Prosecution Insights
Last updated: November 20, 2026
Application No. 19/003,332

STORAGE TANK DELIVERY SYSTEM

Non-Final OA §103
Filed
Dec 27, 2024
Priority
Mar 11, 2024 — JP 2024-037370
Examiner
SHAH, KAMINI S
Art Unit
2115
Tech Center
2100 — Computer Architecture & Software
Assignee
Toyota Motor Corporation
OA Round
1 (Non-Final)
28%
Grant Probability
At Risk
1-2
OA Rounds
1y 10m
Est. Remaining
44%
With Interview

Examiner Intelligence

Grants only 28% of cases
28%
Career Allowance Rate
25 granted / 89 resolved
-26.9% vs TC avg
Strong +16% interview lift
Without
With
+16.1%
Interview Lift
resolved cases with interview
Typical timeline
3y 8m
Avg Prosecution
28 currently pending
Career history
137
Total Applications
across all art units

Statute-Specific Performance

§101
17.6%
-22.4% vs TC avg
§103
41.3%
+1.3% vs TC avg
§102
22.5%
-17.5% vs TC avg
§112
15.2%
-24.8% vs TC avg
Black line = Tech Center average estimate • Based on career data from 89 resolved cases

Office Action

§103
Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . Claim Interpretation The following is a quotation of 35 U.S.C. 112(f): (f) Element in Claim for a Combination. – An element in a claim for a combination may be expressed as a means or step for performing a specified function without the recital of structure, material, or acts in support thereof, and such claim shall be construed to cover the corresponding structure, material, or acts described in the specification and equivalents thereof. The following is a quotation of pre-AIA 35 U.S.C. 112, sixth paragraph: An element in a claim for a combination may be expressed as a means or step for performing a specified function without the recital of structure, material, or acts in support thereof, and such claim shall be construed to cover the corresponding structure, material, or acts described in the specification and equivalents thereof. The claims in this application are given their broadest reasonable interpretation using the plain meaning of the claim language in light of the specification as it would be understood by one of ordinary skill in the art. The broadest reasonable interpretation of a claim element (also commonly referred to as a claim limitation) is limited by the description in the specification when 35 U.S.C. 112(f) or pre-AIA 35 U.S.C. 112, sixth paragraph, is invoked. As explained in MPEP § 2181, subsection I, claim limitations that meet the following three-prong test will be interpreted under 35 U.S.C. 112(f) or pre-AIA 35 U.S.C. 112, sixth paragraph: (A) the claim limitation uses the term “means” or “step” or a term used as a substitute for “means” that is a generic placeholder (also called a nonce term or a non-structural term having no specific structural meaning) for performing the claimed function; (B) the term “means” or “step” or the generic placeholder is modified by functional language, typically, but not always linked by the transition word “for” (e.g., “means for”) or another linking word or phrase, such as “configured to” or “so that”; and (C) the term “means” or “step” or the generic placeholder is not modified by sufficient structure, material, or acts for performing the claimed function. Use of the word “means” (or “step”) in a claim with functional language creates a rebuttable presumption that the claim limitation is to be treated in accordance with 35 U.S.C. 112(f) or pre-AIA 35 U.S.C. 112, sixth paragraph. The presumption that the claim limitation is interpreted under 35 U.S.C. 112(f) or pre-AIA 35 U.S.C. 112, sixth paragraph, is rebutted when the claim limitation recites sufficient structure, material, or acts to entirely perform the recited function. Absence of the word “means” (or “step”) in a claim creates a rebuttable presumption that the claim limitation is not to be treated in accordance with 35 U.S.C. 112(f) or pre-AIA 35 U.S.C. 112, sixth paragraph. The presumption that the claim limitation is not interpreted under 35 U.S.C. 112(f) or pre-AIA 35 U.S.C. 112, sixth paragraph, is rebutted when the claim limitation recites function without reciting sufficient structure, material or acts to entirely perform the recited function. Claim limitations in this application that use the word “means” (or “step”) are being interpreted under 35 U.S.C. 112(f) or pre-AIA 35 U.S.C. 112, sixth paragraph, except as otherwise indicated in an Office action. Conversely, claim limitations in this application that do not use the word “means” (or “step”) are not being interpreted under 35 U.S.C. 112(f) or pre-AIA 35 U.S.C. 112, sixth paragraph, except as otherwise indicated in an Office action. This application includes one or more claim limitations that do not use the word “means,” but are nonetheless being interpreted under 35 U.S.C. 112(f) or pre-AIA 35 U.S.C. 112, sixth paragraph, because the claim limitation(s) uses a generic placeholder that is coupled with functional language without reciting sufficient structure to perform the recited function and the generic placeholder is not preceded by a structural modifier. Such claim limitation(s) is/are: “delivery mechanism” and “delivery control mechanism” and “vibration isolator” in claim 1. Because this/these claim limitation(s) is/are being interpreted under 35 U.S.C. 112(f) or pre-AIA 35 U.S.C. 112, sixth paragraph, it/they is/are being interpreted to cover the corresponding structure described in the specification as performing the claimed function, and equivalents thereof. “delivery mechanism” - spec para. 0011 robotic arm, gangway, crane “delivery control mechanism” - spec para. 0012 controller 410 capable of acquiring moment data “vibration isolator” - spec para. 0035, actuator 322 If applicant does not intend to have this/these limitation(s) interpreted under 35 U.S.C. 112(f) or pre-AIA 35 U.S.C. 112, sixth paragraph, applicant may: (1) amend the claim limitation(s) to avoid it/them being interpreted under 35 U.S.C. 112(f) or pre-AIA 35 U.S.C. 112, sixth paragraph (e.g., by reciting sufficient structure to perform the claimed function); or (2) present a sufficient showing that the claim limitation(s) recite(s) sufficient structure to perform the claimed function so as to avoid it/them being interpreted under 35 U.S.C. 112(f) or pre-AIA 35 U.S.C. 112, sixth paragraph. Claim Rejections - 35 USC § 103 The following is a quotation of 35 U.S.C. 103 which forms the basis for all obviousness rejections set forth in this Office action: A patent for a claimed invention may not be obtained, notwithstanding that the claimed invention is not identically disclosed as set forth in section 102, if the differences between the claimed invention and the prior art are such that the claimed invention as a whole would have been obvious before the effective filing date of the claimed invention to a person having ordinary skill in the art to which the claimed invention pertains. Patentability shall not be negated by the manner in which the invention was made. Claims 1, 3 and 5 are rejected under 35 U.S.C. 103 as being unpatentable over Phillips et al. US 2022/0112934 A1 in view of Pivac US 2019/0224846 A1. Phillips teaches: 1. A storage tank delivery system for delivering a storage tank in which predetermined energy is stored, from a floating body that is floating at sea to an energy recovery site at sea or on land, the storage tank delivery system comprising: a delivery mechanism [Fig. 5 504 - articulated robotic arm] including at least one vibration isolator [Fig. 2 actuator 204] with a function of canceling a moment generated by an external force; [para. 0076, “In some examples and as shown in FIG. 2, the controller 202 is coupled to the actuator 204 and configured to produce an actuator control signal (e.g., control output 222) in response to the detected movement error (e.g., movement error detected by movement detector 210). Here, the control output 222 is configured to cause the actuator 204 to move the reaction mass 206 to reduce the movement error of the payload 208.” And para. 0008, “In some examples, the movement error results from at least one of: a force to the payload from an external environment, oscillations to the payload from the external environment, and resonances of the payload.”] and Phillips does not teach the following limitation, however, Pivac teaches: a delivery control mechanism for controlling the vibration isolator of the delivery mechanism [para. 0047, robot arm controller dampens movement of arm based on feedback data from tracker system] so as to acquire moment information [sensors 33, 37 and 41] relating to the moment generated in at least one of the floating body and the energy recovery site [Figs. 9-11 and para. 0110, “Ship to ship, or ship to oil rig, or ship to gas rig, or ship to wind turbine, transfer of goods, liquids or personnel, is a potential application for the control system of the invention.”] and to deliver the storage tank while canceling the moment [para. 0065, “FIG. 9 is a side view showing use of a boom with a robotic arm mounted to a floating facility, in use to transfer items from a vessel subject to movement in ocean swell;”] It would have been obvious to a person having ordinary skill in the art before the time of filing to combine the teachings of Pivac with those of Phillips. A person having ordinary skill in the art would have been motivated to combine the teachings because Pivac teaches that a feedback control system for external movement between two floating vessels can be used for ship to ship transfer of goods. (See para. 0101). Pivac teaches: 3. The storage tank delivery system according to claim 1, wherein the energy recovery site is a recovery vessel, and the delivery control mechanism controls the vibration isolator such that the moment is cancelled by acquiring the moment information for each of the floating body and the recovery vessel. [para. 0110-0112; vessel to vessel in rough weather] Pivac teaches: 5. The storage tank delivery system according to claim 1, wherein the delivery mechanism includes a robot arm with a plurality of joints [robotic arm 25], and the vibration isolator is provided in at least one of the joints. [para. 0077, robot arm actuator controlled with fast dynamic response] Claim 2 is rejected under 35 U.S.C. 103 as being unpatentable over Phillips et al. US 2022/0112934 A1 in view of Pivac US 2019/0224846 A1 and further in view of Kingsley US 2018/0320277 A1. The combination of Phillips and Pivac does not teach the following limitation, however, Kingsley teaches: 2. The storage tank delivery system according to claim 1, wherein the floating body is a non-moored power generation floating body , to which a kite [Fig. 7 718 wind capture kite aerostat attached to power generator system 400] used for power generation is attached, the floating body including a kite recovery mechanism[Fig. 7 700 710 Tether in retrieval model uses motor 704 to withdraw the kite] that stows the kite away at a time of delivery of the storage tank. It would have been obvious to a person having ordinary skill in the art before the time of filing to combine the teachings of Kingsley with those of Phillips and Pivac. A person having ordinary skill in the art would have been motivated to combine the teachings because Kingsley teaches that wind capture kites can be tethered to power generators for example hydrogen producing to create “green” hydrogen without need to be grid connected. (See para. 0011). Claim 4 is rejected under 35 U.S.C. 103 as being unpatentable over Phillips et al. US 2022/0112934 A1 in view of Pivac US 2019/0224846 A1 and further in view of KIM et al. US 2019/0022853 A1. The combination of Phillips and Pivac does not teach the following limitation, however, KIM teaches: 4. The storage tank delivery system according to claim 1, wherein the delivery control mechanism cancels the moment taking into consideration a change in weight of the storage tank accompanying the delivery between the floating body and the energy recovery site. [para. 0032-0033, “According to the example embodiments of the present invention, a compensation torque may be properly changed according to a change of the pay load of the robot which is a weight gripped by the robot, and the proper compensation torque may be generated for the pay load. [0033] In addition, even though the weight of the robot arm is changed or the distance between the joint of the robot arm and the weight center is changed, the proper compensation torque may be generated.”] It would have been obvious to a person having ordinary skill in the art before the time of filing to combine the teachings of KIM with those of Phillips and Pivac. A person having ordinary skill in the art would have been motivated to combine the teachings because KIM teaches that a change in pay load from the weight gripped by the robot can be used to properly compensate torque and zero the moment. (See para. 0072-0074). Conclusion The prior art made of record and not relied upon is considered pertinent to applicant's disclosure. Kupersmith US 2011/0174206 A1 - large ocean platform with controls for attenuating wave forces. Calculates polar moment. Blumenthal US 2011/0281478 A1 - high altitude kite used for hydrogen generation system derived from ocean water. Generated electricity is either used for ship propulsion or electrolysis and stored. Bergem et al. US 2016/0039644 A1 - crane device with adjustable dampening to operate above and below water line. Automatically corrects for changes in weight of the load. Soundararajan et al. US 2018/0303566 A1 - robotic system for surgery, teaches techniques for dampening vibration. Sheldon-Coulson et al. US 2021/0354791 A1 - system for converting energy from ocean waves into hydrogen. Hydrogen transferred to transport ship via hose. Podhola US 2024/0034443 A1 - off shore charging station, part of hydrogen powering system in a buoyant container. ITO US 2024/0217628 A1 - transport system for energy by ship. Uses robotic arm for connection to off shore collection device. Zhang US 2025/0051152 A1 - robotic arm with controls for shock and vibration isolators. MEDLAND et al. US 2025/0178712 A1 - maritime vessel for generating, storing and transporting energy. Harvests fuel from deep ocean. Also uses a sea kite. Any inquiry concerning this communication or earlier communications from the examiner should be directed to GARY COLLINS whose telephone number is (571)270-0473. The examiner can normally be reached Monday - Friday 1-930PM EST. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Kamini Shah can be reached at (571) 272-2279. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /GARY COLLINS/Primary Examiner, Art Unit 2115
Read full office action

Prosecution Timeline

Dec 27, 2024
Application Filed
Oct 20, 2026
Non-Final Rejection mailed — §103 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12801124
Industrial Bottleneck Detection and Management Method and System
3y 2m to grant Granted Nov 17, 2026
Patent 12762315
IDENTIFYING POTENTIAL IMPROVEMENT OPPORTUNITIES FOR SIMULATION PERFORMANCE OF AN INTEGRATED CIRCUIT DESIGN
4y 10m to grant Granted Oct 13, 2026
Patent 12743067
Method and System for Providing Data for at least one Data Receiver
5y 3m to grant Granted Sep 22, 2026
Patent 12716625
REFRIGERATION CYCLE APPARATUS AND OPTIMIZATION METHOD
2y 5m to grant Granted Aug 25, 2026
Patent 12699821
Learning Optimization Constraints Through Knowledge Based Data Generation
4y 6m to grant Granted Aug 04, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

1-2
Expected OA Rounds
28%
Grant Probability
44%
With Interview (+16.1%)
3y 8m (~1y 10m remaining)
Median Time to Grant
Low
PTA Risk
Based on 89 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month