Prosecution Insights
Last updated: October 26, 2026
Application No. 19/099,195

UPLINK POSITIONING METHOD, DEVICE AND PROCESSOR-READABLE STORAGE MEDIUM

Non-Final OA §103
Filed
Jan 28, 2025
Priority
Aug 03, 2022 — CN 202210926246.6 +1 more
Examiner
KIM, WESLEY LEO
Art Unit
2648
Tech Center
2600 — Communications
Assignee
Datang Mobile Communications Equipment Co., Ltd.
OA Round
1 (Non-Final)
61%
Grant Probability
Moderate
1-2
OA Rounds
2y 6m
Est. Remaining
93%
With Interview

Examiner Intelligence

Grants 61% of resolved cases
61%
Career Allowance Rate
211 granted / 347 resolved
-1.2% vs TC avg
Strong +32% interview lift
Without
With
+32.5%
Interview Lift
resolved cases with interview
Typical timeline
4y 3m
Avg Prosecution
10 currently pending
Career history
369
Total Applications
across all art units

Statute-Specific Performance

§101
5.6%
-34.4% vs TC avg
§103
53.5%
+13.5% vs TC avg
§102
19.9%
-20.1% vs TC avg
§112
14.5%
-25.5% vs TC avg
Black line = Tech Center average estimate • Based on career data from 347 resolved cases

Office Action

§103
Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . Claim Rejections - 35 USC § 103 The following is a quotation of 35 U.S.C. 103 which forms the basis for all obviousness rejections set forth in this Office action: A patent for a claimed invention may not be obtained, notwithstanding that the claimed invention is not identically disclosed as set forth in section 102, if the differences between the claimed invention and the prior art are such that the claimed invention as a whole would have been obvious before the effective filing date of the claimed invention to a person having ordinary skill in the art to which the claimed invention pertains. Patentability shall not be negated by the manner in which the invention was made. Claims 1-2, 6-7, 11-12, and 16 are rejected under 35 U.S.C. 103 as being unpatentable over Keating (US 11950169) in view of Xin (US 20250227435). Regarding Claims 1 and 11, Keating teaches a network device (Col.9:lines 25-27, Col.4:lines 4-13 and Fig.4:410, “As a low earth orbit (LEO) satellite equipped with a gNB with fixed beams moves along its orbit, the location management function (LMF) requests the position of a UE. FIG. 1 shows the scenario; The gNB triggers the UE to transmit an SRS burst with a first periodicity T1 (e.g., using DCI).) comprising a memory, a transceiver, and a processor, wherein, the memory is configured to store a computer program; the transceiver is configured to send and receive data under control of the processor; and the processor is configured to read the computer program in the memory and perform the following operations: receiving, by the network device, an uplink positioning request message from a Location Management Function (LMF) (Fig.4:410); determining, by the network device, a plurality of positioning measurement time instants (Col.3:lines 57-58 and Col.4:lines 18-32, gNB determines periodicity/time instance T2) and satellite information corresponding to each positioning measurement time instant (Col.4:lines 50-54 and Col.8:lines 41-45, gNB knows the satellite information (e.g. id/position), hence must determine); at each positioning measurement time instant.. obtain a plurality of positioning measurement results (Col.4:lines 50-54); and sending, by the network device to the LMF, the plurality of positioning measurement results and the positioning measurement time instant corresponding to each positioning measurement result and/or satellite information corresponding to each positioning measurement result (Col.4:lines 50-54), however Keating does not expressly teach instructing, by the network device, to a satellite corresponding to the positioning measurement time instant to perform uplink positioning measurement and obtain a plurality of positioning measurement results. Xin teaches instructing, by the network device, to a satellite corresponding to the positioning measurement time instant to perform uplink positioning measurement (Par.171, Par.178-179, SRS configuration and gNB/TRPs 6b transmit respective request to obtaining positioning information to corresponding satellites. Note: satellite information must be utilized here to transmit) and obtain a plurality of positioning measurement results (Par.169, Par.180, measurement results). Therefore, to one of ordinary skill in the art before the effective filing date, it would have been obvious to modify Keating with the teachings of Xin. Both references are directed to the same field (5G NTN positioning), and Xin’s network-based control and scheduling is a known technique for improving measurement reliability and flexibility, it would be natural and predictable to use Xin’s scheduling to trigger and coordinate the measurements performed in Keating’s system ensuring that the measurement occurs at the correct time and under the correct configuration (e.g. SRS resource, timing, etc) as the satellite moves. This combination would yield a system where the network not only receives and processes satellite measurements (Keating) in optimal fashion but also ensures precise network control, timing, and ability to adapt to network and satellite dynamics. Regarding Claim 6, the rejection of Independent Claim 1 and 11 fully addresses and rejects the limitations of Independent Claim 6 with obvious wording variations. Regarding Claims 2, 7, and 12, Keating teaches wherein the satellite information comprises one or more of the following: identification information of a satellite; location information of a satellite; transmission-reception point (TRP) information, wherein the TRP information comprises identification information of one or more TRPs and location information of each TRP (Col.4:lines 50-54 and Col.8:lines 41-45). Regarding Claim 16, Keating teaches An LMF, comprising a memory, a transceiver, and a processor, wherein, the memory is configured to store a computer program; the transceiver is configured to send and receive data under control of the processor; and the processor is configured to read the computer program in the memory and perform steps of the method according to claim 6 (Fig.4). Claims 3-5, 8-10, 13-15, and 17-20 are rejected under 35 U.S.C. 103 as being unpatentable over Keating (US 11950169) and Xin (US 20250227435) in further view of ETSI (ETSI TS 138305 V16.4.0). Regarding Claims 3, 8, and 13, While Keating and Xin teach an LMF transmitting a uplink measurement request (Fig.4, Keating) and determining, by the network device, the plurality of positioning measurement time instants (See Rejection of Claim 2 above), the combination does not expressly teach the uplink positioning request message comprises time information of uplink positioning measurement; determining, by the network device, the plurality of positioning measurement time instants based on the time information of the uplink positioning measurement. ETSI teaches uplink positioning request message comprises time information of uplink positioning measurement (Pg.84: section 8.10.2.4; Table 8.10.2.4-1 and Pg.85: Table 8.10.2.4-3, uplink positioning timing information (e.g. UL timing information, Activation time) and Pg.89-90: section 8.10.3.2.2-section 8.10.3.2.3). By this teaching, it is obvious that determining, by the network device, the plurality of positioning measurement time instants, as taught by Keating and Xin, would be based on the time information of ETSI. To one of ordinary skill in the art, it would have been obvious before the effective filing date of the invention to modify Keating and Xin with the teachings of ETSI to provide a system where the LMF not only requests measurements but also explicitly defines the timing (period, start/end time) for those measurements, as taught by the standards, to achieve more reliable and accurate UE positioning in non-terrestrial networks. Regarding Claims 4, 9, 14, and 19, ETSI teaches the time information of the uplink positioning measurement comprises one or more of the following: one or more time instants of performing the uplink positioning measurement; time requirement information of the uplink positioning measurement (ETSI: Pg.84: section 8.10.2.4; Table 8.10.2.4-1 and Pg.85: Table 8.10.2.4-3, uplink positioning timing information (e.g. UL timing information, Activation time) and Pg.89-90: section 8.10.3.2.2-section 8.10.3.2.3). Regarding Claim 5, 10, 15, and 20, ETSI teaches the time requirement information of the uplink positioning measurement comprises one or more of the following: start time of the uplink positioning measurement; end time of the uplink positioning measurement; a time interval of the uplink positioning measurement; a quantity of uplink positioning measurements (ETSI: Pg.84: section 8.10.2.4; Table 8.10.2.4-1 and Pg.85: Table 8.10.2.4-3, uplink positioning timing information (e.g. UL timing information, Activation time) and Pg.89-90: section 8.10.3.2.2-section 8.10.3.2.3). Regarding Claim 17, Keating teaches the satellite information comprises one or more of the following: identification information of the satellite; location information of the satellite; TRP information, wherein the TRP information comprises identification information of one or more TRPs and location information of each TRP (Col.4:lines 50-54 and Col.8:lines 41-45). Regarding Claim 18, the rejection of Claims 3, 8, and 13 fully address the limitations of Claim 18. Conclusion Any inquiry concerning this communication or earlier communications from the examiner should be directed to WESLEY LEO KIM whose telephone number is (571)272-7867. The examiner can normally be reached 9-5:30 M-F. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /WESLEY L KIM/Supervisory Patent Examiner, Art Unit 2648
Read full office action

Prosecution Timeline

Jan 28, 2025
Application Filed
Sep 16, 2026
Non-Final Rejection mailed — §103 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12763850
BEAM SELECTION IN NON-TERRESTRIAL NETWORKS
3y 6m to grant Granted Oct 13, 2026
Patent 12757040
OPTIMAL END-TO-END SLICING IN NEXT-GENERATION NETWORKS WITH MULTI-TIME SCALE APPROACH
2y 0m to grant Granted Oct 06, 2026
Patent 12732215
COORDINATION OF COMMUNICATION PROTOCOLS USING A SHARED FRONT-END MODULE
4y 1m to grant Granted Sep 08, 2026
Patent 12720315
SYSTEM AND METHOD FOR FACILITATING MOBILE DEVICE ACCESS TO WEB APPLICATIONS
3y 5m to grant Granted Aug 25, 2026
Patent 12696090
ACCESS-CONTROL-PURPOSE SYSTEM, COMMUNICATION SYSTEM, ACCESS CONTROL METHOD, AND PROGRAM
2y 0m to grant Granted Jul 28, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

1-2
Expected OA Rounds
61%
Grant Probability
93%
With Interview (+32.5%)
4y 3m (~2y 6m remaining)
Median Time to Grant
Low
PTA Risk
Based on 347 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month