Prosecution Insights
Last updated: November 21, 2026
Application No. 18/970,056

RAIL CONNECTOR ASSEMBLY FOR DYNAMIC ENERGY TRANSFER SYSTEM

Non-Final OA §102§103§112
Filed
Dec 05, 2024
Examiner
LIN, CHENG XI
Art Unit
3615
Tech Center
3600 — Transportation & Electronic Commerce
Assignee
Caterpillar Inc.
OA Round
1 (Non-Final)
85%
Grant Probability
Favorable
1-2
OA Rounds
1y 0m
Est. Remaining
98%
With Interview

Examiner Intelligence

Grants 85% — above average
85%
Career Allowance Rate
286 granted / 337 resolved
+32.9% vs TC avg
Moderate +13% lift
Without
With
+13.4%
Interview Lift
resolved cases with interview
Typical timeline
3y 0m
Avg Prosecution
39 currently pending
Career history
377
Total Applications
across all art units

Statute-Specific Performance

§101
0.1%
-39.9% vs TC avg
§103
53.3%
+13.3% vs TC avg
§102
23.1%
-16.9% vs TC avg
§112
19.7%
-20.3% vs TC avg
Black line = Tech Center average estimate • Based on career data from 337 resolved cases

Office Action

§102 §103 §112
Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . DETAILED ACTION This is the first non-final office action on the merits. Claims 1-20 are currently pending. Information Disclosure Statement The information disclosure statements (IDS) submitted on 12/05/2024 and 03/18/2026 have been received and considered by the examiner. Drawings The drawings are accepted. Claim Rejections - 35 USC § 112 The following is a quotation of 35 U.S.C. 112(b): (b) CONCLUSION.—The specification shall conclude with one or more claims particularly pointing out and distinctly claiming the subject matter which the inventor or a joint inventor regards as the invention. The following is a quotation of 35 U.S.C. 112 (pre-AIA ), second paragraph: The specification shall conclude with one or more claims particularly pointing out and distinctly claiming the subject matter which the applicant regards as his invention. Claims 1-8 are rejected under 35 U.S.C. 112(b) or 35 U.S.C. 112 (pre-AIA ), second paragraph, as being indefinite for failing to particularly point out and distinctly claim the subject matter which the inventor or a joint inventor (or for applications subject to pre-AIA 35 U.S.C. 112, the applicant), regards as the invention. Claim 1 recites the limitation "an end of the boom adapter " in lines 8-9. There is insufficient antecedent basis for this limitation in the claim. Claim 1 only recites “a trailing arm adapter”. For examination purposes, "an end of the boom adapter” has been construed as “an end of the trailing arm adapter”. Claims 2-8 are rejected for their dependency on claim 1. Claim Rejections - 35 USC § 102 In the event the determination of the status of the application as subject to AIA 35 U.S.C. 102 and 103 (or as subject to pre-AIA 35 U.S.C. 102 and 103) is incorrect, any correction of the statutory basis (i.e., changing from AIA to pre-AIA ) for the rejection will not be considered a new ground of rejection if the prior art relied upon, and the rationale supporting the rejection, would be the same under either status. The following is a quotation of the appropriate paragraphs of 35 U.S.C. 102 that form the basis for the rejections under this section made in this Office action: A person shall be entitled to a patent unless – (a)(1) the claimed invention was patented, described in a printed publication, or in public use, on sale, or otherwise available to the public before the effective filing date of the claimed invention. (a)(2) the claimed invention was described in a patent issued under section 151, or in an application for patent published or deemed published under section 122(b), in which the patent or application, as the case may be, names another inventor and was effectively filed before the effective filing date of the claimed invention. Claim(s) 1-2, 9-10, 14, and 17 is/are rejected under 35 U.S.C. 102(a)(2) as being anticipated by Winckler et al. (US 12522078 B2). Regarding claim 1, Winckler teaches (Fig. 1-8): A rail connector assembly for connecting a mobile machine (10) to an electrically-conducting rail system (Fig. 1), the rail connector assembly comprising: a boom assembly (40), including a main boom (arm 42) and a trailing arm adapter (lift joint 62; Fig. 3), wherein a first end (inboard end 44) of the main boom (42) is configured to be coupled to the mobile machine (10)(Fig. 1), wherein a second end (outboard end 46) of the main boom (42) opposite to the first end is coupled to the trailing arm adapter (Figs. 1-3), and wherein the trailing arm adapter (62) includes an angled portion that extends at a non-zero angle from a longitudinal axis of the main boom (42)(Fig. 2); a trailing arm assembly (linkage 50), wherein the trailing arm assembly is pivotably coupled to an end of the boom adapter (62)(Fig. 3), wherein the trailing arm assembly (50) includes a first arm (upper link 54) and a second arm (lower link 52)(Fig. 3), wherein the first arm (54) is coupled to the trailing arm adapter (62) and includes at least one straight portion and at least one angled portion (annotated Fig. 3 below) , and wherein the second arm (52)is rotatable relative to the first arm (54)(rotatable at fold joint 56; Fig. 3); and a contactor assembly (72), wherein the contactor assembly is coupled to an end of the trailing arm assembly (50)(Fig. 3). Regarding claim 2, Winckler further teaches (Fig. 1-8): the angled portion of the trailing arm adapter extends at a non-zero angle from the longitudinal axis of the main boom (annotated Fig. 3 below and Fig. 6). Regarding claim 9, Winckler teaches (Fig. 1-8): An electrically-powered mobile machine (10), the electrically-powered mobile machine comprising: a machine frame (12)(Fig. 1); a motor (24) configured to operate a function of the mobile machine (Fig. 1); and a connector assembly (Fig. 1) coupled to a portion of the machine frame (12) via a boom adapter (pivot 44), wherein the connector assembly is configured to connect to an electrically-conductive rail (30) for supplying electrical energy to the motor (Fig. 1), wherein the rail connector assembly includes: a boom assembly (40), including a main boom (arm 42) and a trailing arm adapter (lift joint 62; Fig. 3), wherein a first end (inboard end 44) of the main boom (42) is configured to be coupled to the mobile machine (10) via the boom adapter (Fig. 1), wherein a second end (outboard end 46) of the main boom (42) opposite to the first end is coupled to the trailing arm adapter (Figs. 1-3), and wherein the trailing arm adapter (62) includes an angled portion that extends at a non-zero angle from a longitudinal axis of the main boom (42)(Fig. 2); a trailing arm assembly (linkage 50), wherein the trailing arm assembly is pivotably coupled to an end of the trailing arm adapter (62)(Fig. 3), wherein the trailing arm assembly (50) includes a first arm (upper link 54) and a second arm (lower link 52)(Fig. 3), wherein the first arm (54) is coupled to the trailing arm adapter (62) and includes at least one straight portion and at least one angled portion (annotated Fig. 3 below) , and wherein the second arm (52)is rotatable relative to the first arm (54)(rotatable at fold joint 56; Fig. 3); and a contactor assembly (72), wherein the contactor assembly is coupled to an end of the trailing arm assembly (50)(Fig. 3). Regarding claim 10, Winckler further teaches (Fig. 1-8): the angled portion of the trailing arm adapter extends at a non-zero angle from the longitudinal axis of the main boom (annotated Fig. 3 below and Fig. 6). Regarding claim 14, Winckler further teaches (Fig. 1-8): the electrically-powered mobile machine (1) includes an operator cabin (Fig. 1), and wherein the main boom (42) is coupled to a side of the machine frame at a position below or behind the operator cabin (Fig. 1). Regarding claim 17, Winckler further teaches (Fig. 1-8): a storage device (battery 26) for storing electrical energy (Fig. 1), wherein the connector assembly (40) includes one or more cables (electrical cabling 36) electrically connecting the contactor assembly to the storage device (Fig. 1; col. 4, lines 18-24). PNG media_image1.png 649 547 media_image1.png Greyscale Claim Rejections - 35 USC § 103 The following is a quotation of 35 U.S.C. 103 which forms the basis for all obviousness rejections set forth in this Office action: A patent for a claimed invention may not be obtained, notwithstanding that the claimed invention is not identically disclosed as set forth in section 102, if the differences between the claimed invention and the prior art are such that the claimed invention as a whole would have been obvious before the effective filing date of the claimed invention to a person having ordinary skill in the art to which the claimed invention pertains. Patentability shall not be negated by the manner in which the invention was made. Claim(s) 15 is/are rejected under 35 U.S.C. 103 as being unpatentable over Winckler et al. (US 12522078 B2), in view of Ohman et al. (US 20190210467 A1). Regarding claim 15, Winckler does not explicitly teach that the first arm is formed of fabricated steel, and wherein the second arm is formed of aluminum. However, Ohman teaches an alternate rail connector assembly for energy transfer, wherein (Fig. 1): a current collector arm (150) may be of a lightweight and strong material such as stainless steel or aluminum (para. 0055). It would have been obvious to one of ordinary skill in the art before the effective filing date of the claimed invention to make the first arm with steel and the second arm with aluminum, since it has been held to be within the general skill of a worker in the art to select known material on the basis of its suitability for the intended use as a matter of obvious design choice. In re Leshin, 277 F.2d 197, 125 USPQ 416 (CCPA 1960). See MPEP § 2144.07. Forming the second current collector arm with aluminum would provide higher electrical conductivity and less weight, and forming the first arm with steel would provide improved mechanical durability and toughness. Allowable Subject Matter Claims 3-8, 11-13, and 16 are objected to as being dependent upon a rejected base claim, but would be allowable if rewritten in independent form including all of the limitations of the base claims and if all rejections in view of 35 USC § 112 second paragraph are overcome. Claims 18-20 are allowed. The following is a statement of reasons for the indication of allowable subject matter: Regarding claim 3 and its depending claim(s) 4-6, the prior art fails to teach the first arm includes a first straight portion, a first angled portion, a second straight portion, and a second angled portion. While Winckler further teaches (Fig. 1-8): the trailing arm assembly (50) includes a first arm (upper link 54) and a second arm (lower link 52)(Fig. 3), wherein the first arm (54) is coupled to the trailing arm adapter (62) and includes at least one straight portion and at least one angled portion (annotated Fig. 3 below), the examiner finds no obvious reason to modify Winckler such that the first arm has a second straight portion and a second angled portion in addition to the first straight and angled portions. Such a modification would require improper hindsight reasoning. Regarding claim 7 and its depending claim(s) 8, the prior art fails to teach the second arm includes a taper from a proximal portion to a distal portion. While Winckler further teaches (Fig. 1-8): the trailing arm assembly (50) includes a first arm (upper link 54) and a second arm (lower link 52)(Fig. 3), wherein the second arm (52)is rotatable relative to the first arm (54)(rotatable at fold joint 56; Fig. 3), the examiner finds no obvious reason to modify Winckler such that the second arm has a taper from a proximal portion to a distal portion. Such a modification would require improper hindsight reasoning. Claims 11 and its depending claims 12-13 recite “the first arm includes a first straight portion, a first angled portion, a second straight portion, and a second angled portion, wherein the first straight portion is pivotably coupled to the trailing arm adapter, and wherein the second arm is rotatably coupled to the second angled portion via a trailing arm actuator”, and is allowable for the same reasons as claims 3-6 above. Claim 16 recites “the second arm includes a taper from a proximal portion to a distal portion”, and is allowable for the same reasons as claims 7-8 above. Claim 18 and its depending claims 19-20 recite “a first arm and a second arm, wherein the first arm is coupled to the trailing arm adapter, wherein the first arm includes a first straight portion, a first angled portion, a second straight portion, and a second angled portion, and wherein the second arm is rotatable relative to the first arm”, and are allowable for the same reasons as claims 3-6 above. PNG media_image2.png 649 547 media_image2.png Greyscale Conclusion The prior art made of record and not relied upon is considered pertinent to applicant's disclosure of a rail connector assembly with collector arms for dynamic energy transfer: US-20170166071-A1, US-20240157852-A1, US-20250109574-A1, US-20250376048-A1, US-12614896-B2, DE-102015005843-A1. Any inquiry concerning this communication or earlier communications from the examiner should be directed to CHENG XI LIN whose telephone number is (571)272-6102. The examiner can normally be reached Mon. through Fri. 9:00am to 6:00pm EST. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Samuel (Joe) Morano can be reached at 5712726684. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /CHENG LIN/Examiner, Art Unit 3615
Read full office action

Prosecution Timeline

Dec 05, 2024
Application Filed
Sep 24, 2026
Non-Final Rejection mailed — §102, §103, §112
Nov 05, 2026
Examiner Interview Summary
Nov 05, 2026
Applicant Interview (Telephonic)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12799684
Assembly And Method For Automatic Aligning Of Rails
3y 4m to grant Granted Nov 17, 2026
Patent 12798631
FLOOR TRAY FOR BOARDING AIDS
2y 10m to grant Granted Nov 17, 2026
Patent 12798633
LOCKED-AXLE SPRING COMPRESSION SYSTEM AND METHOD
3y 2m to grant Granted Nov 17, 2026
Patent 12799682
UNDER SLEEPER PAD
3y 2m to grant Granted Nov 17, 2026
Patent 12798636
Method and Rail Vehicle for Detection of a Flaw or Flaws in a Railway Track
3y 0m to grant Granted Nov 17, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

1-2
Expected OA Rounds
85%
Grant Probability
98%
With Interview (+13.4%)
3y 0m (~1y 0m remaining)
Median Time to Grant
Low
PTA Risk
Based on 337 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month