Prosecution Insights
Last updated: November 20, 2026
Application No. 19/121,824

PARALLEL-STAGE MEDIUM-SPEED SHAFT SYSTEM CONNECTING STRUCTURE FOR WIND TURBINE, AND SHAFT SYSTEM

Non-Final OA §102§112
Filed
Apr 17, 2025
Priority
Oct 21, 2022 — CN 202211295149.8 +1 more
Examiner
CLARK, RYAN C
Art Unit
3745
Tech Center
3700 — Mechanical Engineering & Manufacturing
Assignee
ZF Wind Power Antwerpen N V
OA Round
1 (Non-Final)
88%
Grant Probability
Favorable
1-2
OA Rounds
4m
Est. Remaining
95%
With Interview

Examiner Intelligence

Grants 88% — above average
88%
Career Allowance Rate
269 granted / 305 resolved
+18.2% vs TC avg
Moderate +7% lift
Without
With
+7.1%
Interview Lift
resolved cases with interview
Fast prosecutor
1y 11m
Avg Prosecution
17 currently pending
Career history
334
Total Applications
across all art units

Statute-Specific Performance

§101
3.0%
-37.0% vs TC avg
§103
39.9%
-0.1% vs TC avg
§102
30.5%
-9.5% vs TC avg
§112
25.2%
-14.8% vs TC avg
Black line = Tech Center average estimate • Based on career data from 305 resolved cases

Office Action

§102 §112
DETAILED ACTION Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . Drawings Figure 2 should be designated by a legend such as --Prior Art-- because only that which is old is illustrated. See MPEP § 608.02(g). Corrected drawings in compliance with 37 CFR 1.121(d) are required in reply to the Office action to avoid abandonment of the application. The replacement sheet(s) should be labeled “Replacement Sheet” in the page header (as per 37 CFR 1.84(c)) so as not to obstruct any portion of the drawing figures. If the changes are not accepted by the examiner, the applicant will be notified and informed of any required corrective action in the next Office action. The objection to the drawings will not be held in abeyance. Claim Rejections - 35 USC § 112 The following is a quotation of 35 U.S.C. 112(b): (b) CONCLUSION.—The specification shall conclude with one or more claims particularly pointing out and distinctly claiming the subject matter which the inventor or a joint inventor regards as the invention. The following is a quotation of 35 U.S.C. 112 (pre-AIA ), second paragraph: The specification shall conclude with one or more claims particularly pointing out and distinctly claiming the subject matter which the applicant regards as his invention. Claims 1-12 are rejected under 35 U.S.C. 112(b) or 35 U.S.C. 112 (pre-AIA ), second paragraph, as being indefinite for failing to particularly point out and distinctly claim the subject matter which the inventor or a joint inventor (or for applications subject to pre-AIA 35 U.S.C. 112, the applicant), regards as the invention. The term “intermediate-speed” in claims 1-12 is a relative term which renders the claim indefinite. The term “intermediate-speed” is not defined by the claim(s), the specification does not provide a standard for ascertaining the requisite degree, and one of ordinary skill in the art would not be reasonably apprised of the scope of the invention. “intermediate” is defined as “being or occurring at the middle place, stage, or degree or between extremes” (see Merriam Webster online dictionary). This language is indefinite as the specification does not describe what the Applicant considers to be an “intermediate-speed” The term “high-speed” in claims 1-2, 5-8, and 10-12 is a relative term which renders the claim indefinite. The term “high-speed” is not defined by the claim(s), the specification does not provide a standard for ascertaining the requisite degree, and one of ordinary skill in the art would not be reasonably apprised of the scope of the invention. “high” is defined as “of greater degree, amount, cost, value, or content than average, usual, or expected” (see Merriam Webster online dictionary). This language is indefinite as the specification does not describe what the Applicant considers to be a “high-speed”. Claims 3-4 and 9 are rejected based on their dependencies. The term “thin-walled” in claims 1, 6-8, and 10-12 is a relative term which renders the claim indefinite. The term “thin-walled” is not defined by the claim, the specification does not provide a standard for ascertaining the requisite degree, and one of ordinary skill in the art would not be reasonably apprised of the scope of the invention. “thin” is defined as, “having little extend from one surface to its opposite” (see Merriam Webster online dictionary). This language is indefinite as the specification does not describe what the Applicant considers to be a “thin-walled” flange compared to what the Applicant considers to be a “regular” or “standard” flange. Claims 2-5 and 9 are rejected based on their dependencies. Claim Rejections - 35 USC § 102 The following is a quotation of the appropriate paragraphs of 35 U.S.C. 102 that form the basis for the rejections under this section made in this Office action: A person shall be entitled to a patent unless – (a)(1) the claimed invention was patented, described in a printed publication, or in public use, on sale, or otherwise available to the public before the effective filing date of the claimed invention. Claims 1-12 (as well as they are understood by the Examiner) are rejected under 35 U.S.C. 102(a)(1) as being anticipated by Smook (US PGPUB 2016/0363212 A1). PNG media_image1.png 522 484 media_image1.png Greyscale Regarding claim 1, Smook discloses a wind turbine generator parallel-stage intermediate-speed shaft train connecting structure ([0003], Fig. 1), comprising: a sun shaft (111); a downstream shaft portion (See annotated Fig. 1 above); a high-speed gear (105), the high-speed gear being arranged outside of the downstream shaft portion in an axial direction (Fig. 1), and an axial position of the downstream shaft portion being fixed relative to a wind turbine generator box ([0003] indicates the transmission is used in a drive-train of a wind power plant; Fig. 1); and a thin-walled flange ring (see annotated Fig. 1 above), the thin-walled flange ring having an elasticity (implicit, all real objects have an elasticity) and being fixedly connected to each of the sun shaft and the high-speed gear to cause the sun shaft to rotate the high-speed gear (Fig. 1), so as to allow the thin-walled flange ring to absorb a floating shift of the sun shaft by elastic deformation (The Examiner notes that if the sun shaft moves, it follows that other portions of the device also move with the sun shaft as they are enmeshed). Regarding claim 2, Smook discloses all of claim 1 as above, wherein rolling bearings (109) are provided between the downstream shaft portion and the high-speed gear to allow for the rotation of the high-speed gear relative to the downstream shaft portion (Fig. 1) Regarding claim 3, Smook discloses all of claim 2 as above, wherein the downstream shaft portion is fixedly connected to the wind turbine generator box ([0003], Fig. 1). Regarding claim 4, Smook discloses all of claim 2 as above, wherein the rolling bearings are configured as a pair of tapered roller bearings (Fig. 1) arranged in the form of an O ([0042], the tapered bearings are “planetary”). Regarding claim 5, Smook discloses all of claim 2 as above, wherein outer rings of the rolling bearings are constructed integrally with the high-speed gear (Fig. 1, 109 & 105). Regarding claim 6, Smook discloses all of claim 1 as above, wherein a friction lining (121) is provided on an abutment surface (107) of the thin-walled flange against the sun shaft and the high-speed gear (Fig. 1). Regarding claim 7, Smook discloses all of claim 1 as above, wherein connecting pins (129) are further provided on abutment surface (107) of the thin-walled flange against the sun shaft and the high-speed gear (Fig. 1). Regarding claim 8, Smook discloses all of claim 1 as above, wherein an abutment surface (107) of the thin-walled flange against the sun shaft and the high-speed gear is an end face perpendicular to an axis (Fig. 1, the Examiner notes the axis is the axis shown in Fig. 1 that is parallel with the sun shaft). Regarding claim 9, Smook discloses a wind turbine generator ([0003] parallel-stage intermediate-speed shaft train, comprising the wind turbine generator parallel-stage intermediate-speed shaft train connecting structure according to claim 1 as above. Regarding claim 10, Smook discloses all of claim 2 as above, wherein a friction lining (121) is provided on an abutment surface (107) of the thin-walled flange against the sun shaft and the high-speed gear (Fig. 1). Regarding claim 11, Smook discloses all of claim 2 as above, wherein connecting pins (129) are further provided on abutment surface (107) of the thin-walled flange against the sun shaft and the high-speed gear (Fig. 1). Regarding claim 12, Smook discloses all of claim 2 as above, wherein an abutment surface (107) of the thin-walled flange against the sun shaft and the high-speed gear is an end face perpendicular to an axis (Fig. 1, the Examiner notes the axis is the axis shown in Fig. 1 that is parallel with the sun shaft). Conclusion The prior art made of record and not relied upon is considered pertinent to applicant's disclosure. PNG media_image2.png 304 400 media_image2.png Greyscale US Patent 8,038,402 B2 discloses a compact geared drive train. PNG media_image3.png 536 486 media_image3.png Greyscale US PGPUB 2003/0125158 A1 discloses a planetary gear stage. Any inquiry concerning this communication or earlier communications from the examiner should be directed to RYAN C CLARK whose telephone number is (571)272-2871. The examiner can normally be reached Monday - Thursday 0730-1730, Alternate Fridays 0730-1630. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Courtney D Heinle can be reached at (571)-270-3508. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /RYAN C CLARK/Primary Examiner, Art Unit 3745
Read full office action

Prosecution Timeline

Apr 17, 2025
Application Filed
Oct 06, 2026
Non-Final Rejection mailed — §102, §112 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12790949
LOCKING SPACER ASSEMBLIES AND METHOD FOR INSTALLING A LOCKING SPACER ASSEMBLY
2y 1m to grant Granted Nov 10, 2026
Patent 12789961
HULL-DIRECTED PROPULSION SYSTEM OF CONTRA-ROTATING PROPELLER AND METHOD FOR MANUFACTURING THE SAME
1y 6m to grant Granted Nov 10, 2026
Patent 12779573
CONTROLLING ON-TIME OF PWM APPLIED TO POWER BLOCKS IN WELDING SYSTEM
3y 7m to grant Granted Nov 03, 2026
Patent 12775046
INTEGRATED WIND-TURBINE MONITORING
2y 3m to grant Granted Oct 27, 2026
Patent 12774679
NOSECONE FOR A DUCTED FAN GAS TURBINE ENGINE
2y 4m to grant Granted Oct 27, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

1-2
Expected OA Rounds
88%
Grant Probability
95%
With Interview (+7.1%)
1y 11m (~4m remaining)
Median Time to Grant
Low
PTA Risk
Based on 305 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month