Prosecution Insights
Last updated: October 25, 2026
Application No. 19/100,106

METHOD BY WHICH TERMINAL PERFORMS MEASUREMENT IN WIRELESS COMMUNICATION SYSTEM, AND DEVICE THEREFOR

Non-Final OA §102§103
Filed
Jan 30, 2025
Priority
Aug 11, 2022 — RE 10-2022-0100918 +2 more
Examiner
AHMED, SYED MUZAKKIR
Art Unit
2466
Tech Center
2400 — Computer Networks
Assignee
LG Electronics Inc.
OA Round
1 (Non-Final)
83%
Grant Probability
Favorable
1-2
OA Rounds
1y 4m
Est. Remaining
99%
With Interview

Examiner Intelligence

Grants 83% — above average
83%
Career Allowance Rate
50 granted / 60 resolved
+25.3% vs TC avg
Strong +20% interview lift
Without
With
+20.0%
Interview Lift
resolved cases with interview
Typical timeline
3y 1m
Avg Prosecution
29 currently pending
Career history
116
Total Applications
across all art units

Statute-Specific Performance

§101
0.3%
-39.7% vs TC avg
§103
63.6%
+23.6% vs TC avg
§102
27.0%
-13.0% vs TC avg
§112
9.1%
-30.9% vs TC avg
Black line = Tech Center average estimate • Based on career data from 60 resolved cases

Office Action

§102 §103
DETAILED ACTION Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . Priority The instant application claims foreign priority to 10-2022-0100918, filed 08/11/2022 and claims foreign priority to 10-2022-0125145, filed 09/30/2022. Information Disclosure Statement The information disclosure statement (IDS) submitted, IDS - 09/10/2026. The submission is in compliance with the provisions of 37 CFR 1.97. Accordingly, the information disclosure statement is being considered by the examiner. Claim Rejections - 35 USC § 102 In the event the determination of the status of the application as subject to AIA 35 U.S.C. 102 and 103 (or as subject to pre-AIA 35 U.S.C. 102 and 103) is incorrect, any correction of the statutory basis (i.e., changing from AIA to pre-AIA ) for the rejection will not be considered a new ground of rejection if the prior art relied upon, and the rationale supporting the rejection, would be the same under either status. The following is a quotation of the appropriate paragraphs of 35 U.S.C. 102 that form the basis for the rejections under this section made in this Office action: A person shall be entitled to a patent unless – (a)(1) the claimed invention was patented, described in a printed publication, or in public use, on sale, or otherwise available to the public before the effective filing date of the claimed invention. (a)(2) the claimed invention was described in a patent issued under section 151, or in an application for patent published or deemed published under section 122(b), in which the patent or application, as the case may be, names another inventor and was effectively filed before the effective filing date of the claimed invention. Claim(s) 16-20, 22, 23 and 25-28 are rejected under 35 U.S.C. 102(a)(2) as being anticipated by PENG et al. “US 20250133529 A1”. Regarding Claim 16, PENG discloses, ‘A method by a user equipment (UE) comprising: receiving configuration information for configuring time domain windows (TDWs) for a carrier phase measurement within a measurement gap from a network ‘( the wireless communication device is configured to measure the reference signals for positioning within a processing window associated to carrier [0024-0025]. PRS processing window is a periodicity. Alternatively, the periodicity of the PRS processing window is in unit of milli-second (ms) or time slot [0137]. The PRS measured by a WTRU can be within a PRS processing window. The PRS measured by a UE can be within a measurement-gap [0084]. A WTRU can measure phase difference of PRS between two CC [0114]. Disclosure claim 1 and Fig. 10, receiving the WTRU configuration PRS; measuring and reporting the WTRU. Measure phase difference, disclosure claim 6. Measures carrier phase [0086] and report carrier phase disclosure Claim 23.); And discloses, ‘measuring a phase difference of positioning reference signals (PRSs) based on the configuration information’ (a WTRU receives configuration and measures plurality of PRS disclosure claim 1, and measures the phase difference disclosure claim 6 and [0107-0108] and Fig. 11.); And discloses, ‘and reporting measurement information regarding the phase difference to the network, same TDW among the TDWs.’ (WTRU report measurement of time difference and phase difference measurement includes the PRS-identifier, disclosure claim 1 and claim 6. WTRU Measures PRS within a PRS processing window associated to PRS resource set configured [0025, 0084], disclosure claim 1, disclosure 21 and disclosure claim 22. Measures phase difference accuracy, Fig. 5 includes PRS-identifier and report [0111]. The UE report phase difference to the BS [0100, 0163]. Fig. 11 includes measurement of time difference, phase difference and report. PRS processing window is a periodicity, time slot, within a SS/PBCH block measurement timing configuration (SMTC) window [0135-0138, 0140] .) Regarding Claim 17, ‘The method of claim 16’ (disclosed above), And discloses, ‘wherein a size of each of the TDWs is determined based on a specific number of slots or a specific number of symbols included in the configuration information.’ (The PRS processing window is unit-mili-second or time slots [0137]. And slots and symbols uses the number specific [0123-0127, 0149-0150].) Regarding Claim 18, ‘The method of claim 16’ (disclosed above), And discloses, ‘wherein a size of each of the TDWs is determined based on the number of PRS resource sets or the number of transmission reception points (TRPs) included in the configuration information.’(configuration PRS resource sets [0107]. A PRS processing window associated with a PRS resource set configured by the network [0140]. The PRS includes identifier of PRS and a TRP [0030] and the UE report the measurement associated PRS-ID, PRS-resource-set, one/more TRP-ID [0108-0111]. Number of PRS-resources N-units mili-seconds T mili-seconds. Duration of PRS symbols [0150-0151]. ) Regarding Claim 19, ‘The method of claim 16’ (disclosed above), And discloses, ‘wherein a size of each of the TDWs is determined based on the number of transmission reception points (TRPs) or the number of PRS resource sets configured in a positioning frequency layer configured for the UE.’ (configuration of PRS and frequency layer resource sets and frequency layer. Configured to measure PRS associated to PRS resource set, disclosure claim 1 and claim 22, [0107-0110]. Measurement results includes PRS-resource-set and TRP-identifier, disclosure claim 18.) Regarding Claim 20, ‘The method of claim 16’ (disclosed above), And discloses, ‘wherein the configuration information includes information about a size of each of the TDWs and a gap between the TDWs.’ (The PRS measured by a UE can be within a measurement gap. Measured by a UE can be within a PRS processing window [0084, 0140] time-gap [0124-0125]. Processing window is a periodicity e.g., (time slot, mili-seconds). SS/PBCH block timing measurement configuration [0137-0138]. ) Regarding Claim 22, ‘The method of claim 16’ (disclosed above), And discloses, ‘wherein the configuration information includes information about a reference transmission reception point (TRP) related to a PRS.’ (the UE measures PRS between TRP [0163]. Measurement includes TRP [0109-110].) Regarding Claim 23, ‘The method of claim 22’ (disclosed above), And discloses, ‘wherein the TDWs are configured from a specific timing within the measurement gap, and wherein the specific timing is determined based on a timing at which the PRS is received from the reference TRP within the measurement gap.’ (specific time [0124-0125].) Regarding Claim 25, PENG discloses, ‘A user equipment (UE) comprising: a radio frequency (RF) transceiver’ (Fig. 2); And discloses, ‘and a processor connected to the RF receiver, wherein the processor controls the RF transceiver to receive configuration information for configuring time domain windows (TDWs) for a carrier phase measurement within a measurement gap from a network, measures a phase difference of positioning reference signals (PRSs) based on the configuration information, and reports measurement information regarding the phase difference to the network, and wherein the phase difference is measured using only the PRSs received within a same TDW among the TDWs.’ (Fig. 2 illustrates the processor/transceiver. Methods/implementation disclosed executed by processor [0058]. receive the configuration second claim element similar to Claim 1 disclosed above.) Regarding Claim 26, Similar to Claim 16 disclosed above, ‘A method by a network comprising: transmitting configuration information for configuring time domain windows (TDWs) for a carrier phase measurement within a measurement gap to the a user equipment (UE); measuring a phase difference of positioning reference signals (PRSs) based on the configuration information; and receiving measurement information regarding the phase difference, wherein the measurement information includes the phase difference measured using only the PRSs received within a same TDW among the TDWs.’ (The WTRU received configuration sent by the NW/BS disclosed above Claim 16. ) Regarding Claim 27, ‘The method of claim 26’ (disclosed above), Similar to claim 17 disclosed above, ‘wherein a size of each of the TDWs is indicated based on the configuration information including a specific number of slots or a specific number of symbols.’ Regarding Claim 28, ‘The method of claim 26’ (disclosed above), Similar to claim 18 disclosed above, ‘wherein a size of each of the TDWs is indicated based on the configuration information including the number of PRS resource sets or the number of transmission reception point (TRP) identifiers (IDs).’ (TRP-identifier [0108-0111].) Claim Rejections - 35 USC § 103 In the event the determination of the status of the application as subject to AIA 35 U.S.C. 102 and 103 (or as subject to pre-AIA 35 U.S.C. 102 and 103) is incorrect, any correction of the statutory basis (i.e., changing from AIA to pre-AIA ) for the rejection will not be considered a new ground of rejection if the prior art relied upon, and the rationale supporting the rejection, would be the same under either status. The following is a quotation of 35 U.S.C. 103 which forms the basis for all obviousness rejections set forth in this Office action: A patent for a claimed invention may not be obtained, notwithstanding that the claimed invention is not identically disclosed as set forth in section 102, if the differences between the claimed invention and the prior art are such that the claimed invention as a whole would have been obvious before the effective filing date of the claimed invention to a person having ordinary skill in the art to which he claimed invention pertains. Patentability shall not be negated by the manner in which the invention was made. The factual inquiries for establishing a background for determining obviousness under 35 U.S.C. 103 are summarized as follows: • Determining the scope and contents of the prior art. • Ascertaining the differences between the prior art and the claims at issue. • Resolving the level of ordinary skill in the pertinent art. • Considering objective evidence present in the application indicating • obviousness or nonobviousness. This application currently names joint inventors. In considering patentability of the claims the examiner presumes that the subject matter of the various claims was commonly owned as of the effective filing date of the claimed invention(s) absent any evidence to the contrary. Applicant is advised of the obligation under 37 CFR 1.56 to point out the inventor and effective filing dates of each claim that was not commonly owned as of the effective filing date of the later invention in order for the examiner to consider the applicability of 35 U.S.C. 102(b)(2)(C) for any potential 35 U.S.C. 102(a)(2) prior art against the later invention. Claims 21, and 24 are rejected under 35 U.S.C. 103 as being unpatentable over PENG et al. in view of Hoang et al. (US-20250151010-A1), prov. 63395462, 08/05/2022 included to this office action hereinafter “Hoang”. Regarding Claim 21, ‘The method of claim 16’ (disclosed above), And discloses, ‘wherein a size of each of the TDWs is determined based on a maximum time period.’ (PRS processing window is within SS/PBCH measurement time configuration [0138]. The UE can process/capability within a PRS processing window includes maximum aggregated bandwidth in component-carrier (CC). Slot/symbols at CC, number-CC-slots. Symbol/slot-level buffering. N units of mili-second a UE can process every T mili-second [0148-0152]. ) And didn’t disclose, ‘during which the UE maintains phase continuity’, Hoang in the relevant art discloses, time window configured and perform phased measurement. Maintain phase-continuity during the time window. Enable phase measurement [0177-0178], prov. [0129-0130]. Therefore, a person in the ordinary skill in the art before the effective filing date of the claim invention would have recognized that the disclosure of PENG and to include with that of Hoang to come up with the claim invention, PENG motive to perform measurement within a PRS processing window [0163]. Perform time and phase difference of PRS disclosure claim 1 and claim 6. Measure accuracy in phase difference Fig. 5 and to improve accuracy-positioning method [0111, 0163]. PENG complement the motive to indicate the phase measurement-accuracy of phase maintenance achievable for PRS phase measurement [0178], prov. [0129-0130]. Regarding Claim 24, ‘The method of claim 16’ (disclosed above), And didn’t disclose, ‘wherein the UE fixes a phase locked loop (PLL) during a time period of each of the TDWs.’ Hoang in the relevant art discloses, The WTRU determine to perform phase difference measurement where PRS has time error and /or phase error [0173], prov. [0125]. PLL high-precision to maintain phase continuity configured QoS to enable the phase measurement. Indicates a granularity of phase continuity [0178], prov. [0130]. To deactivate any of a PLL (e.g., high precision PLL), a time window, and/or PRS for phase measurements. Determines consistency of phase continuity [0178-0180], prov. [0130-0132]. Time window during phase continuity maintained activation/deactivation [0181-0183], prov [0133-0135]. Motive would be identical to perform measurement specific to phase difference and measure accurately phase difference. More specifically PENG discloses to receive configuration to perform the phase difference measurement and to identify the accuracy in measurement uses cumulative distribution function. To improve the positioning-method [0105, 0111, 0163]. Hoang complement the motive to improve accuracy in phase continuity identifies the phase error [0173] to maintain high precision determine the consistency of phase continuity [0178-0179]. Specifically discloses, the WTRU receives configuration indicate phase maintenance time window to maintain phase continuity includes phase drift [0174], prov. [0126]. The WTRU determine phase difference measurement between PRS resources identify phase error/drift below pre-configured threshold [0302], prov. [0169]. Conclusion The prior art made of record and not relied upon is considered pertinent to applicant's disclosure: (US20240179689A1) “Time domain window for joint channel estimation”. Fischer, Sven. "5G NR positioning." 5G and Beyond: Fundamentals and Standards. Cham: Springer International Publishing, 2021. (Year: 2021). Fig. 15.9 and Fig. 15.11 illustrates measurement error. PNG media_image1.png 372 856 media_image1.png Greyscale PNG media_image2.png 348 852 media_image2.png Greyscale Tech Report 38.855: Study on NR positioning support (Year: 2019) Tech Spec 38.455: NG-RAN; NR Positioning Protocol A (NRPPa) (Year: 2022) Tech Spec 37.355: LTE Positioning Protocol (LPP) (Year: 2022) Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. Any inquiry concerning this communication or earlier communications from the examiner should be directed to Syed Ahmed whose telephone number is (703)-756-5308. The examiner can normally be reached from Monday-Friday 9am-6pm. The examiner can also be reached on alternate If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Faruk Hamza can be reached on (571) 272-7969. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /S.A./Examiner, Art Unit 2466 /CHRISTOPHER M CRUTCHFIELD/Primary Examiner, Art Unit 2466
Read full office action

Prosecution Timeline

Jan 30, 2025
Application Filed
Oct 01, 2026
Non-Final Rejection mailed — §102, §103 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12764017
SERVICE MANAGEMENT AND ORCHESTRATION FOR PRIVATE AND PUBLIC MOBILE NETWORKS
2y 6m to grant Granted Oct 13, 2026
Patent 12757270
EFFICIENT SIMULTANEOUS COMMUNICATION OF A DUAL-CONNECTED WIRELESS NODE
4y 0m to grant Granted Oct 06, 2026
Patent 12757179
SYSTEM AND METHOD FOR RESOURCE ALLOCATION USING BANDWIDTH PARTS
3y 7m to grant Granted Oct 06, 2026
Patent 12750299
SYSTEMS AND METHODS FOR INCREASING NETWORK RESOURCE UTILIZATION IN LINK AGGREGATION GROUP (LAG) DEPLOYMENTS
4y 2m to grant Granted Sep 29, 2026
Patent 12745221
SIDELINK BEAM MANAGEMENT BASED ON REFERENCE SIGNAL AND SIDELINK CHANNEL TRANSMISSIONS
2y 10m to grant Granted Sep 22, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

1-2
Expected OA Rounds
83%
Grant Probability
99%
With Interview (+20.0%)
3y 1m (~1y 4m remaining)
Median Time to Grant
Low
PTA Risk
Based on 60 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month