DETAILED ACTION
Notice of Pre-AIA or AIA Status
The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA .
Priority
Receipt is acknowledged of certified copies of papers required by 37 CFR 1.55.
Claim Objections
Claims 6 are objected to because of the following informalities: C
Appropriate correction is required.
Claim 9 and 18 are objected to because of the following informalities: T
Appropriate correction is required.
Claim Rejections - 35 USC § 101
35 U.S.C. 101 reads as follows:
Whoever invents or discovers any new and useful process, machine, manufacture, or composition of matter, or any new and useful improvement thereof, may obtain a patent therefor, subject to the conditions and requirements of this title.
Claims 1-9 and 10-18 are rejected under 35 U.S.C. 101 because the claimed invention is directed to an abstract idea without significantly more. Below is an analysis in accordance with the Subject Matter Eligibility Test for Products and Process found in MPEP 2106(III).
Claim 1: A detection method for a cooling system comprising:
(a) detecting first flow rate difference information of the cooling system of a server device through a flow rate detection device, the first flow rate difference information indicating a difference between an inlet flow rate and an outlet flow rate of the cooling system; and
(b) determining status information of the cooling system according to the first flow rate difference information, the status information indicating whether the cooling system has a coolant leakage.
STEP 1:
The claim recites a method. A method is a process. Thus, the claim is to a statutory category of invention.
STEP 2A PRONG ONE:
Limitation (a) in claim 1 recites detecting first flow rate difference information of the cooling system of a server device through a flow rate detection device, the first flow rate difference information indicating a difference between an inlet flow rate and an outlet flow rate of the cooling system; and
Limitation (b) in claim 1 recites determining status information of the cooling system according to the first flow rate difference information, the status information indicating whether the cooling system has a coolant leakage.
As is evident from applicant’s disclosure, the claimed steps (a) and (b) fall into the “Mental Processes” group of abstract ideas because the recited steps are evaluations (detecting first flow rate difference in step (a)) and calculations (determining status information in step (b)) that are simple enough that they can be practically performed in the human mind. Note that even if most humans would use a physical aid to help them complete the recited calculation or observation, the use of such physical aid does not negate the mental nature of these limitations because the claim here merely uses general purpose computer as a tool to perform the otherwise mental process.
STEP 2A PRONG TWO:
Besides the abstract idea, the claim recites no additional elements.
Step 2B:
The claim as a whole does not amount to significantly more than the recited exception. Therefore, the claim is not eligible.
Claims 2-9 are merely just extensions or variations of the judicial exception, generally linking the use of the judicial exception to the technological environment, or insignificant extra-solution activity.
Regarding claim 10,
STEP 2A PRONG TWO:
The judicial exception is not integrated into a practical application. In particular, the claim recites additional elements of “a controller” and “a first and second sensor”.
The “controller” is recited at a high-level of generality such that they amount to no more than mere instructions to apply the exception using a generic component (MPEP 2106.05(f)).
The “a first and second sensors” amount to extra-solution activity of receiving data (MPEP 2106.05(g): i.e. pre-solution activity of gathering data for use in the claimed process.
Step 2B:
The claim does not include additional elements that are sufficient to amount to significantly more than the judicial exception. As discussed above with respect to the integration of the abstract idea into a practical application, the additional elements of “a controller” is recited at a high-level of generality such that they amount to no more than mere instructions to apply the exception using a generic component (MPEP 2106.05(f)).
The limitation of “a first and second sensor” amount to extra-solution activity of receiving data (MPEP 2106.05(g): i.e. pre-solution activity of gathering data for use in the claimed process.
Thus, when taken alone, the individual elements do not amount to significantly more than the above-identified judicial exception (the abstract idea). Looking at the limitations as an ordered combination adds nothing that is not already present when looking at the elements taken individually. There is no indication that the combination of elements improves the functioning of a computer or improves any other technology. Therefore, the claim is not eligible.
Claims 11-18 are merely just extensions or variations of the judicial exception, generally linking the use of the judicial exception to the technological environment, or insignificant extra-solution activity.
Claim Rejections - 35 USC § 102
In the event the determination of the status of the application as subject to AIA 35 U.S.C. 102 and 103 (or as subject to pre-AIA 35 U.S.C. 102 and 103) is incorrect, any correction of the statutory basis (i.e., changing from AIA to pre-AIA ) for the rejection will not be considered a new ground of rejection if the prior art relied upon, and the rationale supporting the rejection, would be the same under either status.
The following is a quotation of the appropriate paragraphs of 35 U.S.C. 102 that form the basis for the rejections under this section made in this Office action:
A person shall be entitled to a patent unless –
(a)(1) the claimed invention was patented, described in a printed publication, or in public use, on sale, or otherwise available to the public before the effective filing date of the claimed invention.
(a)(2) the claimed invention was described in a patent issued under section 151, or in an application for patent published or deemed published under section 122(b), in which the patent or application, as the case may be, names another inventor and was effectively filed before the effective filing date of the claimed invention.
Claims 1-5 and 9 is/are rejected under 35 U.S.C. 102(a)(1) as being anticipated by JIN CN 115778532 A 2023-03-14.
Regarding claim 1, A detection method for a cooling system comprising:
detecting first flow rate difference information of the cooling system of a server device through a flow rate detection device, the first flow rate difference information indicating a difference between an inlet flow rate and an outlet flow rate of the cooling system (JIN ¶n0006-7, 45 discloses an inlet and an outlet pipe which have a detection device to determine a flow rate of the inlet and outlet, it then compares them to determine a difference, either a leak or a blockage based on the changing trend of the flow rates.); and
determining status information of the cooling system according to the first flow rate difference information, the status information indicating whether the cooling system has a coolant leakage (JIN ¶n0007, 49 discloses “determining the degree and/or location of a leak and/or blockage in the cooling system based on the changing trend of the first flow rate and/or the second flow rate in response to a change in the first flow rate and/or the second flow rate.”).
Regarding claim 2, JIN further discloses wherein determining the status information of the cooling system according to the first flow rate difference information includes at least one of:
in response to the first flow rate difference information being smaller than a first threshold, determining the status information of the cooling system as first status information, the first status information indicating that the cooling system has no coolant leakage ( JIN ¶n0009, 50 discloses “In some other embodiments, the monitoring unit is used to determine the flow state of the coolant in the cooling system by: determining that the flow state in the cooling system is normal in response to the first flow rate, the second flow rate, and the preset flow rate being equal;” Normal is being read as no leak was detected); or
in response to the first flow rate difference information being greater than or equal to the first threshold for a predetermined time length, determining the status information of the cooling system as second status information, the second status information indicating that the cooling system has the coolant leakage (JIN ¶50 discloses looking at the current state over a certain period of time, (a predetermined time length), “Specifically, when the coolant in the cooling system flows normally, the first flow rate and the second flow rate should be in a relatively stable state (i.e., do not change significantly over a certain period of time) and should be basically equal (i.e., without considering errors).” ¶n0009, 51 discloses when there IS significant change over time determine there is a leak, “Furthermore, when the first flow rate and/or the second flow rate obtained by the monitoring unit 230 change, it indicates that the flow state of the coolant in the cooling system is unstable…determining that there is a leak in the cooling system in response to the first flow rate being greater than the second flow rate in a stable state.”).
Regarding claim 3 , JIN further discloses wherein in response to the first flow rate difference information being greater than or equal to the first threshold for the predetermined time length, determining the status information of the cooling system as the second status information includes at least one of:
in response to the first flow rate difference information being greater than or equal to the first threshold for a first predetermined time length (a certain period of time), determining the status information of the cooling system as the second status information (determining the system has a leak), the second status information indicating that the cooling system has the coolant leakage (JIN ¶50 discloses looking at the current state over a certain period of time, (a predetermined time length), “Specifically, when the coolant in the cooling system flows normally, the first flow rate and the second flow rate should be in a relatively stable state (i.e., do not change significantly over a certain period of time) and should be basically equal (i.e., without considering errors).” ¶n0012, 52 further disclose “determining a leak between the main fluid supply device and the main power device in response to the first flow rate having an upward trend; and determining a severe leak at the main power device in response to the second flow rate decreasing to a second flow rate threshold and the first flow rate having a downward trend.”); or
in response to a count of the first flow rate difference information being greater than or equal to the first threshold detected within a second predetermined time length achieving a first count threshold, determining the status information of the cooling system as the second status information, the second predetermined time length being greater than the first predetermined time length.
Regarding claim 4, JIN further discloses further comprising, in response to determining the status information of the cooling system as the second status information:
controlling the server device to power off; or
issuing a coolant leakage warning to the maintenance personnel of the server device (JIN ¶n0048 discloses “In some other embodiments, the monitoring unit 230 may also include, for example, a human-machine interface device, a display, an alarm, etc., which can be used to display monitoring results to the operator, such as information on the current flow status of the coolant in the cooling system, and can also issue audible or visible alarm signals in a timely manner when it is determined that there may be a fault risk in the cooling system, so as to prompt the operator to perform relevant operations.”).
Regarding claim 5, JIN further discloses wherein determining the status information of the cooling system according to the first flow rate difference information further includes:
in response to detecting that the first flow rate difference information is greater than or equal to a second threshold (second flow rate threshold), determining the status information of the cooling system as the second status information (determine a severe leak), the second threshold being greater than the first threshold. (JIN ¶n0012, 52 discloses “determining a severe leak at the main power device in response to the second flow rate decreasing to a second flow rate threshold and the first flow rate having a downward trend.”);
Regarding claim 9 JIN further discloses in response to at least one of the outlet flow rate or the inlet flow rate of the cooling system being smaller than a fourth threshold (decrease of the first flow rate, or zeroing of the first flow), outputting the third status prompt (blockage or severe blockage) information, the third status prompt information indicating that the cooling system has a blockage risk (JIN discloses the first flow rate decreasing or stopping all together and determining that there is a blockage, ¶n0054 “Furthermore, the monitoring unit 230 can also determine the location of leaks and/or blockages based on the changing trends of the first flow rate and/or the second flow rate. For example, in response to the rate of decrease of the first flow rate within a first speed range, it can be determined that there is a slight blockage at the cooling conduit; in response to the rate of zeroing of the first flow rate within a second speed range, it can be determined that there is a severe blockage at the cooling conduit;”).
Claim Rejections - 35 USC § 103
In the event the determination of the status of the application as subject to AIA 35 U.S.C. 102 and 103 (or as subject to pre-AIA 35 U.S.C. 102 and 103) is incorrect, any correction of the statutory basis (i.e., changing from AIA to pre-AIA ) for the rejection will not be considered a new ground of rejection if the prior art relied upon, and the rationale supporting the rejection, would be the same under either status.
The following is a quotation of 35 U.S.C. 103 which forms the basis for all obviousness rejections set forth in this Office action:
A patent for a claimed invention may not be obtained, notwithstanding that the claimed invention is not identically disclosed as set forth in section 102, if the differences between the claimed invention and the prior art are such that the claimed invention as a whole would have been obvious before the effective filing date of the claimed invention to a person having ordinary skill in the art to which the claimed invention pertains. Patentability shall not be negated by the manner in which the invention was made.
The factual inquiries for establishing a background for determining obviousness under 35 U.S.C. 103 are summarized as follows:
1. Determining the scope and contents of the prior art.
2. Ascertaining the differences between the prior art and the claims at issue.
3. Resolving the level of ordinary skill in the pertinent art.
4. Considering objective evidence present in the application indicating obviousness or nonobviousness.
Claims 8, 10-14, 17-18 is/are rejected under 35 U.S.C. 103 as being unpatentable over JIN CN 115778532 A 2023-03-14 in view of GUTSMANN US 20220232815 A1 2022-07-28.
Regarding claim 10, JIN discloses a detection device for a cooling system comprising: a first sensor arranged at an inlet of the cooling system and configured to obtain flow rate pulse data for a liquid of the cooling system based on a rotor flow meter (¶46 “In some embodiments, the first flow detection device 210 may be one or more of the following: thermal flow meter, mechanical flow meter, mass flow meter, rotor flow meter, orifice plate flow meter, etc.” ¶45 “The first flow detection device 210 may be arranged at the main liquid supply device in the cooling system shown in Figure 1, for example, to detect the first flow rate of the coolant flowing out of the main liquid supply device.”);
a second sensor arranged at an outlet of the cooling system and configured to obtain flow rate pulse data for the liquid of the cooling system based on a rotor flow meter (¶46 “In some embodiments, the second flow detection device 220 may be one or more of the following: thermal flow meter, mechanical flow meter, mass flow meter, rotor flow meter, orifice plate flow meter, etc.”, ¶ 45 “The second flow detection device 220 may be arranged on the second cooling pipe in the cooling system shown in Figure 1, for example, to detect the second flow rate of the coolant in the second cooling pipe.”); and
a controller configured to (¶48 In other embodiments, the monitoring unit 230 may include a processor, a memory, etc., for storing and processing received data such as the first traffic flow and the second traffic flow to obtain monitoring results.): detect first flow rate difference information of the cooling system of a server device through the first sensor and the second sensor, the first flow rate difference information indicating a difference between an inlet flow rate and an outlet flow rate of the cooling system (JIN ¶n0006-7, 49 disclose an inlet and an outlet pipe which have a detection device to determine a flow rate of the inlet and outlet, it then compares them to determine a difference, either a leak or a blockage based on the changing trend of the flow rates.); and
determine status information of the cooling system according to the first flow rate difference information, the status information indicating whether the cooling system has a coolant leakage (JIN ¶n0007, 49 discloses “determining the degree and/or location of a leak and/or blockage in the cooling system based on the changing trend of the first flow rate and/or the second flow rate in response to a change in the first flow rate and/or the second flow rate.”).
JIN does not disclose expressly a Hall sensor or a pulse count.
GUTSMANN discloses ¶55 “In some embodiments, an impeller sensor is used to measure the flow. The measuring principle is based on the fact that an impeller assumes a rotational speed in proportion to the flow rate of a fluid by which the impeller is driven. To measure the speed, a permanent magnet can be attached to the impeller, which magnet moves with the impeller. A Hall sensor past which the permanent magnet moves can be used as a pulse counter. The number of pulses measured per unit time is proportional to the rotational speed of the impeller and therefore to the flow rate of the fluid.”
JIN and GUTSMANN are analogous art because they are from a similar problem-solving area of detecting a flow rate in a fluid system.
At the time of the invention, it would have been prima facie obvious to one of ordinary skill, in the art as of the effective filing date, to adapt the Hall Sensors and pulse counts of GUTSMANN with the rotor flow meter of JIN to determine the signal and frequency of the fluid flow rate.
The suggestion/motivation for doing so would have been excessively large flow or lack there of can lead to inconsistency and or damage, there is a need to control the flow in fluid systems (GUTSMANN ¶4 “This can result in too little or too much spray composition being applied. An excessively small application rate can cause the spray composition to be ineffective. An excessively large quantity can result in unnecessary costs or even damage.”).
Therefore, it would have been prima facie obvious to one of ordinary skill, in the art as of the effective filing date, to combine JIN and GUTSMANN for the benefit of Hall sensors to determine a pulse signal and a frequency to obtain the invention as specified in the claim 10.
Regarding claim 11, JIN in view of GUTSMANN further discloses wherein determining the status information of the cooling system according to the first flow rate difference information includes at least one of:
in response to the first flow rate difference information being smaller than a first threshold, determining the status information of the cooling system as first status information, the first status information indicating that the cooling system has no coolant leakage ( JIN ¶n0009, 50 discloses “In some other embodiments, the monitoring unit is used to determine the flow state of the coolant in the cooling system by: determining that the flow state in the cooling system is normal in response to the first flow rate, the second flow rate, and the preset flow rate being equal;” Normal is being read as no leak was detected); or
in response to the first flow rate difference information being greater than or equal to the first threshold for a predetermined time length, determining the status information of the cooling system as second status information, the second status information indicating that the cooling system has the coolant leakage (JIN ¶50 discloses looking at the current state over a certain period of time, (a predetermined time length), “Specifically, when the coolant in the cooling system flows normally, the first flow rate and the second flow rate should be in a relatively stable state (i.e., do not change significantly over a certain period of time) and should be basically equal (i.e., without considering errors).” ¶n0009, 51 discloses when there IS significant change over time determine there is a leak, “Furthermore, when the first flow rate and/or the second flow rate obtained by the monitoring unit 230 change, it indicates that the flow state of the coolant in the cooling system is unstable…determining that there is a leak in the cooling system in response to the first flow rate being greater than the second flow rate in a stable state.”).
Regarding claim 12, JIN in view of GUTSMANN further discloses wherein in response to the first flow rate difference information being greater than or equal to the first threshold for the predetermined time length, determining the status information of the cooling system as the second status information includes at least one of:
in response to the first flow rate difference information being greater than or equal to the first threshold for a first predetermined time length (a certain period of time), determining the status information of the cooling system as the second status information (determining the system has a leak), the second status information indicating that the cooling system has the coolant leakage (JIN ¶50 discloses looking at the current state over a certain period of time, (a predetermined time length), “Specifically, when the coolant in the cooling system flows normally, the first flow rate and the second flow rate should be in a relatively stable state (i.e., do not change significantly over a certain period of time) and should be basically equal (i.e., without considering errors).” ¶n0012, 52 further disclose “determining a leak between the main fluid supply device and the main power device in response to the first flow rate having an upward trend; and determining a severe leak at the main power device in response to the second flow rate decreasing to a second flow rate threshold and the first flow rate having a downward trend.”); or
in response to a count of the first flow rate difference information being greater than or equal to the first threshold detected within a second predetermined time length achieving a first count threshold, determining the status information of the cooling system as the second status information, the second predetermined time length being greater than the first predetermined time length.
Regarding claim 13, JIN in view of GUTSMANN further discloses comprising, in response to determining the status information of the cooling system as the second status information:
controlling the server device to power off; or
issuing a coolant leakage warning to the maintenance personnel of the server device (JIN ¶n0048 discloses “In some other embodiments, the monitoring unit 230 may also include, for example, a human-machine interface device, a display, an alarm, etc., which can be used to display monitoring results to the operator, such as information on the current flow status of the coolant in the cooling system, and can also issue audible or visible alarm signals in a timely manner when it is determined that there may be a fault risk in the cooling system, so as to prompt the operator to perform relevant operations.”).
Regarding claim 14, JIN in view of GUTSMANN further discloses wherein determining the status information of the cooling system according to the first flow rate difference information further includes:
in response to detecting that the first flow rate difference information is greater than or equal to a second threshold (second flow rate threshold), determining the status information of the cooling system as the second status information (determine a severe leak), the second threshold being greater than the first threshold. (JIN ¶n0012, 52 discloses “determining a severe leak at the main power device in response to the second flow rate decreasing to a second flow rate threshold and the first flow rate having a downward trend.”);
Regarding claims 8 and 17 JIN in view of GUTSMANN further discloses, wherein detecting the first flow rate difference information of the cooling system of the server device includes:
obtaining a first flow rate signal of a first sensor and a second flow rate signal of a second sensor, the first sensor being arranged at an inlet of the cooling system of the server device, and the second sensor being arranged at an outlet of the cooling system (JIN in view of GUTSMANN disclose obtaining the signal from a first flow rate and second flow rate being located at the inlet and outlet of a cooling system, JIN ¶45-46, 48-49 the inlet and outlet being monitored, GUTSMANN discloses ¶55 producing a signal in the form of a pulse counter measured over time. );
determining the first flow rate difference information of the cooling system according to a frequency of the first flow rate signal and a frequency of the second flow rate signal (JIN in view of GUTSMANN disclose a count of the number of pulses over time (a frequency) based on the flow rate and determining a difference using the data, JIN ¶49 for the difference in the flows, and GUTSMANN discloses ¶55 a number of pulses over time, (a frequency)).
Regarding claim 18, JIN in view of GUTSMANN further discloses in response to at least one of the outlet flow rate or the inlet flow rate of the cooling system being smaller than a fourth threshold (decrease of the first flow rate, or zeroing of the first flow), outputting the third status prompt (blockage or severe blockage) information, the third status prompt information indicating that the cooling system has a blockage risk (JIN discloses the first flow rate decreasing or stopping all together and determining that there is a blockage, ¶n0054 “Furthermore, the monitoring unit 230 can also determine the location of leaks and/or blockages based on the changing trends of the first flow rate and/or the second flow rate. For example, in response to the rate of decrease of the first flow rate within a first speed range, it can be determined that there is a slight blockage at the cooling conduit; in response to the rate of zeroing of the first flow rate within a second speed range, it can be determined that there is a severe blockage at the cooling conduit;”).
Allowable Subject Matter
Claims 6, 7, 15 and 16 are objected to as not being dependent on the correct claim. The limitations of claims 6 and 15 require the limitations of 1, 2 and 3, and 10, 11, 12 to have proper antecedent basis. Fixing these problems would place these claims in an allowable state.
Any comments considered necessary by applicant must be submitted no later than the payment of the issue fee and, to avoid processing delays, should preferably accompany the issue fee. Such submissions should be clearly labeled “Comments on Statement of Reasons for Allowance.”
Conclusion
Any inquiry concerning this communication or earlier communications from the examiner should be directed to CONNOR D COUSINEAU whose telephone number is (571)447-9620. The examiner can normally be reached Monday-Friday 8am-5pm.
Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice.
If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Kamini Shah can be reached at (571) 272-2279. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300.
Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000.
/C.D.C./Examiner, Art Unit 2115
/PAUL B YANCHUS III/ Primary Examiner, Art Unit 2115 October 16, 2026