Prosecution Insights
Last updated: July 17, 2026
Application No. 18/985,780

GAS DISCHARGE CAP AND COSMETIC CONTAINER INCLUDING THE SAME

Final Rejection §112
Filed
Dec 18, 2024
Priority
Apr 17, 2024 — RE 10-2024-0051341
Examiner
VOLZ, ELIZABETH J
Art Unit
3733
Tech Center
3700 — Mechanical Engineering & Manufacturing
Assignee
Woosungplatech Co. Ltd.
OA Round
2 (Final)
67%
Grant Probability
Favorable
3-4
OA Rounds
1y 2m
Est. Remaining
86%
With Interview

Examiner Intelligence

Grants 67% — above average
67%
Career Allowance Rate
731 granted / 1096 resolved
-3.3% vs TC avg
Strong +19% interview lift
Without
With
+18.8%
Interview Lift
resolved cases with interview
Typical timeline
2y 9m
Avg Prosecution
41 currently pending
Career history
1148
Total Applications
across all art units

Statute-Specific Performance

§101
0.4%
-39.6% vs TC avg
§103
66.4%
+26.4% vs TC avg
§102
18.4%
-21.6% vs TC avg
§112
9.2%
-30.8% vs TC avg
Black line = Tech Center average estimate • Based on career data from 1096 resolved cases

Office Action

§112
DETAILED ACTION Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . Claim Objections The claims are objected to because they include reference characters which are not enclosed within parentheses. Reference characters corresponding to elements recited in the detailed description of the drawings and used in conjunction with the recitation of the same element or group of elements in the claims should be enclosed within parentheses so as to avoid confusion with other numbers or characters which may appear in the claims. See MPEP § 608.01(m). Claim Rejections - 35 USC § 112 Claims 1-6 and 8 are rejected under 35 U.S.C. 112(b) or 35 U.S.C. 112 (pre-AIA ), second paragraph, as being indefinite for failing to particularly point out and distinctly claim the subject matter which the inventor or a joint inventor (or for applications subject to pre-AIA 35 U.S.C. 112, the applicant), regards as the invention. Regarding Claim 1, it is unclear how there is a 4th sealing area without a 1st through 3rd sealing area. There is also no mention of a 3rd sealing area in any depending claims. Response to Arguments Applicant’s arguments with respect to claim(s) 1-6 and 8 have been considered but are moot because the new ground of rejection does not rely on any reference applied in the prior rejection of record for any teaching or matter specifically challenged in the argument. Allowable Subject Matter Claims 1-6 and 8 would be allowable if rewritten or amended to overcome the rejection(s) under 35 U.S.C. 112(b) or 35 U.S.C. 112 (pre-AIA ), 2nd paragraph, set forth in this Office action. The allowable subject matter is the check valve including an inclined upper outer surface to correspond to a shape of a lower inner surface of the outer cap sub-vertical frame and an arm with a bottom surface arm recess along with a non-woven fabrics foam packing portion. Conclusion Applicant's amendment necessitated the new ground(s) of rejection presented in this Office action. Accordingly, THIS ACTION IS MADE FINAL. See MPEP § 706.07(a). Applicant is reminded of the extension of time policy as set forth in 37 CFR 1.136(a). A shortened statutory period for reply to this final action is set to expire THREE MONTHS from the mailing date of this action. In the event a first reply is filed within TWO MONTHS of the mailing date of this final action and the advisory action is not mailed until after the end of the THREE-MONTH shortened statutory period, then the shortened statutory period will expire on the date the advisory action is mailed, and any nonprovisional extension fee (37 CFR 1.17(a)) pursuant to 37 CFR 1.136(a) will be calculated from the mailing date of the advisory action. In no event, however, will the statutory period for reply expire later than SIX MONTHS from the mailing date of this final action. Any inquiry concerning this communication or earlier communications from the examiner should be directed to ELIZABETH J VOLZ whose telephone number is (571)270-5430. The examiner can normally be reached Monday-Friday 11am-7pm est. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, NATHAN JENNESS can be reached at (571)270-5055. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /E.J.V/Examiner, Art Unit 3733 /JEFFREY R ALLEN/Primary Examiner, Art Unit 3733
Read full office action

Prosecution Timeline

Dec 18, 2024
Application Filed
Jan 15, 2026
Non-Final Rejection mailed — §112
Mar 30, 2026
Response Filed
Jun 16, 2026
Final Rejection mailed — §112 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12680259
Sealing and Locking Valve Box Lid
4y 8m to grant Granted Jul 14, 2026
Patent 12677987
LID FOR COOKING APPLIANCE
2y 8m to grant Granted Jul 14, 2026
Patent 12667212
ADJUSTABLE BEVERAGE CONTAINER HOLDER
1y 9m to grant Granted Jun 30, 2026
Patent 12663116
TANK WITH AN INTEGRAL EQUIPMENT SUPPORT TO WHICH VARIOUS EQUIPMENT UNITS ARE CONNECTED AND METHOD OF MANUFACTURING SAID TANK
3y 4m to grant Granted Jun 23, 2026
Patent 12654927
COLLAPSIBLE CARGO CONTAINER ASSEMBLY
2y 5m to grant Granted Jun 16, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

3-4
Expected OA Rounds
67%
Grant Probability
86%
With Interview (+18.8%)
2y 9m (~1y 2m remaining)
Median Time to Grant
Moderate
PTA Risk
Based on 1096 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month