Prosecution Insights
Last updated: November 04, 2026
Application No. 19/036,177

MULTI-WAY VALVE AND THERMAL MANAGEMENT SYSTEM

Final Rejection §102§103§112
Filed
Jan 24, 2025
Priority
Jan 18, 2024 — continuation of PCTCN2024073085
Examiner
PRICE, CRAIG JAMES
Art Unit
3753
Tech Center
3700 — Mechanical Engineering & Manufacturing
Assignee
Johnson Electric International AG
OA Round
2 (Final)
69%
Grant Probability
Favorable
3-4
OA Rounds
1y 2m
Est. Remaining
91%
With Interview

Examiner Intelligence

Grants 69% — above average
69%
Career Allowance Rate
721 granted / 1044 resolved
-0.9% vs TC avg
Strong +22% interview lift
Without
With
+22.2%
Interview Lift
resolved cases with interview
Typical timeline
2y 11m
Avg Prosecution
47 currently pending
Career history
1094
Total Applications
across all art units

Statute-Specific Performance

§101
0.4%
-39.6% vs TC avg
§103
37.0%
-3.0% vs TC avg
§102
25.6%
-14.4% vs TC avg
§112
29.7%
-10.3% vs TC avg
Black line = Tech Center average estimate • Based on career data from 1044 resolved cases

Office Action

§102 §103 §112
DETAILED ACTION Claims 1-9 and 12-16 are pending and claims 10 and 11 have been cancelled. This is in response to the amendment filed 7/3/2026. Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . Response to Arguments Applicant’s arguments with respect to the pending claim(s) have been considered but are moot because the new ground of rejection does not rely on any reference applied in the prior rejection of record for any teaching or matter specifically challenged in the argument. Applicant’s argument relative to the 112 rejection for claim 2 is not persuasive, since the valve ports as shown are not perpendicular, they are parallel with the rotary axis. PNG media_image1.png 767 1201 media_image1.png Greyscale Since applicant’s amendments and the filing of the IDS necessitated the new grounds for rejection, this action has been made Final. The indicated allowability of claims 1-9 and 12-16 is withdrawn in view of the newly discovered reference(s) to Takada, as supplied by applicant. Rejections based on the newly cited reference(s) follow. Information Disclosure Statement The information disclosure statement (IDS) submitted on 7/3/2026 was filed prior to the mailing date of the mailing of this action. The submission complies with the provisions of 37 CFR 1.97. Accordingly, the information disclosure statement has been considered by the examiner. A second or any subsequent action on the merits in any application or patent involved in reexamination proceedings may not be made final if it contains a new ground of rejection … unless the new ground of rejection was necessitated by an amendment to the claims or as a result of information submitted in an information disclosure statement within the time period under 37 CFR 1.97(c) with the fee set forth in 37 CFR 1.17(p). (See MPEP 706.07(a)) Drawings The drawings were received on 7/3/2026. These drawings are accepted. Claim Objections The amendments overcome the prior objections. Claims 1,3,4,9,12,14 and 15 are objected to because of the following informalities: Claim 1, two ends of each flow channel, should be, - -two ends of each one of the flow channels - -, Claim 3, the core ports are configured to be aligned and in fluid communication with the corresponding valve ports, should be - - the two core ports are configured to be aligned and in fluid communication with one of the valve ports, correspondingly - -, Claim 4, the corresponding balance holes, should be, - - one of the balance holes, correspondingly - -, Claim 9, total number, should be - -a total number - -, Claim 12, the multi-channel valve, should be - - the multi-way valve - -, Claim 12, the valve core a closed fluid circuit, should be, - - the valve core for a closed fluid circuit, Claims 14 and 15, “one of the fluid circuits” should be - -one of the multiple fluid circuits - -. Appropriate correction is required. Claim Rejections - 35 USC § 112 The following is a quotation of 35 U.S.C. 112(b): (b) CONCLUSION.—The specification shall conclude with one or more claims particularly pointing out and distinctly claiming the subject matter which the inventor or a joint inventor regards as the invention. Claims 2-3 are rejected under 35 U.S.C. 112(b) as being indefinite for failing to particularly point out and distinctly claim the subject matter which the inventor or a joint inventor, regards as the invention. Claim 2 recites the limitation “the valve ports are defined in a side of the valve housing perpendicular to a rotation axis”, which is indefinite as to how valve ports (31), see Fig. 2A in the instant application, are perpendicular to the rotation axis. Port 31 is parallel to the rotation axis. Should “valve ports” be - -tubular interfaces (item 125) - -? PNG media_image2.png 373 411 media_image2.png Greyscale Appropriate correction is required. Claim Rejections - 35 USC § 102 In the event the determination of the status of the application as subject to AIA 35 U.S.C. 102 and 103 (or as subject to pre-AIA 35 U.S.C. 102 and 103) is incorrect, any correction of the statutory basis (i.e., changing from AIA to pre-AIA ) for the rejection will not be considered a new ground of rejection if the prior art relied upon, and the rationale supporting the rejection, would be the same under either status. The following is a quotation of the appropriate paragraphs of 35 U.S.C. 102 that form the basis for the rejections under this section made in this Office action: A person shall be entitled to a patent unless – (a)(1) the claimed invention was patented, described in a printed publication, or in public use, on sale, or otherwise available to the public before the effective filing date of the claimed invention. Claim(s) 1,2,5, and 6 are rejected under 35 U.S.C. 102a1 as being anticipated by Takada (WO 2014/147897). Regarding claim 1, Takada discloses a multi-way valve (1A, Fig. 10) comprising a valve housing (10) and a valve core (30A) rotatably mounted in the valve housing, the valve housing defining a plurality of valve ports (E1,E2, C1,C2), the valve core defining a plurality of flow channels (G1,G2); two ends of each flow channel (ends of G1, G2) being adapted to be respectively aligned with and in fluid communication with two of the valve ports of the valve housing; wherein a plurality of buffer chambers (H including the area within 15, 11a in Fig. 10) is formed between an inner surface of the valve housing and an outer surface of the valve core (as shown in Fig. 10); the buffer chambers are in fluid isolation from each other; the valve core is provided with a plurality of balance holes (36, at connection hole 33b, page 41 of English translation, see Fig. 11); each of the balance holes is in fluid communication with one of the flow channels; the buffer chambers communicate with the flow channels through the balance holes, correspondingly. Regarding claim 2, Takada, as best understood based on the 112 rejection above, discloses the valve ports are defined in a side of the valve housing perpendicular to a rotation axis of the valve housing to enable a fluid to flow into one of the flow channels via one of the valve ports and flow out of said one of the flow channels via another one of the valve ports (the limitations are met in as much as applicant’s device as best understood). Regarding claim 4, Takada discloses the buffer chambers are defined between axial ends of the valve core and the valve housing facing each other, the buffer chambers are distributed radially spaced relative to each other so that the corresponding balance holes directly communicating with the corresponding buffer chambers are offset radially to each other (as shown in Fig. 10 and 11, the buffer chambers are configured in this manner). Regarding claim 5, Takada discloses each of the buffer chambers is ring-shaped (as shown in Fig. 10 and 11). Regarding claim 6, Takada discloses a preload member (63) disposed between the valve housing and the valve core, and at least one of the buffer chambers is defined between the preload member and the valve core (as shown in Fig. 10, the buffer chamber is between the top of the spring 63 and the top of the valve core). Claim Rejections - 35 USC § 103 The following is a quotation of 35 U.S.C. 103 which forms the basis for all obviousness rejections set forth in this Office action: A patent for a claimed invention may not be obtained, notwithstanding that the claimed invention is not identically disclosed as set forth in section 102, if the differences between the claimed invention and the prior art are such that the claimed invention as a whole would have been obvious before the effective filing date of the claimed invention to a person having ordinary skill in the art to which the claimed invention pertains. Patentability shall not be negated by the manner in which the invention was made. This application currently names joint inventors. In considering patentability of the claims the examiner presumes that the subject matter of the various claims was commonly owned as of the effective filing date of the claimed invention(s) absent any evidence to the contrary. Applicant is advised of the obligation under 37 CFR 1.56 to point out the inventor and effective filing dates of each claim that was not commonly owned as of the effective filing date of the later invention in order for the examiner to consider the applicability of 35 U.S.C. 102(b)(2)(C) for any potential 35 U.S.C. 102(a)(2) prior art against the later invention. Claim 12 is rejected under 35 U.S.C. 103 as being unpatentable over Saginomiya Seisakusho Inc (JP 20242487, as supplied by applicant) in view of Takada (WO 2014/147897). Regarding claim 12, Saginomiya Seisakusho Inc disclose a thermal management system (100, see Fig. 16), comprising and multiple heat exchange branches (connected to “P” and 60,70,80) to form multiple fluid circuits, and two ends of one of the each heat exchange branches are correspondingly connected to two of the valve ports (20C,D/20E,S) to cooperatively form one of the fluid circuits via at least one of the flow channels of the valve core a closed fluid circuit, although is silent to having, the “multi-channel” valve of claim 1. It would have been obvious to one of ordinary skill in the art before the effective filing date of the claimed invention to substitute a multi-way valve as taught by Takada for the valve of Sangamonian Seisakusho Inc, since it has been held that an express suggestion to substitute one equivalent component or process for another is not necessary to render such substitution obvious. In reFout, 675 F.2d 297, 213 USPQ 532 (CCPA 1982). Allowable Subject Matter Claims 7-9 and 13-16 are objected to as being dependent upon a rejected base claim, but would be allowable if rewritten in independent form including all of the limitations of the base claim and any intervening claims. None of the prior art of record discloses or renders as obvious, a cover plate fixed to an axial top end of the valve core body, the cover plate comprises a plate portion, and a first ring portion and a second ring portion depending on a side of the plate portion, the plurality of buffer chambers comprises a first buffer chamber formed radially outside the first ring portion, a second buffer chamber formed between the first ring portion and the second ring portion, and a third buffer chamber formed radially inside the second ring portion; the first buffer chamber, the second buffer chamber, and the third buffer chamber are in fluid isolation from each other” in combination with the rest of the limitations in claim 7. Claim 8 depending from claim 7. None of the prior art of record discloses or renders as obvious, “total number of flow channels of the valve core is greater than a number of the flow channels directly communicating with the balance holes” in claim 9. None of the prior art of record discloses or renders as obvious,” a number of total flow channels of the valve core is greater than a number of flow channels directly communicating with the balance holes”, in claim 13. Claims 14-16 depending from claim 13. Claim 3 would be allowable if rewritten to overcome the rejection(s) under 35 U.S.C. 112(b) or 35 U.S.C. 112 (pre-AIA ), 2nd paragraph, set forth in this Office action and to include all of the limitations of the base claim and any intervening claims. None of the prior art of record discloses or renders as obvious, the balance holes are defined in the first axial end of the valve core, each of the flow channels has two core ports provided at the second axial end of the valve core, the core ports are configured to be aligned and in fluid communication with the corresponding valve ports, in combination with the rest of the limitations in claim 3. Conclusion The prior art made of record and not relied upon is considered pertinent to applicant's disclosure. Applicant's amendment necessitated the new ground(s) of rejection presented in this Office action. Accordingly, THIS ACTION IS MADE FINAL. See MPEP § 706.07(a). Applicant is reminded of the extension of time policy as set forth in 37 CFR 1.136(a). A shortened statutory period for reply to this final action is set to expire THREE MONTHS from the mailing date of this action. In the event a first reply is filed within TWO MONTHS of the mailing date of this final action and the advisory action is not mailed until after the end of the THREE-MONTH shortened statutory period, then the shortened statutory period will expire on the date the advisory action is mailed, and any nonprovisional extension fee (37 CFR 1.17(a)) pursuant to 37 CFR 1.136(a) will be calculated from the mailing date of the advisory action. In no event, however, will the statutory period for reply expire later than SIX MONTHS from the mailing date of this final action. Any inquiry concerning this communication or earlier communications from the examiner should be directed to Craig Price, whose telephone number is (571)272-2712 or via facsimile (571)273-2712. The examiner can normally be reached on Monday-Friday (8:00AM-4:30PM EST). If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Craig Schneider, can be reached at telephone number 571-272-3607, Kenneth Rinehart can be reached at 571-272-4881. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center, for more information about Patent Center and, https://www.uspto.gov/patents/docx, for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) Form at Form at; https://www.uspto.gov/patents/uspto-automated-interview-request-air-form. /CRAIG J PRICE/ Primary Examiner, Art Unit 3753
Read full office action

Prosecution Timeline

Jan 24, 2025
Application Filed
Apr 06, 2026
Non-Final Rejection mailed — §102, §103, §112
Jul 03, 2026
Response Filed
Sep 08, 2026
Final Rejection mailed — §102, §103, §112 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12774590
WALL FAUCET ASSEMBLY
2y 5m to grant Granted Oct 27, 2026
Patent 12760751
HYDRAULIC MANIFOLD
1y 8m to grant Granted Oct 13, 2026
Patent 12753979
CONNECTOR, CONNECTOR ASSEMBLY, LIQUID COOLED PLATE, AND LIQUID COOLED SERVER
2y 7m to grant Granted Oct 06, 2026
Patent 12734534
WATER FLOW CONTROL DEVICE WITH PRE-ADJUSTABLE OUTPUT
1y 8m to grant Granted Sep 15, 2026
Patent 12692953
Self-Regulating Storm Water Control Valve
2y 3m to grant Granted Jul 28, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

3-4
Expected OA Rounds
69%
Grant Probability
91%
With Interview (+22.2%)
2y 11m (~1y 2m remaining)
Median Time to Grant
Moderate
PTA Risk
Based on 1044 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month