Prosecution Insights
Last updated: November 04, 2026
Application No. 18/974,466

WIDEBAND STREAMING L BAND (WISL) METHODS AND SYSTEMS

Non-Final OA §101§DP
Filed
Dec 09, 2024
Priority
Jan 17, 2018 — continuation of 10/476,582 +3 more
Examiner
TOWFIGHI, AFSHAWN M
Art Unit
2469
Tech Center
2400 — Computer Networks
Assignee
Satcom Direct LLC
OA Round
1 (Non-Final)
88%
Grant Probability
Favorable
1-2
OA Rounds
7m
Est. Remaining
97%
With Interview

Examiner Intelligence

Grants 88% — above average
88%
Career Allowance Rate
869 granted / 990 resolved
+29.8% vs TC avg
Moderate +9% lift
Without
With
+9.0%
Interview Lift
resolved cases with interview
Typical timeline
2y 6m
Avg Prosecution
21 currently pending
Career history
1012
Total Applications
across all art units

Statute-Specific Performance

§101
6.5%
-33.5% vs TC avg
§103
42.0%
+2.0% vs TC avg
§102
32.7%
-7.3% vs TC avg
§112
10.3%
-29.7% vs TC avg
Black line = Tech Center average estimate • Based on career data from 990 resolved cases

Office Action

§101 §DP
DETAILED ACTION Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . Information Disclosure Statement The information disclosure statement (IDS) submitted on 11/11/25 is being considered by the examiner. Double Patenting A rejection based on double patenting of the “same invention” type finds its support in the language of 35 U.S.C. 101 which states that “whoever invents or discovers any new and useful process... may obtain a patent therefor...” (Emphasis added). Thus, the term “same invention,” in this context, means an invention drawn to identical subject matter. See Miller v. Eagle Mfg. Co., 151 U.S. 186 (1894); In re Vogel, 422 F.2d 438, 164 USPQ 619 (CCPA 1970); In re Ockert, 245 F.2d 467, 114 USPQ 330 (CCPA 1957). A statutory type (35 U.S.C. 101) double patenting rejection can be overcome by canceling or amending the claims that are directed to the same invention so they are no longer coextensive in scope. The filing of a terminal disclaimer cannot overcome a double patenting rejection based upon 35 U.S.C. 101. Claims 1-20 are rejected under 35 U.S.C. 101 as claiming the same invention as that of claims 1-20 of prior U.S. Patent No. 11,038,584. This is a statutory double patenting rejection. The nonstatutory double patenting rejection is based on a judicially created doctrine grounded in public policy (a policy reflected in the statute) so as to prevent the unjustified or improper timewise extension of the “right to exclude” granted by a patent and to prevent possible harassment by multiple assignees. A nonstatutory double patenting rejection is appropriate where the conflicting claims are not identical, but at least one examined application claim is not patentably distinct from the reference claim(s) because the examined application claim is either anticipated by, or would have been obvious over, the reference claim(s). See, e.g., In re Berg, 140 F.3d 1428, 46 USPQ2d 1226 (Fed. Cir. 1998); In re Goodman, 11 F.3d 1046, 29 USPQ2d 2010 (Fed. Cir. 1993); In re Longi, 759 F.2d 887, 225 USPQ 645 (Fed. Cir. 1985); In re Van Ornum, 686 F.2d 937, 214 USPQ 761 (CCPA 1982); In re Vogel, 422 F.2d 438, 164 USPQ 619 (CCPA 1970); In re Thorington, 418 F.2d 528, 163 USPQ 644 (CCPA 1969). A timely filed terminal disclaimer in compliance with 37 CFR 1.321(c) or 1.321(d) may be used to overcome an actual or provisional rejection based on nonstatutory double patenting provided the reference application or patent either is shown to be commonly owned with the examined application, or claims an invention made as a result of activities undertaken within the scope of a joint research agreement. See MPEP § 717.02 for applications subject to examination under the first inventor to file provisions of the AIA as explained in MPEP § 2159. See MPEP § 2146 et seq. for applications not subject to examination under the first inventor to file provisions of the AIA . A terminal disclaimer must be signed in compliance with 37 CFR 1.321(b). The filing of a terminal disclaimer by itself is not a complete reply to a nonstatutory double patenting (NSDP) rejection. A complete reply requires that the terminal disclaimer be accompanied by a reply requesting reconsideration of the prior Office action. Even where the NSDP rejection is provisional the reply must be complete. See MPEP § 804, subsection I.B.1. For a reply to a non-final Office action, see 37 CFR 1.111(a). For a reply to final Office action, see 37 CFR 1.113(c). A request for reconsideration while not provided for in 37 CFR 1.113(c) may be filed after final for consideration. See MPEP §§ 706.07(e) and 714.13. The USPTO Internet website contains terminal disclaimer forms which may be used. Please visit www.uspto.gov/patent/patents-forms. The actual filing date of the application in which the form is filed determines what form (e.g., PTO/SB/25, PTO/SB/26, PTO/AIA /25, or PTO/AIA /26) should be used. A web-based eTerminal Disclaimer may be filled out completely online using web-screens. An eTerminal Disclaimer that meets all requirements is auto-processed and approved immediately upon submission. For more information about eTerminal Disclaimers, refer to www.uspto.gov/patents/apply/applying-online/eterminal-disclaimer. Claims 1 and 11 are rejected on the ground of nonstatutory double patenting as being unpatentable over claims 1 and 15 of U.S. Patent No. 10,476,582. Although the claims at issue are not identical, they are not patentably distinct from each other because of the mapping below: Instant application: Patent ‘582 1. A method for managing networks for wideband streaming L-band (WISL) services on aircraft,comprising:connecting an antenna of an aircraft to a high speed data terminal via an L-band modem on the aircraft; establishing a communication link between the antenna of the aircraft and a ground station via a satellite, said satellite having a beam; and managing the communication link between the L-band modem, the satellite and at least one remote location in order to keep the communication link active while the aircraft travels between different satellite beams, wherein a new communication link with a target satellite beam is established while the communication link is allocated with the satellite beam. 1. A network management method for wideband streaming L band (WISL) service on aircrafts, comprising the steps of: connecting an antenna of an aircraft to a high speed data terminal; providing an L Band modem in the aircraft; establishing a communication link between the antenna of the aircraft and a ground station via a satellite; and network managing the communication link between the L Band modem on the aircraft and the satellite and remote locations in order to keep the communication link active while the aircraft travels between different beams controlled by different L-band leases, wherein the network managing comprises: controlling the network managing through a ground station having a server; and providing a management database of lease inventory to allow an administrator to create, modify and remove leases for different satellite regions. 11. A network system for providing wideband streaming L-band (WISL) services on aircraft, comprising: an L-band modem on the aircraft connected between an antenna and a high speed data terminal in the aircraft; and a ground based network management system for managing a communication link between the L-band modem, a satellite having a beam, and at least one remote location in order to keep the communication link with [[a]] the satellite beam active while the aircraft travels between different satellite beams, wherein a new communication link with a target satellite beam is established while the communication link is allocated with the satellite beam. 15. A network management system for aircraft wideband streaming L band, comprising: an L Band modem connected between an antenna and a high speed data terminal in an aircraft; a remote ground based network manager for managing a communication link between the L Band modem on the aircraft and a satellite and at least one remote location, in order to keep the communication link active while the aircraft travels between different beams controlled by different L-band leases, wherein said managing the communication link is controlled through a ground station having a server; and a management database of lease inventory to allow an administrator to create, modify and remove leases for different satellite regions. Claims 1-20 are rejected on the ground of nonstatutory double patenting as being unpatentable over claims 1-20 of U.S. Patent No. 11,689,279. Although the claims at issue are not identical, they are not patentably distinct from each other because of the mapping below: Instant Application Patent 11,689,279 1. A method for managing networks for wideband streaming L-band (WISL) services on aircraft,comprising:connecting an antenna of an aircraft to a high speed data terminal via an L-band modem on the aircraft;establishing a communication link between the antenna of the aircraft and a ground station via a satellite, said satellite having a beam; andmanaging the communication link between the L-band modem, the satellite and at least one remote location in order to keep the communication link active while the aircraft travels between different satellite beams, wherein a new communication link with a target satellite beam is established while the communication link is allocated with the satellite beam. 1. A method for managing networks for wideband streaming L-band (WISL) services on a plurality of aircraft, comprising: connecting, for each of the aircraft comprising the plurality of aircraft, an antenna and a high speed data terminal via an L-band modem; establishing, for each of the aircraft comprising the plurality of aircraft, a communication link between the antenna of the aircraft and a ground station, via a satellite, having a beam; and for each of the aircraft comprising the plurality of aircraft, managing the communication link between the L-band modem, the satellite and at least one remote location in order to keep the communication link active during a specified period of time, while each aircraft comprising the plurality of aircraft is in the satellite beam, such that no two aircraft of the plurality of aircraft transmit to the satellite, in the said beam, on the same frequency, at the same time. 2. The method of claim 1wherein managing the communication link further comprises maintaining the communication link with the satellite beam until the aircraft leaves the satellite beam. 2. The method of claim 1 wherein the step of managing the communication link further comprises maintaining the communication link with the satellite beam until each aircraft comprising the plurality of aircraft leaves the satellite beam. 3. The method of claim 1wherein managing the communication link further comprises completing the new communication link with the target satellite beam while the aircraft is within an overlap of the satellite beam and the target satellite beam. 3. The method of claim 1 wherein managing the communication link further comprises completing the new communication link with the target satellite beam while each aircraft comprising the plurality of aircraft is within an overlap of the satellite beam and the target satellite beam. 4. The method of claim 1wherein the managing the communication link further comprises: querying a global resource manager for updates indicating whether the aircraft reaches the target satellite beam;determining transmitting and receiving (Tx/Rx) frequencies to use based on the target satellite beam;sending commands to a teleport modem in the ground station and the L-band modem to tune the teleport and L-band modems to communicate on the target satellite beam; andterminating the communication link with the satellite beam when the aircraft leaves the satellite beam. 4. The method of claim 1 wherein the managing the communication link further comprises: querying a global resource manager for updates indicating whether each aircraft comprising the plurality of aircraft reaches the target satellite beam; determining transmitting and receiving (Tx/Rx) frequencies to use based on the target satellite beam; sending commands to a teleport modem in the ground station and the L-band modem to tune the teleport and L-band modems to communicate on the target satellite beam; and terminating the communication link with the satellite beam when each aircraft comprising the plurality of aircraft leaves the satellite beam. 5. The method of claim 1wherein the managing the communication link further comprises connecting the L-band modem with a network management system through management and control (M&C) link via a swift broadband (SBB) modem on the aircraft, wherein the SBB modem assigns a static IP address to allow communication with the network management system. 5. The method of claim 1 wherein the managing the communication link further comprises connecting the L-band modem with a network management system through management and control (M&C) link via a swift broadband (SBB) modem on the aircraft, wherein the SBB modem assigns a static IP address to allow communication with the network management system. 6. The method of claim 5 wherein the managing the communication link further comprises communicating through the M&C link in order to keep the communication link active while the aircraft travels between different satellite beams. 6. The method of claim 5 wherein the managing the communication link further comprises communicating through the M&C link in order to keep the communication link active while each aircraft comprising the plurality of aircraft travels between different satellite beams. 7. The method of claim 5 wherein the M&C link is used as a forward link for the communication link, wherein the forward link is provided with n x 100 kHz, where n is a natural number. 7. The method of claim 5 wherein the M&C link is used as a forward link for the communication link, wherein the forward link is provided with n×100 kHz, where n is a natural number. 8. The method of claim 1 wherein the target beam is provided by a different L-band lease from the satellite beam, and the managing the communication link further comprises allowing the communication link to transit to a new L-band lease and component beams of the new L-band lease by managing frequencies of each L-band lease and dynamically updating the L-band modem aboard the aircraft based on a geographic location of the L-band modem. 8. The method of claim 1 wherein the target beam is provided by a different L-band lease from the satellite beam, and the managing the communication link further comprises allowing the communication link to transit to a new L-band lease and component beams of the new L-band lease by managing frequencies of each L-band lease and dynamically updating the L-band modem aboard each aircraft comprising the plurality of aircraft based on a geographic location of the L-band modem. 9. The method of claim 1 wherein an L-band lease of the satellite beam allocates multiple beams from the satellite, and the managing the communication link further comprises allowing the communication link to transit between any satellite beams within the L-band lease. 9. The method of claim 1 wherein an L-band lease of the satellite beam allocates multiple beams from the satellite, and the managing the communication link further comprises allowing the communication link to transit between any satellite beams within the L-band lease. 10. The method of claim 1 wherein the managing the communication link further comprises providing for service operations to schedule activation of a selected lease with the aircraft. 10. The method of claim 1 wherein the managing the communication link further comprises providing for service operations to schedule activation of a selected lease with each aircraft comprising the plurality of aircraft. 11. A network system for providing wideband streaming L-band (WISL) services on aircraft, comprising:an L-band modem on the aircraft connected between an antenna and a high speed data terminal in the aircraft; anda ground based network management system for managing a communication link between the L-band modem, a satellite having a beam, and at least one remote location in order to keep the communication link with [[a]] the satellite beam active while the aircraft travels between different satellite beams, wherein a new communication link with a target satellite beam is established while the communication link is allocated with the satellite beam. 11. A network system for providing wideband streaming L-band (WISL) services on a plurality of aircraft, comprising: an L-band modem on each aircraft comprising the plurality of aircraft connected between an antenna and a high speed data terminal; and a ground based network management system for managing a communication link between the L-band modem, a satellite having a beam, and at least one remote location in order to keep the communication link with the satellite beam active while each aircraft comprising the plurality of aircraft travels between different satellite beams, wherein a new communication link with a target satellite beam is established while the communication link is allocated with the satellite beam. 12. The network system of claim 11 wherein the communication link with the beam is maintained until the aircraft leaves the satellite beam. 12. The network system of claim 11 wherein, for each aircraft comprising the plurality of aircraft, the communication link with the beam is maintained until the aircraft leaves the satellite beam. 13. The network system of claim 11 wherein the new communication link with the target beam is completed while the aircraft is within an overlap of the satellite beam and the target satellite beam. 13. The network system of claim 11 wherein the new communication link with the target beam is completed while each aircraft comprising the plurality of aircraft is within an overlap of the satellite beam and the target satellite beam. 14. The network system of claim 11 wherein the management system performs: querying a global resource manager for updates indicating whether the aircraft reaches the target satellite beam;determining transmitting and receiving (Tx/Rx) frequencies to use based on the target satellite beam;sending commands to a teleport modem in the ground station and the L-band modem on the aircraft to tune the teleport and L-band modems to communicate on the target satellite beam;and terminating the communication link with the beam when the aircraft leaves the satellite beam. 14. The network system of claim 11 wherein the management system performs, for each aircraft comprising the plurality of aircraft: querying a global resource manager for updates indicating whether the aircraft reaches the target satellite beam; determining transmitting and receiving (Tx/Rx) frequencies to use based on the target satellite beam; sending commands to a teleport modem in the ground station and the L-band modem on the aircraft to tune the teleport and L-band modems to communicate on the target satellite beam; and terminating the communication link with the beam when the aircraft leaves the satellite beam. 15. The network system of claim 11 wherein the L-band modem is connected with the network management system through management and control (M&C) link via a swift broadband (SBB) modem on the aircraft, wherein the SBB modem assigns a static IP address to allow communication with the network management system. 15. The network system of claim 11 wherein the L-band modem is connected with the network management system through management and control (M&C) link via a swift broadband (SBB) modem on each aircraft comprising the plurality of aircraft, wherein the SBB modem assigns a static IP address to allow communication with the network management system. 16. The network system of claim 15 wherein the M&C link is used for communications in order to keep the communication link active while the aircraft travels between different satellite beams. 16. The network system of claim 15 wherein the M&C link is used for communications in order to keep the communication link active while each aircraft comprising the plurality of aircraft travels between different satellite beams. 17. The network system of claim 15 wherein the M&C link is used as a forward link for the communication link, wherein the forward link is provided with n x 100 kHz, where n is a natural number. 17. The network system of claim 15 wherein the M&C link is used as a forward link for the communication link, wherein the forward link is provided with n×100 kHz, where n is a natural number. 18. The network system of claim 11 wherein the target satellite beam is provided by a different L-band lease from the satellite beam, and network management system allows the communication link to transit to a new L-band lease and component satellite beams of the new L-band lease by managing frequencies of each L-band lease and dynamically updating the L-band modem aboard the aircraft based on a geographic location of the L-band modem. 18. The network system of claim 11 wherein the target satellite beam is provided by a different L-band lease from the satellite beam, and network management system allows the communication link to transit to a new L-band lease and component satellite beams of the new L-band lease by managing frequencies of each L-band lease and dynamically updating the L-band modem aboard each aircraft comprising the plurality of aircraft based on a geographic location of the L-band modem. 19. The network system of claim 11 wherein an L-band lease of the satellite beam allocates multiple satellite beams from the satellite, and the network management system allows the communication link to transit between any satellite beams within the L-band lease. 19. The network system of claim 11 wherein an L-band lease of the satellite beam allocates multiple satellite beams from the satellite, and the network management system allows the communication link to transit between any satellite beams within the L-band lease. 20. The network system of claim 11 wherein the network managing system provides for service operations to schedule activation of a selected lease with the aircraft. 20. The network system of claim 11 wherein the network managing system provides for service operations to schedule activation of a selected lease with each aircraft comprising the plurality of aircraft. Claims 1-7, 9-17, 20 are rejected on the ground of nonstatutory double patenting as being unpatentable over claims 1-16, 18 of U.S. Patent No. 12,166,567. Although the claims at issue are not identical, they are not patentably distinct from each other because of the mapping below: Instant Application Patent 11,689,279 1. A method for managing networks for wideband streaming L-band (WISL) services on aircraft,comprising:connecting an antenna of an aircraft to a high speed data terminal via an L-band modem on the aircraft;establishing a communication link between the antenna of the aircraft and a ground station via a satellite, said satellite having a beam; andmanaging the communication link between the L-band modem, the satellite and at least one remote location in order to keep the communication link active while the aircraft travels between different satellite beams, wherein a new communication link with a target satellite beam is established while the communication link is allocated with the satellite beam. 1. (currently amended) A method for managing networks for wideband streaming services on an aircraft, comprising:establishing a communication link between an antenna of the aircraft and a ground station via a satellite, said satellite having a satellite beam; andmanaging the communication link between the antenna, the satellite and at least one remote location in order to keep the communication link active while the aircraft travels between different satellite beams, wherein a new communication link with a target satellite beam is established while the communication link is allocated with the satellite beam. 2. The method of claim 1wherein managing the communication link further comprises maintaining the communication link with the satellite beam until the aircraft leaves the satellite beam. 2. (original) The method of claim 1 wherein managing the communication link further comprises maintaining the communication link with the satellite beam until the aircraft leaves the satellite beam. 3. The method of claim 1wherein managing the communication link further comprises completing the new communication link with the target satellite beam while the aircraft is within an overlap of the satellite beam and the target satellite beam. 3. (original) The method of claim 1 wherein managing the communication link further comprises completing the new communication link with the target satellite beam while the aircraft is within an overlap of the satellite beam and the target satellite beam. 4. The method of claim 1wherein the managing the communication link further comprises: querying a global resource manager for updates indicating whether the aircraft reaches the target satellite beam;determining transmitting and receiving (Tx/Rx) frequencies to use based on the target satellite beam;sending commands to a teleport modem in the ground station and the L-band modem to tune the teleport and L-band modems to communicate on the target satellite beam; andterminating the communication link with the satellite beam when the aircraft leaves the satellite beam. 4. (previously presented) The method of claim 1 wherein the managing the communication link further comprises:querying a global resource manager for updates indicating whether the aircraft reaches the target satellite beam;determining transmitting and receiving (Tx/Rx) frequencies to use based on the target satellite beam; sending commands to a teleport modem in the ground station and the antenna to tune the teleport and antenna to communicate on the target satellite beam; andterminating the communication link with the satellite beam when the aircraft leaves the satellite beam. 5. The method of claim 1wherein the managing the communication link further comprises connecting the L-band modem with a network management system through management and control (M&C) link via a swift broadband (SBB) modem on the aircraft, wherein the SBB modem assigns a static IP address to allow communication with the network management system. 5. (previously presented) The method of claim 1 wherein the managing the communication link further comprises connecting the antenna with a network management system through management and control (M&C) link via a swift broadband (SBB) modem on the aircraft, wherein the SBB modem assigns a static IP address to allow communication with the network management system. 6. The method of claim 5 wherein the managing the communication link further comprises communicating through the M&C link in order to keep the communication link active while the aircraft travels between different satellite beams. 6. (original) The method of claim 5 wherein the managing the communication link further comprises communicating through the M&C link in order to keep the communication link active while the aircraft travels between different satellite beams. 7. The method of claim 5 wherein the M&C link is used as a forward link for the communication link, wherein the forward link is provided with n x 100 kHz, where n is a natural number. 7. (original) The method of claim 5 wherein the M&C link is used as a forward link for the communication link, wherein the forward link is provided with n x 100 kHz, where n is a natural number. 9. The method of claim 1 wherein an L-band lease of the satellite beam allocates multiple beams from the satellite, and the managing the communication link further comprises allowing the communication link to transit between any satellite beams within the L-band lease. 8. (previously presented) The method of claim 1 wherein the satellite beam allocates multiple beams from the satellite, and the managing the communication link further comprises allowing the communication link to transit between any satellite beams. 10. The method of claim 1 wherein the managing the communication link further comprises providing for service operations to schedule activation of a selected lease with the aircraft. 9. (original) The method of claim 1 wherein the managing the communication link further comprises providing for service operations to schedule activation of a selected lease with the aircraft. 11. A network system for providing wideband streaming L-band (WISL) services on aircraft, comprising:an L-band modem on the aircraft connected between an antenna and a high speed data terminal in the aircraft; anda ground based network management system for managing a communication link between the L-band modem, a satellite having a beam, and at least one remote location in order to keep the communication link with [[a]] the satellite beam active while the aircraft travels between different satellite beams, wherein a new communication link with a target satellite beam is established while the communication link is allocated with the satellite beam. 10. A network system for providing wideband streaming services on an aircraft, comprising: a ground based network management system for managing a communication link between an antenna, a satellite having a satellite beam, and at least one remote location in order to keep the communication link with the satellite beam active while the aircraft travels between different satellite beams, wherein a new communication link with a target satellite beam is established while the communication link is allocated with the satellite beam. 12. The network system of claim 11 wherein the communication link with the beam is maintained until the aircraft leaves the satellite beam. 11. The network system of claim 10 wherein the communication link with the beam is maintained until the aircraft leaves the satellite beam. 13. The network system of claim 11 wherein the new communication link with the target beam is completed while the aircraft is within an overlap of the satellite beam and the target satellite beam. 12. The network system of claim 10 wherein the new communication link with the target beam is completed while the aircraft is within an overlap of the satellite beam and the target satellite beam. 14. The network system of claim 11 wherein the management system performs: querying a global resource manager for updates indicating whether the aircraft reaches the target satellite beam;determining transmitting and receiving (Tx/Rx) frequencies to use based on the target satellite beam;sending commands to a teleport modem in the ground station and the L-band modem on the aircraft to tune the teleport and L-band modems to communicate on the target satellite beam;and terminating the communication link with the beam when the aircraft leaves the satellite beam. 13. The network system of claim 10 wherein the management system performs: querying a global resource manager for updates indicating whether the aircraft reaches the target satellite beam; determining transmitting and receiving (Tx/Rx) frequencies to use based on the target satellite beam; sending commands to a teleport modem in the ground station and the antenna on the aircraft to tune the teleport and antenna to communicate on the target satellite beam; and terminating the communication link with the satellite beam when the aircraft leaves the satellite beam. 15. The network system of claim 11 wherein the L-band modem is connected with the network management system through management and control (M&C) link via a swift broadband (SBB) modem on the aircraft, wherein the SBB modem assigns a static IP address to allow communication with the network management system. 14. The network system of claim 10 wherein the antenna is connected with the network management system through management and control (M&C) link via a swift broadband (SBB) modem on the aircraft, wherein the SBB modem assigns a static IP address to allow communication with the network management system. 16. The network system of claim 15 wherein the M&C link is used for communications in order to keep the communication link active while the aircraft travels between different satellite beams. 15. The network system of claim 14 wherein the M&C link is used for communications in order to keep the communication link active while the aircraft travels between different satellite beams. 17. The network system of claim 15 wherein the M&C link is used as a forward link for the communication link, wherein the forward link is provided with n x 100 kHz, where n is a natural number. 16. The network system of claim 14 wherein the M&C link is used as a forward link for the communication link, wherein the forward link is provided with n×100 kHz, where n is a natural number. 20. The network system of claim 11 wherein the network managing system provides for service operations to schedule activation of a selected lease with the aircraft. 18. The network system of claim 10 wherein the network managing system provides for service operations to schedule activation of a selected lease with the aircraft. Allowable Subject Matter Claims 1-20 are allowable if the above double patenting rejections were overcome. Claims 1-20 are allowable over prior art since the prior art taken individually or in combination fails to particularly disclose, fairly suggests, or render obvious the following limitations: In claim 1, … connecting an antenna of an aircraft to a high speed data terminal via an L-band modem on the aircraft; establishing a communication link between the antenna of the aircraft and a ground station via a satellite, said satellite having a beam; and managing the communication link between the L-band modem, the satellite and at least one remote location in order to keep the communication link active while the aircraft travels between different satellite beams, wherein a new communication link with a target satellite beam is established while the communication link is allocated with the satellite beam.…in combination with other limitations recited as specified in Claim 1. The first closest prior art of record is Threadgill et al (Patent No: 6,185,409). Threadgill teaches connecting an antenna of an aircraft to a high speed data terminal via an L-band modem on the aircraft (Threadgill, Col 24 L12-20); establishing a communication link between the antenna of the aircraft and a ground station via a satellite; and managing the communication link between the L-band modem (Threadgill, Col 6 L30-40). Threadgill does not teach the italicized limitations. The second closest prior art of record is Axmon et al (Pub No: 2017/0171792). Axmon teaches keep the communication link active while the aircraft travels between different satellite beams (Axmon, [0074]). Axmon does not teach the italicized limitations above. For these reasons, in conjunction with the other limitations of the independent claims, puts this case in condition for allowance. Conclusion The prior art made of record and not relied upon is considered pertinent to applicant's disclosure. Faccin et al (Patent No: 8,498,268) Fig 2-3 Rockwell et al (Pub No: 2003/0027551) [0010-0017] Any inquiry concerning this communication or earlier communications from the examiner should be directed to AFSHAWN M TOWFIGHI whose telephone number is (571)270-7296. The examiner can normally be reached M-F 8:00 AM -5:00 PM. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Ian N Moore can be reached on 571-272-3085. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /AFSHAWN M TOWFIGHI/Primary Examiner, Art Unit 2469
Read full office action

Prosecution Timeline

Dec 09, 2024
Application Filed
Sep 30, 2026
Non-Final Rejection mailed — §101, §DP (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12787062
CLEAR TO SEND FRAME TRANSMISSION ON A NON-PRIMARY CHANNEL
2y 10m to grant Granted Nov 03, 2026
Patent 12786885
COMMUNICATION SESSION SETUP PROCEDURE THAT ACCOUNTS FOR ENDPOINT BATTERY STATUS
2y 7m to grant Granted Nov 03, 2026
Patent 12786773
METHOD AND APPARATUS FOR RECEIVING MEASUREMENT GAP CONFIGURATION INFORMATION, METHOD AND APPARATUS FOR SENDING MEASUREMENT GAP CONFIGURATION INFORMATION, AND MEDIUM
2y 7m to grant Granted Nov 03, 2026
Patent 12777496
APPARATUS, BASE STATION, AND COMMUNICATION METHOD
2y 6m to grant Granted Oct 27, 2026
Patent 12777508
UE CAPABILITY REPORT ON PANEL AND BEAM SWITCHING
2y 8m to grant Granted Oct 27, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

1-2
Expected OA Rounds
88%
Grant Probability
97%
With Interview (+9.0%)
2y 6m (~7m remaining)
Median Time to Grant
Low
PTA Risk
Based on 990 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month