Prosecution Insights
Last updated: October 25, 2026
Application No. 19/033,724

SUBMARINE POWER CABLE SYSTEM WITH MOISTURE BUFFER ZONE

Non-Final OA §103
Filed
Jan 22, 2025
Priority
Feb 02, 2024 — EU 24155516.8
Examiner
MAYO III, WILLIAM H
Art Unit
2848
Tech Center
2800 — Semiconductors & Electrical Systems
Assignee
Nkt Hv Cables AB
OA Round
1 (Non-Final)
77%
Grant Probability
Favorable
1-2
OA Rounds
4m
Est. Remaining
73%
With Interview

Examiner Intelligence

Grants 77% — above average
77%
Career Allowance Rate
1000 granted / 1299 resolved
+9.0% vs TC avg
Minimal -4% lift
Without
With
+-3.9%
Interview Lift
resolved cases with interview
Fast prosecutor
2y 2m
Avg Prosecution
37 currently pending
Career history
1360
Total Applications
across all art units

Statute-Specific Performance

§101
0.2%
-39.8% vs TC avg
§103
54.1%
+14.1% vs TC avg
§102
33.0%
-7.0% vs TC avg
§112
5.0%
-35.0% vs TC avg
Black line = Tech Center average estimate • Based on career data from 1299 resolved cases

Office Action

§103
DETAILED ACTION Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . Priority Acknowledgment is made of applicant's claim for foreign priority under 35 U.S.C. 119(a)-(d). The certified copy has been filed in present Application No. 19/033,724, filed on January 22, 2025. Information Disclosure Statement The information disclosure statement filed January 22, 2025 has been submitted for consideration by the Office. It has been placed in the application file and the information referred to therein has been considered. Drawings The drawings objected to because Figures 2-3 lacks the proper cross-hatching which indicates the type of materials, which may be in an invention. Specifically, the cross hatching to indicate the conductor and insulative materials is improper. The applicant should refer to MPEP Section 608.02 for the proper cross-hatching of materials. Correction is required. In addition to Replacement Sheets containing the corrected drawing figure(s), applicant is required to submit a marked-up copy of each Replacement Sheet including annotations indicating the changes made to the previous version. The marked-up copy must be clearly labeled as “Annotated Sheets” and must be presented in the amendment or remarks section that explains the change(s) to the drawings. See 37 CFR 1.121(d)(1). Failure to timely submit the proposed drawing and marked-up copy will result in the abandonment of the application. Specification Applicant is reminded of the proper language and format for an abstract of the disclosure. The abstract should be in narrative form and generally limited to a single paragraph on a separate sheet within the range of 50 to 150 words. It is important that the abstract not exceed 150 words in length since the space provided for the abstract on the computer tape used by the printer is limited. The form and legal phraseology often used in patent claims, such as "means" and "said," should be avoided. The abstract should describe the disclosure sufficiently to assist readers in deciding whether there is a need for consulting the full patent text for details. The language should be clear and concise and should not repeat information given in the title. It should avoid using phrases which can be implied, such as, "The disclosure concerns," "The disclosure defined by this invention," "The disclosure describes," etc. Extensive mechanical and design details of apparatus should not be given. The abstract of the disclosure is objected to because in lines 1-15, the abstract contains a number of run on sentences, which is improper language for the abstract. The applicant should correct all instances of run on sentences, to provide the abstract with proper language. Correction is required. See MPEP § 608.01(b). Claim Rejections - 35 USC § 103 In the event the determination of the status of the application as subject to AIA 35 U.S.C. 102 and 103 (or as subject to pre-AIA 35 U.S.C. 102 and 103) is incorrect, any correction of the statutory basis (i.e., changing from AIA to pre-AIA ) for the rejection will not be considered a new ground of rejection if the prior art relied upon, and the rationale supporting the rejection, would be the same under either status. The following is a quotation of 35 U.S.C. 103 which forms the basis for all obviousness rejections set forth in this Office action: A patent for a claimed invention may not be obtained, notwithstanding that the claimed invention is not identically disclosed as set forth in section 102, if the differences between the claimed invention and the prior art are such that the claimed invention as a whole would have been obvious before the effective filing date of the claimed invention to a person having ordinary skill in the art to which the claimed invention pertains. Patentability shall not be negated by the manner in which the invention was made. The factual inquiries for establishing a background for determining obviousness under 35 U.S.C. 103 are summarized as follows: 1. Determining the scope and contents of the prior art. 2. Ascertaining the differences between the prior art and the claims at issue. 3. Resolving the level of ordinary skill in the pertinent art. 4. Considering objective evidence present in the application indicating obviousness or nonobviousness. This application currently names joint inventors. In considering patentability of the claims the examiner presumes that the subject matter of the various claims was commonly owned as of the effective filing date of the claimed invention(s) absent any evidence to the contrary. Applicant is advised of the obligation under 37 CFR 1.56 to point out the inventor and effective filing dates of each claim that was not commonly owned as of the effective filing date of the later invention in order for the examiner to consider the applicability of 35 U.S.C. 102(b)(2)(C) for any potential 35 U.S.C. 102(a)(2) prior art against the later invention. Claim(s) 1-7, 11, and 14-19 are rejected under 35 U.S.C. 103 as being unpatentable over Manabe et al (Pat Num 9,722,406, herein referred to as Manabe) in view of Nielsen, Jr et al (Pat Num 9,721,696, herein referred to as Nielsen). Manabe discloses a submarine power cable (Figs 1-6B) that has both sufficient flexibility and high impermeability (Col 2, lines 1-5). With respect to claim 1, Manabe discloses a submarine power cable system (Figs 1-2) comprising a wet design power cable section (3, Fig 2) having a first conductor section (15 of 3), a first insulation system section (17 of 3) arranged around the first conductor section (17 of 3), and a screen layer (19 of 3) formed by one or more of helically laid elongated metal elements (Col 6, lines 36-38) and arranged around the first insulation system section (17 of 3), and a static power cable section (7, Fig 3), which is a moisture buffer zone (Col 5, lines 19-24), including a second conductor section (15 of 7) connected to the first conductor section (15 of 7, Col 5, lines 7-13) and a second insulation system section (17 of 7) connected to the first insulation system section (17 of 3) by means of a flexible joint (5b), wherein the static power cable section (7) further comprising a metallic radial water-blocking sheath (21a of 7) arranged around the second insulation system section (17 of 7), wherein the metallic radial water-blocking sheath (17 of 7) is electrically connected to the screen layer (19 of 7, Col 7, lines 49-53), and wherein, from the flexible joint (5b) to a far end of the static power cable section (7), wherein the far end being arranged to be connected to a subsea electric component (1, via second 3). With respect to claim 3, Manabe discloses that the wet design power cable section (3) is a dynamic submarine power cable section (i.e. flexible section, Col 5, lines 25-33). With respect to claim 4, Manabe discloses that the wet design power cable section (3) has a static power cable section (located at 5b). With respect to claim 5, Manabe discloses that the metallic radial water-blocking sheath (21a of 7) is an extruded metal sheath (Col 7, lines 50-53). With respect to claim 6, Manabe discloses that the subsea electric component (1), wherein the far end of the static power cable section (located at the end of 7) is connected to the subsea electric component (via second 3, Fig 1). With respect to claim 7, Manabe discloses that the static power cable section (7) is a first static power cable section (located at first 7), wherein the submarine power cable system (Fig 1) comprises a second static power cable section (located at second 7, not shown), wherein the subsea electric component (1) is a rigid sea joint (5b), and wherein the first static power cable section (located at first 7) is joined with the second static power cable section (located at second 7) by means of the rigid sea joint (5b via second 3). With respect to claim 11, Manabe disclose that the subsea electric component (1) is a subsea transformer module (i.e. wind power generators, Col 5, lines 1-6). With respect to claim 14, Manabe discloses that the wet design power cable section (first 3) is free of any helically laid elongated metal element(s) radially outside the first conductor section (15 of 3) other than that/those forming the screen layer (19), and, if present, those of an armor (23a & 23b, Fig 2), and free of a metallic radial water-blocking sheath (i.e. 24 could be omitted, Col 7, lines 26-28). With respect to claim 16, Manabe discloses that the wet design power cable section (3) is a dynamic submarine power cable section (i.e. flexible section, Col 5, lines 25-33). With respect to claim 17, Manabe discloses that the wet design power cable section (3) has a static power cable section (located at 5b). With respect to claim 18, Manabe discloses that the metallic radial water-blocking sheath (21a of 7) is an extruded metal sheath (Col 7, lines 50-53). With respect to claim 19, Manabe discloses that the subsea electric component (1), wherein the far end of the static power cable section (located at the end of 7) is connected to the subsea electric component (via second 3, Fig 1). Manabe doesn’t necessarily disclose the submarine power cable system having an axial length in a range of 1-1000 m (claim 1), nor the axial length is in the range of 1-500 m, or 1-400 mm, or 1-200 m, or 1-100 m, or 1-50 m, Or 1-10 m, or 5-500 m, or 5-400 mm, or 5-200 m, or 5-100 m, or 5- 50 m, or 5-10 m (claim 2), nor the submarine power cable system is a multi-phase AC power cable system (claim 15). Nielsen teaches a submarine power cable (Figs 1-5) having improved mechanical strength, while also saving costs and reducing risk of harm to people and the environment (Col 5, lines 19-21). Specifically, with respect to claims 1-2, Nielson teaches submarine power cable system (Figs 3-4), wherein the submarine power cable (10, Fig 2) comprising a first conductor section (2), a first insulation system section (3-5) arranged around the first conductor section (2), and a screen layer (12) arranged around the first insulation system section (3-5), wherein the length of the submarine power cable (210, shown in Fig 4) may have an axial length of 100-2000 ft (i.e. 30-609 m, which incorporates some of the claimed ranges, Col 5, lines 53-68). It would have been obvious to one having ordinary skill in the art of cables at the time the invention was made to modify the submarine cable system of Manabe to comprise the axial length configuration as taught by Nielsen because Nielsen teaches that such a configuration provides a submarine power cable (Figs 1-5) having improved mechanical strength, while also saving costs and reducing risk of harm to people and the environment (Col 5, lines 19-21) and since it has been held that where the general conditions of a claim are disclosed in the prior art, discovering the optimum or workable ranges involves only routine skill in the art. In re Aller, 105 USPQ 233. Claim(s) 8-10 are rejected under 35 U.S.C. 103 as being unpatentable over Manabe et al (Pat Num 9,722,406) in view of Nielsen (Pat Num 9,721,696), as applied to claims 1, 6, & 7 above (herein referred to as modified Manabe), further in view of Ghorbani et al (Pub Num 2018,0190409, herein referred to as Ghorbani). Modified Manabe discloses a submarine power cable (Figs 1-6B) that has both sufficient flexibility and high impermeability (Col 2, lines 1-5). Specifically, with respect to claim 8, Manabe discloses that the second static power cable section (located at second 7) comprises a third conductor section (15 of third 7) connected to the second conductor section (15 of second 7), and a third insulation system section (17 of third 7) arranged around the third conductor section (17 of third 7), wherein the second static power cable section (located second 7), and a metallic radial water-blocking sheath (21a) arranged around the third insulation section (17 of third). With respect to claim 9-10, modified Manabe discloses that the second static power cable section (located at second 7) is an order of one longer than the first static power cable section (located at 7, i.e. the first and second static power cable sections are equal). However, modified Manabe doesn’t necessarily disclose a water swellable layer being between the third insulation section and the metal radial water blocking sheath (claim 8), nor the second static power cable section being longer than the first static power cable section (claim 9). Ghorbani teaches a submarine cable system (Figs 1-6), wherein the power cable that minimizes electrical DC conductivity in the insulation (Paragraph 6), while improving electrical field distribution (Paragraph 8), and while hindering the migration of substances (Paragraph 12). Specifically, with respect to claim 8, Ghorbani teaches a first conductor section (2), a first insulation system section (20) arranged around the first conductor section (2), and a water blocking layer (19) arranged around the first insulation system section (20), wherein a water blocking tape (18) having water swellable material (Paragraph 54), is inserted between the insulation system section (20) and the water blocking layer (19). It would have been obvious to one having ordinary skill in the art of cables at the time the invention was made to modify the submarine power cable system of modified Manabe to comprise the water swellable materials configuration as taught by Ghorbani because Ghorbani teaches that such a configuration provides a submarine cable system (Figs 1-6), wherein the power cable that minimizes electrical DC conductivity in the insulation (Paragraph 6), while improving electrical field distribution (Paragraph 8), and while hindering the migration of substances (Paragraph 12). With respect to claims 9-10, it would have been an obvious matter of design choice to modify the submarine power cable system of modified Manabe to comprise the second static power cable section being longer than the first static power cable section, since such a modification would have involved a mere change in size of a component and a change of size is generally recognized as being within the ordinary skill in the art. In re Rose, 105 USPQ 237 (CCPA 1955). Claim(s) 12-13 are rejected under 35 U.S.C. 103 as being unpatentable over Manabe (Pat Num 9,722,406) in view of Nielsen (Pat Num 9,721,696), as applied to claim 1 & 6 above (herein referred to as modified Manabe), further in view of Cano et al (AU Pat Num 2018250364 A1, herein referred to as Cano). Manabe discloses a submarine power cable (Figs 1-6B) that has both sufficient flexibility and high impermeability (Col 2, lines 1-5). Specifically, with respect to claims 12-13, modified Manabe discloses that the each of the two additional static power cable sections (second and third 7) comprises a respective insulation system section (17 of second and third 7), and a respective metallic radial water-blocking sheath (21a of second and third 7) arranged around the insulation system section (17 of second and third 7, i.e. more than two wind generators may be connected resulting in multiple 3’s and 7’s being connected). However, modified Manabe doesn’t necessarily disclose the subsea electric component being a subsea T-joint, wherein the submarine power cable system comprises two additional static power cable sections, each connected to the subsea T-joint (claim 12). Cano teaches a submarine power cable system (Figs 1-10), which reduces overall weight so that the electrical conductors of the cable are not damaged (Page 2, lines 19-21), thereby reducing the risk of overloading the conductors of the cable (Page 2, lines 11-13). Specifically, with respect to claim 12, Cano teaches a submarine cable system (Fig 3) comprising a subsea electric component being a connector (99), wherein the connector (99 is a T-joint (Fig 3) It would have been obvious to one having ordinary skill in the art of cables at the time the invention was made to modify the submarine power cable systems of modified Manabe to comprise the connector being a T-joint connector configuration as taught by Cano because Cano teaches that such a configuration provides a submarine power cable system (Figs 1-10), which reduces overall weight so that the electrical conductors of the cable are not damaged (Page 2, lines 19-21), thereby reducing the risk of overloading the conductors of the cable (Page 2, lines 11-13) and since it has been held that a change in form cannot sustain patentability where involved is only extended application of obvious attributes from a prior art. In re Span-Deck Inc. vs. Fab-Con Inc. (CA 8, 1982) 215 USPQ 835. Conclusion The prior art made of record and not relied upon is considered pertinent to applicant's disclosure. Please refer to the enclosed PTO-892 form for the citation of pertinent art in the present case, all of which disclose various submarine cable systems comprising wet design power sections connected to static power cable sections. Communication Any inquiry concerning this communication or earlier communications from the examiner should be directed to WILLIAM H MAYO III whose telephone number is (571)272-1978. The examiner can normally be reached on M-Thurs (5:30a-3:00p) Fri 5:30a-2p (w/alternating Fridays off). If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Imani Hayman can be reached on (571) 270-5528. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of an application may be obtained from the Patent Application Information Retrieval (PAIR) system. Status information for published applications may be obtained from either Private PAIR or Public PAIR. Status information for unpublished applications is available through Private PAIR only. For more information about the PAIR system, see http://pair-direct.uspto.gov. Should you have questions on access to the Private PAIR system, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative or access to the automated information system, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /William H. Mayo III/ William H. Mayo III Primary Examiner Art Unit 2847 WHM III September 24, 2026
Read full office action

Prosecution Timeline

Jan 22, 2025
Application Filed
Oct 02, 2026
Non-Final Rejection mailed — §103 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12770756
SHIELDING WIRE
2y 1m to grant Granted Oct 20, 2026
Patent 12763566
Double-acting High Tension Compression Joint
4y 0m to grant Granted Oct 13, 2026
Patent 12763564
SELF TENSIONED CABLE GROUNDING DEVICE
3y 1m to grant Granted Oct 13, 2026
Patent 12763231
INSULATED ELECTRIC WIRE AND MANUFACTURING METHOD OF INSULATED ELECTRIC WIRE
2y 6m to grant Granted Oct 13, 2026
Patent 12755873
PASSIVE-TYPE HARMONIC REMOVAL DEVICE AND METHOD FOR MANUFACTURING SAME
2y 9m to grant Granted Oct 06, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

1-2
Expected OA Rounds
77%
Grant Probability
73%
With Interview (-3.9%)
2y 2m (~4m remaining)
Median Time to Grant
Low
PTA Risk
Based on 1299 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month