Prosecution Insights
Last updated: November 04, 2026
Application No. 19/003,232

CONCRETE WORKABILITY METER

Non-Final OA §DOUBLEPATENT
Filed
Dec 27, 2024
Priority
Jun 14, 2021 — provisional 63/210,264 +1 more
Examiner
ROYSTON, JOHN M
Art Unit
2855
Tech Center
2800 — Semiconductors & Electrical Systems
Assignee
Minnich Manufacturing Company Inc.
OA Round
1 (Non-Final)
78%
Grant Probability
Favorable
1-2
OA Rounds
8m
Est. Remaining
95%
With Interview

Examiner Intelligence

Grants 78% — above average
78%
Career Allowance Rate
520 granted / 666 resolved
+10.1% vs TC avg
Strong +17% interview lift
Without
With
+16.6%
Interview Lift
resolved cases with interview
Typical timeline
2y 6m
Avg Prosecution
36 currently pending
Career history
712
Total Applications
across all art units

Statute-Specific Performance

§101
3.5%
-36.5% vs TC avg
§103
53.0%
+13.0% vs TC avg
§102
22.1%
-17.9% vs TC avg
§112
18.5%
-21.5% vs TC avg
Black line = Tech Center average estimate • Based on career data from 666 resolved cases

Office Action

§DOUBLEPATENT
DETAILED ACTION Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . Election/Restrictions Applicant’s election without traverse of group I, claims 1-17 in the reply filed on 4 September 2026 is acknowledged. Claims 18-20 are hereby withdrawn as being drawn to a non-elected invention pursuant to the above. Double Patenting The nonstatutory double patenting rejection is based on a judicially created doctrine grounded in public policy (a policy reflected in the statute) so as to prevent the unjustified or improper timewise extension of the “right to exclude” granted by a patent and to prevent possible harassment by multiple assignees. A nonstatutory double patenting rejection is appropriate where the conflicting claims are not identical, but at least one examined application claim is not patentably distinct from the reference claim(s) because the examined application claim is either anticipated by, or would have been obvious over, the reference claim(s). See, e.g., In re Berg, 140 F.3d 1428, 46 USPQ2d 1226 (Fed. Cir. 1998); In re Goodman, 11 F.3d 1046, 29 USPQ2d 2010 (Fed. Cir. 1993); In re Longi, 759 F.2d 887, 225 USPQ 645 (Fed. Cir. 1985); In re Van Ornum, 686 F.2d 937, 214 USPQ 761 (CCPA 1982); In re Vogel, 422 F.2d 438, 164 USPQ 619 (CCPA 1970); In re Thorington, 418 F.2d 528, 163 USPQ 644 (CCPA 1969). A timely filed terminal disclaimer in compliance with 37 CFR 1.321(c) or 1.321(d) may be used to overcome an actual or provisional rejection based on nonstatutory double patenting provided the reference application or patent either is shown to be commonly owned with the examined application, or claims an invention made as a result of activities undertaken within the scope of a joint research agreement. See MPEP § 717.02 for applications subject to examination under the first inventor to file provisions of the AIA as explained in MPEP § 2159. See MPEP § 2146 et seq. for applications not subject to examination under the first inventor to file provisions of the AIA . A terminal disclaimer must be signed in compliance with 37 CFR 1.321(b). The filing of a terminal disclaimer by itself is not a complete reply to a nonstatutory double patenting (NSDP) rejection. A complete reply requires that the terminal disclaimer be accompanied by a reply requesting reconsideration of the prior Office action. Even where the NSDP rejection is provisional the reply must be complete. See MPEP § 804, subsection I.B.1. For a reply to a non-final Office action, see 37 CFR 1.111(a). For a reply to final Office action, see 37 CFR 1.113(c). A request for reconsideration while not provided for in 37 CFR 1.113(c) may be filed after final for consideration. See MPEP §§ 706.07(e) and 714.13. The USPTO Internet website contains terminal disclaimer forms which may be used. Please visit www.uspto.gov/patent/patents-forms. The actual filing date of the application in which the form is filed determines what form (e.g., PTO/SB/25, PTO/SB/26, PTO/AIA /25, or PTO/AIA /26) should be used. A web-based eTerminal Disclaimer may be filled out completely online using web-screens. An eTerminal Disclaimer that meets all requirements is auto-processed and approved immediately upon submission. For more information about eTerminal Disclaimers, refer to www.uspto.gov/patents/apply/applying-online/eterminal-disclaimer. Claims 1-17 are rejected on the ground of nonstatutory double patenting as being unpatentable over claims 1-9, 11, and 19 of Jawarski et al. U.S. Patent No. 12,216,107 B2 (hereafter, “the 107 patent”). Although the claims at issue are not identical, they are not patentably distinct as indicated below in further detail. Differences between the claimed invention and the claims of the 107 patent are highlighted by bold and an explanation of how the claims are considered to be commensurate in scope is included as necessary. Claims of the instant application Claims of the 107 patent 1. A concrete testing system comprising: a concrete testing instrument; and a frame assembly configured to slidingly support the concrete testing instrument, the frame assembly including a plurality of legs rotatably and adjustably coupled to a slider plate of the frame assembly. 1. Concrete workability meter assembly comprising: a testing assembly including a concrete testing instrument operatively connected to a vibrator; and a frame assembly configured to slidingly support the testing assembly, wherein the frame assembly includes a slider plate configured to permit relative sliding between the slider plate and the vibrator. Claim 1 of the 107 patent does not explicitly teach the bold feature of claim 1 of the instant application. However, claim 11 of the 107 patent recites “wherein the frame assembly includes a plurality of legs rotatably and adjustably coupled to a slider plate”. It would have been obvious to one having ordinary skill in the art before the effective filing date of the claimed invention to modify claim 1 of the 107 patent such that the frame assembly includes a plurality of legs rotatably and adjustably coupled to the slider plate because such legs allow for greater control of the testing assembly by accounting for different geometries which can be encountered for different test environments in which the workability device is employed. Furthermore, such a configuration also allows for the slider plate to be mobile such that the vibrator may be positioned in a configuration most favorable to carry out tests using the device. 2. The system according to claim 1, further comprising a vibrator operatively coupled to the concrete testing instrument. (the claim scopes are considered to be identical) 19. A concrete workability meter assembly comprising: a testing assembly including a concrete testing instrument operatively connected to a vibrator; and a frame assembly configured to slidingly support the testing assembly, wherein the frame assembly is configured to permit relative sliding between the frame assembly and the vibrator. 3. The system according to claim 2, wherein the vibrator includes a variable speed motor and is controllable to manipulate the testing instrument. (the claim scopes are considered to be identical) 2. The assembly according to claim 1, wherein the vibrator includes a variable speed motor and is controllable to manipulate the testing instrument. 4. The system according to claim 2, wherein the slider plate is configured to permit relative sliding between the slider plate and the vibrator. (the claim scopes are considered to be identical) 1. Concrete workability meter assembly comprising: a testing assembly including a concrete testing instrument operatively connected to a vibrator; and a frame assembly configured to slidingly support the testing assembly, wherein the frame assembly includes a slider plate configured to permit relative sliding between the slider plate and the vibrator. 5. The system according to claim 2, wherein the slider plate includes a central bore includes least one notch configured to receive a correspondingly shaped at least one tab portion positioned vertically along the vibrator, the at least one tab portion and notch configured to provide alignment and guided movement between the vibrator and slider plate. (the claim scopes are considered to be identical) 5. The assembly according to claim 1, wherein the slider plate includes a central bore includes at least one notch configured to receive a correspondingly shaped at least one tab portion positioned vertically along the vibrator, the at least one tab portion and notch configured to provide alignment and guided movement between the vibrator and slider plate. 6. The system according to claim 5, wherein the slider plate includes a plurality of apertures sized and placed to retain at least a portion of the concrete testing instrument. (the claim scopes are considered to be coextensive because claim 6 of the instant application is broader than the scope of claim 8) 8. The assembly according to claim 7 wherein the frame assembly includes a slider plate configured to permit relative sliding between the slider plate and the vibrator, the slider plate includes a plurality of apertures sized and placed to retain at least a portion of the testing assembly. 7. The system according to claim 2, further comprising a shaft extending between the vibrator and testing instrument, the shaft configured to transfer vibrating energy from vibrator to the testing instrument. (the claim scopes are considered to be identical) 3. The assembly according to claim 1 further comprising a shaft extending between the vibrator and testing instrument, the shaft configured to transfer vibrating energy from vibrator to the testing instrument. 8. The system according to claim 7, wherein the testing instrument is a kelly ball. (the claim scopes are considered to be identical) 4. The assembly according to claim 1, wherein the testing instrument is a kelly ball. 9. The system according to claim 2, further comprising a cage assembly that shrouds a motor of the vibrator. (the claim scopes are considered to be identical) 6. The assembly according to claim 1, further comprising a cage assembly that shrouds a motor of the vibrator. 10. The system according claim 9, wherein the cage assembly includes a pair of endcaps and at least one handle extending therebetween wherein the at least one handle is isolated from vibrations. (the claim scopes are considered to be identical) 7. The assembly according claim 6, wherein the cage assembly includes a pair of endcaps and at least one handle extending therebetween wherein the at least one handle is isolated from vibrations. 11. The system according to claim 1, wherein the frame assembly includes a locking assembly capable of having an engaged position that locks the concrete testing instrument to the frame assembly and a disengaged position that allows sliding movement of the concrete testing instrument relative to the frame assembly. (the claim scopes are considered to be identical) 9. The assembly according to claim 1, wherein the frame assembly includes a locking system capable of having an engaged position that locks the testing assembly to the frame assembly and a disengaged position that allows sliding movement of the testing assembly relative to the frame assembly. 12. A concrete testing system comprising: a concrete testing instrument; and a frame assembly configured to permit relative sliding between the frame assembly and the concrete testing instrument. (the claim scopes are considered to be coextensive because the concrete testing instrument of the instant application is considered to fall within the scope of a concrete workability meter assembly in the 107 patent) 19. A concrete workability meter assembly comprising: a testing assembly including a concrete testing instrument operatively connected to a vibrator; and a frame assembly configured to slidingly support the testing assembly, wherein the frame assembly is configured to permit relative sliding between the frame assembly and the vibrator. 13. The system according to claim 12, the frame assembly including a plurality of legs rotatably and adjustably coupled to a slider plate of the frame assembly. (the claim scopes are considered to be coextensive) 11. The assembly according to claim 1, wherein the frame assembly includes a plurality of legs rotatably and adjustably coupled to a slider plate. 14. The system according to claim 13, further comprising a test assembly including the concrete testing instrument and a vibrator operatively coupled to the concrete testing instrument, wherein the frame assembly slidingly supports the testing instrument to permit relative sliding between the frame assembly and the vibrator. (the claim scopes are considered to be coextensive) 19. A concrete workability meter assembly comprising: a testing assembly including a concrete testing instrument operatively connected to a vibrator; and a frame assembly configured to slidingly support the testing assembly, wherein the frame assembly is configured to permit relative sliding between the frame assembly and the vibrator. 15. The system according to claim 14, wherein the slider plate includes a central bore includes least one notch configured to receive a correspondingly shaped at least one tab portion positioned vertically along the vibrator, the at least one tab portion and notch configured to provide alignment and guided movement between the vibrator and slider plate. (the claim scopes are considered to be coextensive) 5. The assembly according to claim 1, wherein the slider plate includes a central bore includes at least one notch configured to receive a correspondingly shaped at least one tab portion positioned vertically along the vibrator, the at least one tab portion and notch configured to provide alignment and guided movement between the vibrator and slider plate. 16. The system according to claim 15, wherein the slider plate includes a plurality of apertures sized and placed to retain at least a portion of the testing assembly. (the claim scopes are considered to be coextensive because claim 16 of the instant application is broader than claim 8 of the 107 patent) 8. The assembly according to claim 7 wherein the frame assembly includes a slider plate configured to permit relative sliding between the slider plate and the vibrator, the slider plate includes a plurality of apertures sized and placed to retain at least a portion of the testing assembly. 17. The system according to claim 16, further comprising a shaft extending between the vibrator and concrete testing instrument, the shaft configured to transfer vibrating energy from vibrator to the testing instrument. (the claim scopes are considered to be coextensive) 3. The assembly according to claim 1 further comprising a shaft extending between the vibrator and testing instrument, the shaft configured to transfer vibrating energy from vibrator to the testing instrument. References Cited but not Relied Upon As to references cited but not relied upon: Te’eni US Pat 6,227,039 B1 discloses a measuring system for concrete mix and appears pertinent to Applicant’s disclosure. Conclusion Any inquiry concerning this communication or earlier communications from the examiner should be directed to JOHN M ROYSTON whose telephone number is (571)270-7215. The examiner can normally be reached M-F 8-4:30 E.S.T.. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Peter Macchiarolo can be reached at 571-272-2375. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /JOHN M ROYSTON/Examiner, Art Unit 2855
Read full office action

Prosecution Timeline

Dec 27, 2024
Application Filed
Oct 21, 2026
Non-Final Rejection mailed — §DOUBLEPATENT (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12781624
METHOD FOR DETERMINING PHYSICAL PROPERTIES OF ROCKS AND ROCK MATRIX FROM DRILLING DATA, MUD GAS DATA, AND DRILL CUTTINGS IMAGES
2y 6m to grant Granted Nov 03, 2026
Patent 12774998
FOOD TEXTURE MEASURING APPARATUS AND FOOD TEXTURE MEASURING METHOD
2y 9m to grant Granted Oct 27, 2026
Patent 12768693
SELECTING A ZERO-VERIFICATION CRITERIA FOR A ZERO VERIFICATION OF A VIBRATORY METER
2y 11m to grant Granted Oct 20, 2026
Patent 12760670
Method And Device For Determining The Engine Oil Quality Of An Internal Combustion Engine
4y 7m to grant Granted Oct 13, 2026
Patent 12761057
STRAIN SENSING
2y 8m to grant Granted Oct 13, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

1-2
Expected OA Rounds
78%
Grant Probability
95%
With Interview (+16.6%)
2y 6m (~8m remaining)
Median Time to Grant
Low
PTA Risk
Based on 666 resolved cases by this examiner. Grant probability derived from career allowance rate.