Prosecution Insights
Last updated: November 16, 2026
Application No. 19/126,062

MULTI-LEVEL TUNNEL STRUCTURE HAVING UPPER TUNNEL AND LOWER TUNNEL CONNECTED, AND CONSTRUCTION METHOD THEREFOR

Non-Final OA §103
Filed
Apr 30, 2025
Priority
Nov 02, 2022 — RE 10-2022-0144489 +1 more
Examiner
OQUENDO, CARIB A
Art Unit
3678
Tech Center
3600 — Transportation & Electronic Commerce
Assignee
Bt Corp.
OA Round
1 (Non-Final)
78%
Grant Probability
Favorable
1-2
OA Rounds
90%
With Interview

Examiner Intelligence

Grants 78% — above average
78%
Career Allowance Rate
671 granted / 860 resolved
+26.0% vs TC avg
Moderate +12% lift
Without
With
+12.2%
Interview Lift
resolved cases with interview
Typical timeline
Avg Prosecution
20 currently pending
Career history
888
Total Applications
across all art units

Office Action

§103
DETAILED ACTION Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . Claim Rejections - 35 USC § 103 In the event the determination of the status of the application as subject to AIA 35 U.S.C. 102 and 103 (or as subject to pre-AIA 35 U.S.C. 102 and 103) is incorrect, any correction of the statutory basis (i.e., changing from AIA to pre-AIA ) for the rejection will not be considered a new ground of rejection if the prior art relied upon, and the rationale supporting the rejection, would be the same under either status. The following is a quotation of 35 U.S.C. 103 which forms the basis for all obviousness rejections set forth in this Office action: A patent for a claimed invention may not be obtained, notwithstanding that the claimed invention is not identically disclosed as set forth in section 102, if the differences between the claimed invention and the prior art are such that the claimed invention as a whole would have been obvious before the effective filing date of the claimed invention to a person having ordinary skill in the art to which the claimed invention pertains. Patentability shall not be negated by the manner in which the invention was made. Claim(s) 1-5 and 7-9 is/are rejected under 35 U.S.C. 103 as being unpatentable over Araki et al. (JP 2008169577) in view of Kanai et al. (JP 2005068861) and Otsuka et al. (JP 2581167). As to claim 1 and 9, Araki et al. discloses a method for constructing a multi-level tunnel structure in which two shield tunnels (2A, 2B) are drilled to be adjacent to each other in the vertical direction (see paragraphs [0014] and [0015], and figures 1 and 2). Araki discloses the invention substantially as claimed. However, Araki et al. is silent about the support frame installation step (S20), the side part formation step (S30), and the slab formation step (S40) of claim 1. However, the support frame installation step (S20) could be readily derived from the feature of Araki et al. wherein retaining walls (12) are provided in the upper and lower shield tunnels (2A, 2B) (see figures 1 and 2). Kanai teaches wherein perfect circle holding units (7, 8) and a horizontal beam (3) are provided between upper and lower segments (1, 2) (see claim 1 and figure 1). In addition, the side part formation step (S30), and the slab formation step (S40) could be readily derived from the features of Kanai et al. wherein a gap between the upper and lower segments (1, 2) are penetrated and the horizontal beams (3) are provided therebetween (see claim 1 and figure 1). It would have been obvious to one of ordinary skill in the art to modify the method of Araki et al. to include the two circular cross section and the side and slab formation step as taught by Kanai et al., since it would provide a well-known method of multi-level tunnels. Furthermore, Otsaku discloses wherein a connecting part (22) is formed by means of excavation such that both tunnels (10, 12) are connected to each other (see paragraph [0019] and figures 1-7). It would have been obvous to one of ordinary skill in the art to modify the method of Kanai to use excavation as taught by Otsaku, since it would provide as conventional and economic way to form and connect tunnels. As to claim 2, Araki et al. discloses wherein the two shield tunnels (2A, 2B) are drilled to be adjacent to each other in the vertical direction (see figure 1) and the segments (1, 2) of D2 (see claim 1 and figure 1). As to claim 3 and 5, Araki et al. as modified above discloses of: the connecting part (22) formed by means of excavation such that both tunnels (10, 12) are connected to each other, the connecting part (22) including a top plate (24) and a bottom plate (26); and a step of dismantling temporary shoring (32) the step of lining and reinforcement on the wall is inherent (see Otsuka paragraphs [0019] and [0031], and figures 1-7). As to claim 4, Araki et al. as modified above could be readily derived from the openings (18, 20) of D3 (see figures 2-6). As to claim 7-8, Araki et al. as modified above discloses wherein a support member (9) of the upper perfect circle holding unit (7) supports the upper segment (1), pressure is transmitted to the horizontal beam (3), and the lower perfect circle holding unit (8) is mounted on the lower segment (2) by means of the support member (9) (see Kanai et al. line 23 on page 2 to line 2 on page 3, and figure 1). Claim(s) 6 and 10 is/are rejected under 35 U.S.C. 103 as being unpatentable over Araki et al. (JP 2008169577) in view of Kanai et al. (JP 2005068861) and Otsuka et al. (JP 2581167) and Zhou et al. (CN 113123803). As to claim 6 and 10, Araki et al. as modified above discloses the invention substantially as claimed. However, Araki et al. as modified above is silent about wherein the slab formation step includes: a main slab formation step of forming a main slab to connect opposite sides of the side surface parts to each other; and a lower slab formation step of forming a lower slab to connect lower half parts of the lower tunnel to each other. Zhou et al. teaches a reinforced concrete slabs (2) provided on the upper and lower sides connected to each other (see claim 1 and figure 1). It would have been obvious to one of ordinary skill in the art to modify the method of Araki as modified to include an upper and lower slab as taught by Zhou et al., since it would a two level road for underground tunnels. Conclusion Any inquiry concerning this communication or earlier communications from the examiner should be directed to CARIB A OQUENDO whose telephone number is (571)270-7411. The examiner can normally be reached Monday-Friday, 9am-5:30pm. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Amber Anderson can be reached at 571-270-5281. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /CARIB A OQUENDO/ Primary Examiner, Art Unit 3678
Read full office action

Prosecution Timeline

Apr 30, 2025
Application Filed
Oct 20, 2026
Non-Final Rejection mailed — §103 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12781461
SEGMENTED WALL AND LANDSCAPING BLOCK SYSTEMS WITH LUG PROCESSES
2y 7m to grant Granted Nov 03, 2026
Patent 12768270
DEVICE FOR PROVIDING BRAIDS, SYSTEM COMPRISING THE DEVICE AND METHOD FOR PROVIDING BRAIDS
1y 12m to grant Granted Oct 20, 2026
Patent 12760650
EXCAVATED MATTER CONVEYANCE SYSTEM INSIDE DRIFTWAY
2y 0m to grant Granted Oct 13, 2026
Patent 12760633
SYSTEMS AND METHODS FOR HORIZONTAL WELLS FOR IN-SITU MINING WITH OR WITHOUT ELECTROKINETIC ASSISTANCE
2y 2m to grant Granted Oct 13, 2026
Patent 12753565
MODULAR WALL SYSTEM
2y 10m to grant Granted Oct 06, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

1-2
Expected OA Rounds
78%
Grant Probability
90%
With Interview (+12.2%)
Low
PTA Risk
Based on 860 resolved cases by this examiner. Grant probability derived from career allowance rate.