Prosecution Insights
Last updated: October 26, 2026
Application No. 19/119,284

EXTENDER AND MODULAR SCREED RAIL SYSTEM

Non-Final OA §102§103
Filed
Apr 08, 2025
Priority
Oct 10, 2022 — GB 2214892.8 +1 more
Examiner
CAJILIG, CHRISTINE T
Art Unit
3633
Tech Center
3600 — Transportation & Electronic Commerce
Assignee
Concrete Floor Products Limited
OA Round
1 (Non-Final)
71%
Grant Probability
Favorable
1-2
OA Rounds
8m
Est. Remaining
86%
With Interview

Examiner Intelligence

Grants 71% — above average
71%
Career Allowance Rate
735 granted / 1037 resolved
+18.9% vs TC avg
Strong +15% interview lift
Without
With
+15.1%
Interview Lift
resolved cases with interview
Typical timeline
2y 3m
Avg Prosecution
31 currently pending
Career history
1065
Total Applications
across all art units

Statute-Specific Performance

§101
0.7%
-39.3% vs TC avg
§103
44.3%
+4.3% vs TC avg
§102
25.9%
-14.1% vs TC avg
§112
22.6%
-17.4% vs TC avg
Black line = Tech Center average estimate • Based on career data from 1037 resolved cases

Office Action

§102 §103
DETAILED ACTION Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . Claim Rejections - 35 USC § 102 The following is a quotation of the appropriate paragraphs of 35 U.S.C. 102 that form the basis for the rejections under this section made in this Office action: A person shall be entitled to a patent unless – (a)(1) the claimed invention was patented, described in a printed publication, or in public use, on sale, or otherwise available to the public before the effective filing date of the claimed invention. Claim(s) 1, 2, 7, 9, 12, 15, 16, 18, 20-22, 28, 30, 33, 34, 37, 38, and 40 is/are rejected under 35 U.S.C. 102(a)(1) as being anticipated by FR2619844 to Cautain (“Cautain”). Regarding claim 1, Cautain discloses an extender 1 for extending the height of a screed rail, the extender 1 comprising: an elongate body having side portions 2, 5 defining a lower end portion 5a, 5b and an upper end portion 2a, 2b; wherein the side portions 2, 5 are connected by at least one resiliently deformable bridge 8 therebetween, the bridge permitting lateral movement of the side portions towards and away from each other; wherein the lower end portion and the upper end portion are configured to be engageable with the upper end portion and lower end portion respectively of a second extender, such that a plurality of extenders may be connected together (see Fig. 4 showing multiple extenders 1.1, 1.2 connected together). Regarding claim 2, Cautain discloses that the connecting bridge deforms under pressure in preference to the side portions. Regarding claim 7, Cautain discloses that the lower end portion and/or the upper end portion comprise a recess (created under ridges 4 or above ridges 6), forming an elongate channel along some or all the length of the body. Regarding claim 9, Cautain discloses that the lower end portion recess is configured to receive the upper end portion of another extender (via engagement of ridges 4 and 6). Regarding claim 12, Cautain discloses locking means 4, 6 for locking lower and upper end portions together. Regarding claim 15, Cautain discloses that the upper end portion 2 is configured to releasably engage with a cover strip. See Fig. 3, 4. Regarding claim 16, Cautain discloses that the lower end portion is configured to engage with a screed rail. See Fig. 10. Regarding claim 18, Cautain discloses one or more elongate resiliently compressible members 12 positioned within the extender body for providing additional resilience to lateral compressive forces. Regarding claim 20, Cautain discloses that the extender is formed as a single plastics extrusion. See par 006 of machine translation from IDS. Regarding claim 21, Cautain discloses that a modular screed rail system (Fig. 10) comprising at least one extender 1 according to claim 1 and a screed rail 20, wherein the screed rail comprises an elongate body comprising a base portion (horizontal portion of 20) and an upwardly extending portion (vertical portion of 20), and the lower end portion of the extender is configured to be engageable with the upwardly extending portion of the screed rail. Regarding claim 22, Cautain discloses that the upwardly extending portion of the screed rail has side portions (left and right legs of 20 that extend upwardly from horizontal portion of 20) which are connected by at least one resiliently deformable bridge (not labeled, shown in Fig. 10) therebetween. Regarding claim 28, Cautain discloses that the upper end of the upwardly extending portion of the screed rail body 20 is configured to engage with the lower end portion of the extender 1. See Fig. 10. Regarding claim 30, Cautain discloses that the upper end of the upwardly extending portion of the screed rail body comprises locking means (similar to means 4 labeled in Fig. 1) for locking the screed rail and the extender together. Regarding claim 33, Cautain discloses a cover strip 11. Regarding claim 34, Cautain discloses that the cover strip is configured to be releasably positioned over the upper end of the upwardly extending portion of the screed rail and the upper end portion of the extender. Regarding claim 37, Cautain discloses that the cover strip 11 is capable of releasably clipping over the upper end of the upwardly extending portion of the screed rail and the upper end portion of the extender. Regarding claim 38, Cautain discloses that the cover strip 11 comprises releasable engaging means (similar to means 6 of extender 1) for releasably engaging the cover strip with the screed rail and the extender. Regarding claim 40 , Cautain discloses that the screed rail 20 and one or more extenders 10 are formed from the same plastics material as separate integral pieces (plastic, par 005 and 006 of machine translation from IDS. Claim Rejections - 35 USC § 103 The following is a quotation of 35 U.S.C. 103 which forms the basis for all obviousness rejections set forth in this Office action: A patent for a claimed invention may not be obtained, notwithstanding that the claimed invention is not identically disclosed as set forth in section 102, if the differences between the claimed invention and the prior art are such that the claimed invention as a whole would have been obvious before the effective filing date of the claimed invention to a person having ordinary skill in the art to which the claimed invention pertains. Patentability shall not be negated by the manner in which the invention was made. Claim(s) 5 and 26 is/are rejected under 35 U.S.C. 103 as being unpatentable over Cautain. Regarding claims 5 and 26, Cautain does not disclose a plurality of bridges nor that the upwardly extending portion of the screed rail comprises a plurality of connecting bridges. It has been held that a mere duplication of parts, such as the duplication of the bridges in the extender or screed rail, has no patentable significance unless a new and unexpected result is produced. A duplication of parts is generally recognized as being within the level of ordinary skill in the art. In re Harza, 274 F.2d 669, 124 USPQ 378 (CCPA 1955). Conclusion Any inquiry concerning this communication or earlier communications from the examiner should be directed to CHRISTINE T CAJILIG whose telephone number is (571)272-8143. The examiner can normally be reached M-F 9am-5pm. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Brian Glessner can be reached at 571-272-6754. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /CHRISTINE T CAJILIG/Primary Examiner, Art Unit 3633
Read full office action

Prosecution Timeline

Apr 08, 2025
Application Filed
Sep 15, 2026
Non-Final Rejection mailed — §102, §103 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12768218
HARDWARE PREPARATION FILLER SYSTEM AND METHOD FOR FIRE RATED DOORS
2y 7m to grant Granted Oct 20, 2026
Patent 12768189
BASE MEMBER AND METHOD FOR ATTACHING AN UPWARDLY EXTENDING POST TO A SURFACE AND ITS USE
1y 10m to grant Granted Oct 20, 2026
Patent 12768164
Fire Resistant Wallboard
2y 0m to grant Granted Oct 20, 2026
Patent 12760586
INTEGRATING COMMUNICATION LINES INTO PROFILES
3y 3m to grant Granted Oct 13, 2026
Patent 12760588
Flood Barrier and Method of Use
3y 3m to grant Granted Oct 13, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

1-2
Expected OA Rounds
71%
Grant Probability
86%
With Interview (+15.1%)
2y 3m (~8m remaining)
Median Time to Grant
Low
PTA Risk
Based on 1037 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month