Prosecution Insights
Last updated: November 16, 2026
Application No. 19/070,041

DUAL THRUSTER ASSEMBLY FOR MARITIME VEHICLE

Non-Final OA §112
Filed
Mar 04, 2025
Priority
Mar 04, 2024 — provisional 63/561,166
Examiner
VENNE, DANIEL V
Art Unit
3615
Tech Center
3600 — Transportation & Electronic Commerce
Assignee
Saronic Technologies
OA Round
1 (Non-Final)
71%
Grant Probability
Favorable
1-2
OA Rounds
87%
With Interview

Examiner Intelligence

Grants 71% — above average
71%
Career Allowance Rate
1200 granted / 1684 resolved
+19.3% vs TC avg
Strong +15% interview lift
Without
With
+15.3%
Interview Lift
resolved cases with interview
Typical timeline
Avg Prosecution
42 currently pending
Career history
1718
Total Applications
across all art units

Office Action

§112
DETAILED ACTION The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . An application was filed by applicant on 03/04/2025. Claims 1-20 are pending in the application. Drawings The drawings are objected to under 37 CFR 1.83(a). The drawings must show every feature of the invention specified in the claims. Therefore, the claimed feature limitations: “first aperture”, “second aperture” and “third aperture” must be shown as recited (it is suggested that such be shown with an appropriate reference characters corresponding to these feature(s) in the specification) or the feature(s) canceled from the claim(s). Appropriate correction is required. Similar applies to the claimed features “directional nozzle” and “alignment fasteners”. The drawings are objected to under 37 CFR 1.83(a) because they fail to show the above feature(s) (with appropriate reference characters corresponding to the feature(s) in the written description) consistent with the specification. Any structural detail that is essential for a proper understanding of the disclosed invention should be shown in the drawing. MPEP § 608.02(d). Corrected drawing sheets in compliance with 37 CFR 1.121(d) are required in reply to the Office action to avoid abandonment of the application. Any amended replacement drawing sheet should include all of the figures appearing on the immediate prior version of the sheet, even if only one figure is being amended. The figure or figure number of an amended drawing should not be labeled as “amended.” If a drawing figure is to be canceled, the appropriate figure must be removed from the replacement sheet, and where necessary, the remaining figures must be renumbered and appropriate changes made to the brief description of the several views of the drawings for consistency. Additional replacement sheets may be necessary to show the renumbering of the remaining figures. Each drawing sheet submitted after the filing date of an application must be labeled in the top margin as either “Replacement Sheet” or “New Sheet” pursuant to 37 CFR 1.121(d). If the changes are not accepted by the examiner, the applicant will be notified and informed of any required corrective action in the next Office action. The objection to the drawings will not be held in abeyance. No new matter should be entered. In addition to Replacement Sheets containing the corrected drawing figure(s), applicant is required to submit a marked-up copy of each Replacement Sheet including annotations indicating the changes made to the previous version. The marked-up copy must be clearly labeled as “Annotated Sheets” and must be presented in the amendment or remarks section that explains the change(s) to the drawings. See 37 CFR 1.121(d)(1). Failure to timely submit the proposed drawing and marked-up copy will result in the abandonment of the application. Specification The disclosure is objected to because of the following informality: The Specification does not refer to the drawings regarding the features indicated in paragraphs 4 and 5 of this Office Action. Appropriate correction is required. The Specification is objected to as failing to provide proper antecedent basis for the claimed subject matter. See 37 CFR 1.75(d)(1) and MPEP § 608.01(o). Correction of the following is required: The claim limitation “third aperture” is not found in the Specification as is recited in the claims. Claim limitations should be consistent with features found in and described in the Specification. In addition, terminology and nomenclature should be consistent throughout the disclosure, including the Abstract, Specification and Claims. This objection is not the same as an objection of the Specification for not providing sufficient support for the claimed subject matter. Similar applies for the claimed limitation “alignment fasteners”. The following section of the MPEP is provided for applicant’s use: MPEP § 608.01(o): 608.01(o) Basis for Claim Terminology in Description [R-07.2015] The meaning of every term used in any of the claims should be apparent from the descriptive portion of the specification with clear disclosure as to its import; and in mechanical cases, it should be identified in the descriptive portion of the specification by reference to the drawing, designating the part or parts therein to which the term applies. A term used in the claims may be given a special meaning in the description. See MPEP § 2111.01 and § 2173.05(a). Usually the terminology of the claims present on the filing date of the application follows the nomenclature of the specification, but sometimes in amending the claims or in adding new claims, new terms are introduced that do not appear in the specification. The use of a confusing variety of terms for the same thing should not be permitted. New claims, including claims first presented after the application filing date where no claims were submitted on filing, and amendments to the claims already in the application should be scrutinized not only for new matter but also for new terminology. While an applicant is not limited to the nomenclature used in the application as filed, he or she should make appropriate amendment of the specification whenever this nomenclature is departed from by amendment of the claims so as to have clear support or antecedent basis in the specification for the new terms appearing in the claims. This is necessary in order to insure certainty in construing the claims in the light of the specification. See 37 CFR 1.75, MPEP § 608.01(i) and § 1302.01 and § 2103. Note that examiners should ensure that the terms and phrases used in claims presented late in prosecution of the application (including claims amended via an examiner’s amendment) find clear support or antecedent basis in the description so that the meaning of the terms in the claims may be ascertainable by reference to the description, see 37 CFR 1.75(d)(1). If the examiner determines that the claims presented late in prosecution do not comply with 37 CFR 1.75(d)(1), applicant will be required to make appropriate amendment to the description to provide clear support or antecedent basis for the terms appearing in the claims provided no new matter is introduced. The specification should be objected to if it does not provide proper antecedent basis for the claims by using form paragraph 7.44:¶ 7.44 Claimed Subject Matter Not in SpecificationThe specification is objected to as failing to provide proper antecedent basis for the claimed subject matter. See 37 CFR 1.75(d)(1) and MPEP § 608.01(o). Correction of the following is required: __. Claim Rejections - 35 USC § 112 10. The following is a quotation of 35 U.S.C. 112(b): The specification shall conclude with one or more claims particularly pointing out and distinctly claiming the subject matter which the inventor or a joint inventor regards as the invention. 11. Claims 2 and 7 are rejected under 35 U.S.C. 112(b) as being indefinite for failing to particularly point out and distinctly claim the subject matter which the inventor, regards as the invention. 12. The claimed features “the aperture”, “the inlet” and “the transom channel” lack sufficient antecedent basis as recited in the claims (claims 2 and 7). Allowable Subject Matter Claims 1, 3-6 and 8-20 are allowable. Claims 2 and 7 would be allowable if rewritten to overcome the rejection(s) under 35 U.S.C. 112(b) set forth in this Office action and to include all of the limitations of the base claim and any intervening claims. Conclusion 15. The prior art cited and not relied upon is considered pertinent to applicant’s disclosure. The prior art reference cited by the examiner discloses a jet pump assembly within a transom. 16. Any inquiry concerning this communication or earlier communications from the examiner should be directed to DANIEL V VENNE whose telephone number is (571) 272-7947. The examiner can normally be reached between M-F, 7am-3:30pm Flex. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Marc Q Jimenez, who can be reached at phone number (571) 272-4530. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of an application may be obtained from the Patent Application Information Retrieval (PAIR) system. Status information for published applications may be obtained from either Private PAIR or Public PAIR. Status information for unpublished applications is available through Private PAIR only. For more information about the PAIR system, see http://pair-direct.uspto.gov. Should you have questions on access to the Private PAIR system, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). 17. If you would like assistance from a USPTO Customer Service Representative or access to the automated information system, call 800-786-9199 (USA OR CANADA) or 571-272-1000. /Daniel V Venne/ Senior Examiner, Art Unit 3615 10/19/2026
Read full office action

Prosecution Timeline

Mar 04, 2025
Application Filed
Oct 21, 2026
Non-Final Rejection mailed — §112 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12789950
DOCKING APPARATUS AND METHOD
3y 3m to grant Granted Nov 10, 2026
Patent 12789951
DAVIT DEVICE
3y 3m to grant Granted Nov 10, 2026
Patent 12780379
PROPULSION DRIVE ASSEMBLY WITH GAS SUPPLY TO MITIGATE FOULING
3y 4m to grant Granted Nov 03, 2026
Patent 12781791
TRIM TAB ACTUATOR ASSEMBLIES AND BRACKETS AND METHODS THEREOF
3y 1m to grant Granted Nov 03, 2026
Patent 12767291
Lifeboat
3y 2m to grant Granted Oct 20, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

1-2
Expected OA Rounds
71%
Grant Probability
87%
With Interview (+15.3%)
Low
PTA Risk
Based on 1684 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month