Prosecution Insights
Last updated: October 26, 2026
Application No. 19/099,139

IN-VEHICLE CONTROL DEVICE

Non-Final OA §102
Filed
Jan 28, 2025
Priority
Jul 29, 2022 — nonprovisional of PCTJP2022029319
Examiner
TAN, RICHARD
Art Unit
2836
Tech Center
2800 — Semiconductors & Electrical Systems
Assignee
Sumitomo Electric Industries Ltd.
OA Round
1 (Non-Final)
80%
Grant Probability
Favorable
1-2
OA Rounds
8m
Est. Remaining
99%
With Interview

Examiner Intelligence

Grants 80% — above average
80%
Career Allowance Rate
741 granted / 931 resolved
+11.6% vs TC avg
Strong +23% interview lift
Without
With
+23.0%
Interview Lift
resolved cases with interview
Typical timeline
2y 5m
Avg Prosecution
16 currently pending
Career history
957
Total Applications
across all art units

Statute-Specific Performance

§101
1.8%
-38.2% vs TC avg
§103
46.7%
+6.7% vs TC avg
§102
22.5%
-17.5% vs TC avg
§112
25.3%
-14.7% vs TC avg
Black line = Tech Center average estimate • Based on career data from 931 resolved cases

Office Action

§102
DETAILED ACTION 1. The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . Claim Objections 2. Claims 2-6 and 15 are objected to because of the following informalities: Regarding claim 2, the claim limitation “…a first power path side to a second power path side…” should be “…the first power path side to the second power path side…” according to antecedent basis requirement. Dependent claims 3-6 and 15 are also objected to at least the same reason as objected claim 2 as stated above because the dependent claims 3-6 and 15 depend on the objected claim 2. Appropriate correction is required. Claim Rejections - 35 USC § 102 3. The following is a quotation of the appropriate paragraphs of 35 U.S.C. 102 that form the basis for the rejections under this section made in this Office action: A person shall be entitled to a patent unless – (a)(1) the claimed invention was patented, described in a printed publication, or in public use, on sale or otherwise available to the public before the effective filing date of the claimed invention. (a)(2) the claimed invention was described in a patent issued under section 151, or in an application for patent published or deemed published under section 122(b), in which the patent or application, as the case may be, names another inventor and was effectively filed before the effective filing date of the claimed invention. 4. Claim 1 is rejected under 35 U.S.C. 102(a)(1) as being anticipated by Kawakami et al. (WO2021/059523) (hereinafter “Kawakami”). Regarding claim 1, Kawakami discloses an in-vehicle control device (20) for use in an in-vehicle system (Fig.1 and 4-7, please refer to the whole reference for detailed) provided with: a power source unit (90 in Fig.1; ¶ 38) for supplying power; a power storage unit (50) that is not the power source unit (90); a first power path (70A) to which a voltage based on the power source unit (90) is applied; a second power path (second power path between node P3 and 14) serving as a path for supplying power supplied from the first power path to a load (12 and 14); a third power path (61A) that is not the first power path (70A) and the second power path (second power path between node P3 and 14); and a fourth power path (62A) to which a voltage based on the power storage unit (50) is applied, the in-vehicle control device (20; please refer to at least ¶ 46 and 47) being configured to control power supply from the power storage unit (50) and comprising: a voltage conversion unit (31) configured to perform a first conversion operation of converting a voltage applied to the third power path (61A) and applying an output voltage to the fourth power path (62A), and a second conversion operation of converting a voltage applied to the fourth power path (62A) and applying an output voltage to the third power path (61A; please refer to at least ¶ 32); a control unit (control unit of 31) configured to control the voltage conversion unit (31); a first element part (42 in Fig.5) capable of allowing a current to flow from a voltage conversion unit side (side of 31) to a second power path side (side of second power path between node P3 and 14) and interrupting a current flow from the second power path side to the voltage conversion unit side (according to Fig.5, the switch 42 is switched to provide current flow only in one direction which is to the second power path side, not vice versa); a second element part (22A in Fig.7) capable of allowing a current to flow from a first power path side (70A) to a voltage conversion unit side (side of 31) and interrupting a current flow from the voltage conversion unit side to the first power path side (according to Fig.7, the switch 22A is switched to provide current flow only in one direction which is to the voltage conversion unit side, not vice versa); and a third element part (41 in Fig.4) capable of allowing a current to flow from a power storage unit side (side of 50) to a second power path side (side of second power path between node P3 and 14) and interrupting a current flow from the second power path side to the power storage unit side (according to Fig.4, the switch 41 is switched to provide current flow only in one direction which is to the second power path side, not vice versa). Allowable Subject Matter 5. Claims 7-14 are objected to as being dependent upon a rejected base claim, but would be allowable if rewritten in independent form including all of the limitations of the base claim and any intervening claims. 6. Claims 2-6 and 15 would be allowable if rewritten or amended to overcome the objection set forth in this Office action and to include all of the limitations of the base claim and any intervening claims. Conclusion Any inquiry concerning this communication or earlier communications from the examiner should be directed to RICHARD TAN whose telephone number is (571)270-7455. The examiner can normally be reached on M-F 8:30am-5:00pm. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Menatoallah Youssef can be reached on 571-270-3684. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of an application may be obtained from the Patent Application Information Retrieval (PAIR) system. Status information for published applications may be obtained from either Private PAIR or Public PAIR. Status information for unpublished applications is available through Private PAIR only. For more information about the PAIR system, see http://pair-direct.uspto.gov. Should you have questions on access to the Private PAIR system, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative or access to the automated information system, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /Richard Tan/Primary Examiner 2836
Read full office action

Prosecution Timeline

Jan 28, 2025
Application Filed
Sep 22, 2026
Non-Final Rejection mailed — §102 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12771320
PIEZOELECTRIC RESONATOR
1y 9m to grant Granted Oct 20, 2026
Patent 12771361
ATOMIC OSCILLATOR
1y 8m to grant Granted Oct 20, 2026
Patent 12763599
BATTERY SWAPPING STATION HAVING MODE IN WHICH BATTERY PACK IS OPERATED AT TIME OF POWER SUPPLY INTERRUPTION
1y 9m to grant Granted Oct 13, 2026
Patent 12763725
INJECTION LOCKED OSCILLATOR ARRAY CIRCUIT DEVICE AND METHOD FOR DESIGNING INJECTION LOCKING CIRCUIT IN SUB-MMWAVE BAND
1y 8m to grant Granted Oct 13, 2026
Patent 12756361
SYSTEM AND METHOD OF COMPENSATING CRYSTAL OSCILLATOR PAD LEAKAGE CURRENT
2y 0m to grant Granted Oct 06, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

1-2
Expected OA Rounds
80%
Grant Probability
99%
With Interview (+23.0%)
2y 5m (~8m remaining)
Median Time to Grant
Low
PTA Risk
Based on 931 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month