34.0% vs TC avg
§103
34.6%
-5.4% vs TC avg
§102
28.0%
-12.0% vs TC avg
§112
20.2%
-19.8% vs TC avg
Black line = Tech Center average estimate • Based on career data from 1136 resolved cases

Office Action

§102
DETAILED ACTION Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . Drawings The drawings are objected to because the letters in Figures 13-16 are not clear and hard to read. Corrected drawing sheets in compliance with 37 CFR 1.121(d) are required in reply to the Office action to avoid abandonment of the application. Any amended replacement drawing sheet should include all of the figures appearing on the immediate prior version of the sheet, even if only one figure is being amended. The figure or figure number of an amended drawing should not be labeled as “amended.” If a drawing figure is to be canceled, the appropriate figure must be removed from the replacement sheet, and where necessary, the remaining figures must be renumbered and appropriate changes made to the brief description of the several views of the drawings for consistency. Additional replacement sheets may be necessary to show the renumbering of the remaining figures. Each drawing sheet submitted after the filing date of an application must be labeled in the top margin as either “Replacement Sheet” or “New Sheet” pursuant to 37 CFR 1.121(d). If the changes are not accepted by the examiner, the applicant will be notified and informed of any required corrective action in the next Office action. The objection to the drawings will not be held in abeyance. Claim Rejections - 35 USC § 102 In the event the determination of the status of the application as subject to AIA 35 U.S.C. 102 and 103 (or as subject to pre-AIA 35 U.S.C. 102 and 103) is incorrect, any correction of the statutory basis (i.e., changing from AIA to pre-AIA ) for the rejection will not be considered a new ground of rejection if the prior art relied upon, and the rationale supporting the rejection, would be the same under either status. The following is a quotation of the appropriate paragraphs of 35 U.S.C. 102 that form the basis for the rejections under this section made in this Office action: A person shall be entitled to a patent unless – (a)(2) the claimed invention was described in a patent issued under section 151, or in an application for patent published or deemed published under section 122(b), in which the patent or application, as the case may be, names another inventor and was effectively filed before the effective filing date of the claimed invention. Claims 1-5,7-12 and 14-19 are rejected under 35 U.S.C. 102(a)(2) as being anticipated by Kim et al. (US Pub. 2023/0379739). Regarding claims 1, 8 and 15, Kim teaches a user equipment (UE) comprising: a transceiver configured to receive information (see “Receive CSI-related configuration information” in step S1501 in Figure 15) about (i) K non-zero-power channel state information reference signals (NZP CSI-RSs), K>1, (“a first CSI resource set (i.e., NZP CSI-RS resource #1) and a second CSI resource set (i.e., NZP CSI-RS resource #2)” in [0454]) and (ii) a calibration report (“CSI report configuration-related information” in [0505]); and a processor operably coupled to the transceiver, the processor configured to: measure, based on the information, the K NZP CSI-RSs, (see step S1502 in Figure 15) and determine, based on the measurement, a calibration offset for each of the K NZP CSI-RSs, (see “Doppler shift-related value” in step S1503 in Figure 15) wherein the transceiver is further configured to transmit the calibration report including at least one indicator indicating the calibration offset for each of the K NZP CSI-RSs, (see step S1504 in Figure 15) wherein each of the K NZP CSI-RSs is associated with a CSI-RS port (“when a target antenna port is specific NZP CSI-RS, corresponding NZP CSI-RS antenna ports may be indicated/configured to be QCL with specific TRS from the viewpoint of QCL-Type A and specific SSB from the viewpoint of QCL-Type D” in [0160]), and wherein the calibration offset corresponds to at least one of a delay offset (DO), a frequency offset (FO), and a phase offset (PO) (“a frequency/Doppler shift” in [0151]). Regarding claims 2, 9 and 16, Kim teaches the K NZP CSI-RSs have a same bandwidth (BW) (“Each CSI resource setting is positioned in a DL BWP (bandwidth part) identified by a higher layer parameter bwp-id. In addition, all CSI resource settings linked to CSI reporting setting have the same DL BWP” in [0230]). Regarding claims 3, 10 and 17, Kim teaches the K NZP CSI-RSs are associated with at least one NZP CSI-RS resource set (NZP CSI-RSs), K>1, (“a first CSI resource set (i.e., NZP CSI-RS resource #1) and a second CSI resource set (i.e., NZP CSI-RS resource #2)” in [0454]). Regarding claims 4, 11 and 18, Kim teaches when the calibration offset corresponds to DO or FO, each of the K NZP CSI-RSs is configured as a tracking RS (TRS) (“report an offset value/information between DL Doppler shift values when receiving the specific TRS/SSB for a specific TRS/SSB combination” in [0446]), the at least one NZP CSI-RS resource set corresponds to K NZP CSI-RS resource sets, and each of the K NZP CSI-RS resource sets includes one of the K NZP CSI-RSs (“a first CSI resource set (i.e., NZP CSI-RS resource #1) and a second CSI resource set (i.e., NZP CSI-RS resource #2)” in [0454]). Regarding claims 5, 12 and 19, Kim teaches each of the K NZP CSI-RSs is a periodic TRS (“Periodic TRS” in [0298]). Regarding claims 7 and 14, Kim teaches the CSI-RS port associated with each of the K NZP CSI-RSs has a same port index (“antenna ports for all NZP-CSI-RS resources in the CSI-RS resource set are the same” in [0301]). Allowable Subject Matter Claims 6, 13 and 20 are objected to as being dependent upon a rejected base claim, but would be allowable if rewritten in independent form including all of the limitations of the base claim and any intervening claims. Conclusion Any inquiry concerning this communication or earlier communications from the examiner should be directed to CLEMENCE S HAN whose telephone number is (571)272-3158. The examiner can normally be reached Monday-Friday 8AM-5PM EST. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Edan Orgad can be reached at (571)272-7884. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /CLEMENCE S HAN/Primary Examiner, Art Unit 2414
Read full office action

Prosecution Timeline

Nov 27, 2024
Application Filed
Sep 10, 2026
Non-Final Rejection mailed — §102 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12750188
SHARED DEMODULATION REFERENCE SIGNAL FOR PHYSICAL DOWNLINK CONTROL CHANNEL AND PHYSICAL DOWNLINK SHARED CHANNEL TRANSMISSIONS
3y 2m to grant Granted Sep 29, 2026
Patent 12750713
RESOURCE MEASUREMENT RESTRICTION FOR BEAM MANAGEMENT
2y 9m to grant Granted Sep 29, 2026
Patent 12739846
CONTROL CHANNEL HANDLING FOR ENHANCED CROSS-CARRIER SCHEDULING
3y 7m to grant Granted Sep 15, 2026
Patent 12733032
SYSTEM AND METHOD FOR PERFORMING TRANSMISSION CANCELLATION INDICATION MONITORING
2y 5m to grant Granted Sep 08, 2026
Patent 12726927
TERMINAL, RADIO COMMUNICATION SYSTEM, AND RADIO COMMUNICATION METHOD
2y 7m to grant Granted Sep 01, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

1-2
Expected OA Rounds
91%
Grant Probability
96%
With Interview (+5.2%)
2y 4m (~6m remaining)
Median Time to Grant
Low
PTA Risk
Based on 1136 resolved cases by this examiner. Grant probability derived from career allowance rate.