Application No. 19/191,023

Risk Analysis Method and Risk Analysis System

Final Rejection §101§103
Filed
Apr 28, 2025
Priority
Nov 12, 2024 — JP 2024-197574
Examiner
SCHEUNEMANN, RICHARD N
Art Unit
3624
Tech Center
3600 — Transportation & Electronic Commerce
Assignee
Hitachi Ltd.
OA Round
2 (Final)
6%
Grant Probability
At Risk
3-4
OA Rounds
2y 5m
Est. Remaining
14%
With Interview

Examiner Intelligence

Grants only 6% of cases
6%
Career Allowance Rate
35 granted / 561 resolved
-45.8% vs TC avg
Moderate +8% lift
Without
With
+8.3%
Interview Lift
resolved cases with interview
Typical timeline
3y 11m
Avg Prosecution
29 currently pending
Career history
625
Total Applications
across all art units

Statute-Specific Performance

§101
36.5%
-3.5% vs TC avg
§103
39.4%
-0.6% vs TC avg
§102
7.9%
-32.1% vs TC avg
§112
16.0%
-24.0% vs TC avg
Black line = Tech Center average estimate • Based on career data from 561 resolved cases

Office Action

§101 §103
DETAILED ACTION Introduction This Non-Final Office Action is in response to the application with serial number 19/191,023, filed on April 28, 2025. Claims 1-14 are pending. Information Disclosure Statement The information disclosure statement filed on April 28, 2025, has been considered. Claim Rejections - 35 USC § 101 35 U.S.C. 101 reads as follows: Whoever invents or discovers any new and useful process, machine, manufacture, or composition of matter, or any new and useful improvement thereof, may obtain a patent therefor, subject to the conditions and requirements of this title. The Manual of Patent Examining Procedure (MPEP) provides detailed rules for determining subject matter eligibility for claims in §2106. Those rules provide a basis for the analysis and finding of ineligibility that follows. Claims 1-14 are rejected under 35 U.S.C. 101. The claimed invention is directed to non-statutory subject matter because the claimed invention recites a judicial exception (i.e., a law of nature, a natural phenomenon, or an abstract idea) without significantly more. Under Step 1 of the subject matter eligibility analysis, claims(s) 1-14 are all directed to one of the four statutory categories of invention. However, under step 2A, prong one, the claims recite a judicial exception: risk analysis (as evidenced by the preamble of exemplary independent claim 1), an abstract idea. Certain methods of organizing human activity are ineligible abstract ideas, including managing personal behavior or relationships or interactions between people. See MPEP §2106.04(a). Additionally, note that mathematical concepts, including mathematical relationships and formulas, are ineligible abstract ideas. See Id. The limitations of exemplary claim 1 include: “defining a plurality of normal-time objective functions;” “defining an emergency-time objective function . . . [with] input being a predetermined equation including . . . the plurality of normal-time objective functions each multiplied by a second contribution degree;” and “outputting the second contribution degrees in the emergency-time objective function.” The steps are all steps for managing personal behavior related to the abstract idea of risk analysis that, when considered alone and in combination, are part of the abstract idea of risk analysis. The dependent claims further recite steps for managing personal behavior that are part of the abstract idea of risk analysis. These claim elements, when considered alone and in combination, are considered to be abstract ideas because they are directed to a method of organizing human activity which includes defining objective functions that characterize risk. Under step 2A, prong two, of the subject matter eligibility analysis, a claim that recites a judicial exception must be evaluated to determine whether the claim provides a practical application of the judicial exception. Additional elements of the independent claims amount to generic computer hardware that does not provide a practical application (a processor in independent claims 1 and 8). See MPEP §2106.04(d)[I]. The claims do not recite an improvement to another technology or technical field, nor do they recite an improvement to the functioning of the computer itself. See MPEP §2106.05(a). Because the claims only recite use of a generic computer, they do not apply the judicial exception with a particular machine. See MPEP §2106.05(b). Under step 2B of the subject matter eligibility analysis, the claims do not integrate the abstract idea into a judicial exception. Referring to the additional elements provided in the analysis in step one, above, the generic computer hardware does not provide significantly more than the recited abstract idea. See MPEP §2106.05(f). For these reasons, the claims do not provide a practical application of the abstract idea, nor do they amount to significantly more than an abstract idea under step 2B of the subject matter eligibility analysis. Using a generic computer to implement an abstract idea does not provide an inventive concept. Therefore, the claims recite ineligible subject matter under 35 USC §101. Claim Rejections - 35 USC § 103 The following is a quotation of 35 U.S.C. 103 which forms the basis for all obviousness rejections set forth in this Office action: A patent for a claimed invention may not be obtained, notwithstanding that the claimed invention is not identically disclosed as set forth in section 102, if the differences between the claimed invention and the prior art are such that the claimed invention as a whole would have been obvious before the effective filing date of the claimed invention to a person having ordinary skill in the art to which the claimed invention pertains. Patentability shall not be negated by the manner in which the invention was made. Claim(s) 1 and 8 is/are rejected under 35 U.S.C. 103 as being unpatentable over US 20100185557 A1 to Hunter et al. (hereinafter ‘HUNTER’) in view of US 11615473 B2 to Shakfeh (hereinafter ‘SHAKFEH’). Claim 1 HUNTER discloses a risk analysis method executed by a risk analysis system that executes risk analysis for reducing a risk that occurs in an emergency (see ¶[0007]-[0009] and [0105]-[0108]; describe how assets behave in times of crisis using an objective function. Maximize return while minimizing the overall risk), the risk analysis method comprising: by a processor of the risk analysis system (see ¶[0014]; the steps of the method are performed in a processor which has access to storage in which are stored historic returns data for the assets and programs implementing a plurality of objective functions and a plurality of adjustments to the objective functions), defining a plurality of normal-time objective functions each of which is an objective function representing an objective to be normally achieved (see abstract; optimization may involve different objective functions) and has, as input to a predetermined function that outputs a predetermined value in response to the input, a predetermined equation that includes, as first-order terms or factors, a plurality of explanatory factors each multiplied by a first contribution degree relating to the relevant explanatory factor (see ¶[0158]-[0160]; a linear objective function that uses option values as weights. See also ¶[0170]-[0171]; external factors such as price or broad market index); and defining an emergency-time objective function that is an objective function representing an objective to be achieved in order to reduce the risk (see ¶[0106] and [0173]; describe how assets behave during a time of crisis. Incorporate elasticity of liquidity into the objective function). HUNTER does not specifically disclose, but SHAKFEH discloses, as a function that outputs a value in response to input, the input being a predetermined equation including, as first-order terms or factors, the plurality of normal-time objective functions each multiplied by a second contribution degree relating to the relevant normal-time objective function (see abstract and col 2, ln 51-col 2, ln 2; cost analysis includes risk minimization. Apply different weights to categories of threats); and outputting the second contribution degrees in the emergency-time objective function through machine learning of second sample data relating to the emergency-time objective function (see again abstract; apply different weights to categories of threats. Measure how a population or area responds to threats. See also col 1, ln 29-44; use machine learning analysis). HUNTER further discloses and extracting, on a basis of the second contribution degrees, a prioritized normal-time objective function to be optimized with priority from the normal-time objective functions (see optimize a set of assets using an objective function across scenarios). HUNTER discloses resource allocation techniques that includes objective functions that are optimized for risk that consider how assets behave during a time of crisis. SHAKFEH discloses resilience measurement using objective functions that describe the ability to respond to threats. It would have been obvious for one of ordinary skill in the art at the time of invention to include the different weights for categories of threats as taught by SHAKFEH in the system executing the method of HUNTER with the motivation to minimize risk and optimize objectives over a time period that includes threats and crises. Claim 8 HUNTER discloses a risk analysis system that executes risk analysis for reducing a risk that occurs in an emergency (see ¶[0007]-[0009] and [0105]-[0108]; describe how assets behave in times of crisis using an objective function. Maximize return while minimizing the overall risk), wherein a processor of the risk analysis system (see ¶[0014]; the steps of the method are performed in a processor which has access to storage in which are stored historic returns data for the assets and programs implementing a plurality of objective functions and a plurality of adjustments to the objective functions) defines a plurality of normal-time objective functions each of which is an objective function representing an objective to be normally achieved (see abstract; optimization may involve different objective functions) and has, as input to a predetermined function that outputs a predetermined value in response to the input, a predetermined equation that includes, as first-order terms or factors, a plurality of explanatory factors each multiplied by a first contribution degree relating to the relevant explanatory factor (see ¶[0158]-[0160]; a linear objective function that uses option values as weights. See also ¶[0170]-[0171]; external factors such as price or broad market index); defines an emergency-time objective function that is an objective function representing an objective to be achieved in order to reduce the risk (see ¶[0106] and [0173]; describe how assets behave during a time of crisis. Incorporate elasticity of liquidity into the objective function). HUNTER does not specifically disclose, but SHAKFEH discloses, as a function that outputs a value in response to input, the input being a predetermined equation including, as first-order terms or factors, the plurality of normal-time objective functions each multiplied by a second contribution degree relating to the relevant normal-time objective function (see abstract and col 2, ln 51-col 2, ln 2; cost analysis includes risk minimization. Apply different weights to categories of threats), and outputs the second contribution degrees in the emergency-time objective function through machine learning of second sample data relating to the emergency-time objective function (see again abstract; apply different weights to categories of threats. Measure how a population or area responds to threats. See also col 1, ln 29-44; use machine learning analysis). HUNTER further discloses and extracts, on a basis of the second contribution degrees, a prioritized normal-time objective function to be optimized with priority from the normal-time objective functions (see optimize a set of assets using an objective function across scenarios). HUNTER discloses resource allocation techniques that includes objective functions that are optimized for risk that consider how assets behave during a time of crisis. SHAKFEH discloses resilience measurement using objective functions that describe the ability to respond to threats. It would have been obvious for one of ordinary skill in the art at the time of invention to include the different weights for categories of threats as taught by SHAKFEH in the system executing the method of HUNTER with the motivation to minimize risk and optimize objectives over a time period that includes threats and crises. Claim(s) 2-6 and 9-13 is/are rejected under 35 U.S.C. 103 as being unpatentable over US 20100185557 A1 to HUNTER et al. and US 11615473 B2 to SHAKFEH as applied to claim 1 above, and further in view of US 20230316167 A1 to Suzuki et al. (hereinafter ‘SUZUKI’). Claim 2 The combination of HUNTER and SHAKFEH discloses the risk analysis method according to claim 1. The combination of HUNTER and SHAKFEH does not specifically disclose, but SUZUKI discloses, further comprising: by the processor, outputting the first contribution degrees in the prioritized normal-time objective function through machine learning of first sample data relating to the prioritized normal-time objective function and extracting the explanatory factors corresponding to a predetermined number of first contribution degrees in a descending order of the first contribution degrees (see ¶[0121]; adjust weights so that ranks are arranged in a descending order and match the priority ranks of input constraint conditions). HUNTER discloses resource allocation techniques that includes objective functions that are optimized for risk that consider how assets behave during a time of crisis. SUZUKI discloses optimization that arranges weights in descending order. It would have been obvious to arrange the weights as taught by SUZUKI in the system executing the method of HUNTER with the motivation to optimize a portfolio of assets. Claim 3 The combination of HUNTER, SHAKFEH, and SUZUKI discloses the risk analysis method according to claim 2. HUNTER does not specifically disclose, but SUZUKI discloses, further comprising: by the processor, managing the explanatory factors and countermeasures for reducing the risk in association with each other; and outputting the countermeasures corresponding to the extracted explanatory factors (see ¶[0121]; adjust weights so that ranks are arranged in a descending order and match the priority ranks of input constraint conditions). HUNTER discloses resource allocation techniques that includes objective functions that are optimized for risk that consider how assets behave during a time of crisis. SUZUKI discloses optimization that arranges weights in descending order. It would have been obvious to arrange the weights as taught by SUZUKI in the system executing the method of HUNTER with the motivation to optimize a portfolio of assets. Claim 4 The combination of HUNTER, SHAKFEH, and SUZUKI discloses the risk analysis method according to claim 2. HUNTER does not specifically disclose, but SHAKFEH discloses, wherein the processor outputs the first contribution degrees through machine learning for each sample of the first sample data (see col 1, ln 28-44; the method include machine learning for risk reduction). HUNTER discloses resource allocation techniques that includes objective functions that are optimized for risk that consider how assets behave during a time of crisis. SHAKFEH discloses resilience measurement using objective functions that describe the ability to respond to threats. It would have been obvious for one of ordinary skill in the art at the time of invention to include the different weights for categories of threats as taught by SHAKFEH in the system executing the method of HUNTER with the motivation to minimize risk and optimize objectives over a time period that includes threats and crises. Claim 5 The combination of HUNTER, SHAKFEH, and SUZUKI discloses the risk analysis method according to claim 3. HUNTER does not specifically disclose, but SUZUKI discloses, wherein the processor outputs, together with the countermeasures, priorities of the countermeasures corresponding to the explanatory factors which priorities depend on magnitudes of the predetermined number of first contribution degrees (see ¶[0121]; adjust weights so that ranks are arranged in a descending order and match the priority ranks of input constraint conditions). HUNTER discloses resource allocation techniques that includes objective functions that are optimized for risk that consider how assets behave during a time of crisis. SUZUKI discloses optimization that arranges weights in descending order. It would have been obvious to arrange the weights as taught by SUZUKI in the system executing the method of HUNTER with the motivation to optimize a portfolio of assets. Claim 6 The combination of HUNTER, SHAKFEH, and SUZUKI discloses the risk analysis method according to claim 3. HUNTER does not specifically disclose, but SHAKFEH discloses, wherein the risk is infection aggravation during an infection pandemic (see col 1, ln 20-25 and col 4, ln 37-65; analyze future events that impact individuals. Stakes may be high when it comes to pandemic potential), each of the explanatory factors is data relating to a health state of each subject (see col 1, ln 20-25 and col 4, ln 37-65; analyze future events that impact individuals. Stakes may be high when it comes to pandemic potential), each of the normal-time objective functions represents a relation between an infection situation of disease of each subject and each explanatory factor (see col 18, ln 52-col 19, ln 36; resilience relates to a set of relevant factors and objectives and weights), and the emergency-time objective function represents a relation between a situation of the infection aggravation during the infection pandemic and each normal-time objective function (see col 18, ln 52-col 19, ln 36; resilience relates to a set of relevant factors and objectives and weights). HUNTER discloses resource allocation techniques that includes objective functions that are optimized for risk that consider how assets behave during a time of crisis. SHAKFEH discloses resilience measurement using objective functions that describe the ability to respond to threats. It would have been obvious for one of ordinary skill in the art at the time of invention to include the different weights for categories of threats as taught by SHAKFEH in the system executing the method of HUNTER with the motivation to minimize risk and optimize objectives over a time period that includes threats and crises. Claim 9 The combination of HUNTER and SHAKFEH discloses the risk analysis system according to claim 8. The combination of HUNTER and SHAKFEH does not specifically disclose, but SUZUKI discloses, wherein the processor outputs the first contribution degrees in the prioritized normal-time objective function through machine learning of first sample data relating to the prioritized normal-time objective function and extracts the explanatory factors corresponding to a predetermined number of first contribution degrees in a descending order of the first contribution degrees (see ¶[0121]; adjust weights so that ranks are arranged in a descending order and match the priority ranks of input constraint conditions). HUNTER discloses resource allocation techniques that includes objective functions that are optimized for risk that consider how assets behave during a time of crisis. SUZUKI discloses optimization that arranges weights in descending order. It would have been obvious to arrange the weights as taught by SUZUKI in the system executing the method of HUNTER with the motivation to optimize a portfolio of assets. Claim 10 The combination of HUNTER, SHAKFEH, and SUZUKI discloses the risk analysis system according to claim 9. HUNTER does not specifically disclose, but SUZUKI discloses, wherein the processor manages the explanatory factors and countermeasures for reducing the risk in association with each other, and outputs the countermeasures corresponding to the extracted explanatory factors (see ¶[0121]; adjust weights so that ranks are arranged in a descending order and match the priority ranks of input constraint conditions). HUNTER discloses resource allocation techniques that includes objective functions that are optimized for risk that consider how assets behave during a time of crisis. SUZUKI discloses optimization that arranges weights in descending order. It would have been obvious to arrange the weights as taught by SUZUKI in the system executing the method of HUNTER with the motivation to optimize a portfolio of assets. Claim 11 The combination of HUNTER, SHAKFEH, and SUZUKI discloses the risk analysis system according to claim 9. HUNTER does not specifically disclose, but SHAKFEH discloses, the risk analysis system according to wherein the processor outputs the first contribution degrees through machine learning for each sample of the first sample data (see col 1, ln 28-44; the method include machine learning for risk reduction). HUNTER discloses resource allocation techniques that includes objective functions that are optimized for risk that consider how assets behave during a time of crisis. SHAKFEH discloses resilience measurement using objective functions that describe the ability to respond to threats. It would have been obvious for one of ordinary skill in the art at the time of invention to include the different weights for categories of threats as taught by SHAKFEH in the system executing the method of HUNTER with the motivation to minimize risk and optimize objectives over a time period that includes threats and crises. Claim 12 The combination of HUNTER, SHAKFEH, and SUZUKI discloses the risk analysis system according to claim 10. HUNTER does not specifically disclose, but SUZUKI discloses, wherein the processor outputs, together with the countermeasures, priorities of the countermeasures corresponding to the explanatory factors which priorities depend on magnitudes of the predetermined number of first contribution degrees (see ¶[0121]; adjust weights so that ranks are arranged in a descending order and match the priority ranks of input constraint conditions). HUNTER discloses resource allocation techniques that includes objective functions that are optimized for risk that consider how assets behave during a time of crisis. SUZUKI discloses optimization that arranges weights in descending order. It would have been obvious to arrange the weights as taught by SUZUKI in the system executing the method of HUNTER with the motivation to optimize a portfolio of assets. Claim 13 The combination of HUNTER, SHAKFEH, and SUZUKI discloses the risk analysis system according to claim 10. HUNTER does not specifically disclose, but SHAKFEH discloses, wherein the risk is infection aggravation during an infection pandemic (see col 1, ln 20-25 and col 4, ln 37-65; analyze future events that impact individuals. Stakes may be high when it comes to pandemic potential), each of the explanatory factors is data relating to a health state of each subject (see col 1, ln 20-25 and col 4, ln 37-65; analyze future events that impact individuals. Stakes may be high when it comes to pandemic potential), each of the normal-time objective functions represents a relation between an infection situation of each disease of each subject and each explanatory factor (see col 18, ln 52-col 19, ln 36; resilience relates to a set of relevant factors and objectives and weights), and the emergency-time objective function represents a relation between a situation of the infection aggravation during the infection pandemic and each normal-time objective function (see col 18, ln 52-col 19, ln 36; resilience relates to a set of relevant factors and objectives and weights). HUNTER discloses resource allocation techniques that includes objective functions that are optimized for risk that consider how assets behave during a time of crisis. SHAKFEH discloses resilience measurement using objective functions that describe the ability to respond to threats. It would have been obvious for one of ordinary skill in the art at the time of invention to include the different weights for categories of threats as taught by SHAKFEH in the system executing the method of HUNTER with the motivation to minimize risk and optimize objectives over a time period that includes threats and crises. Claim(s) 7 and 14 is/are rejected under 35 U.S.C. 103 as being unpatentable over US 20100185557 A1 to HUNTER et al., US 11615473 B2 to SHAKFEH , and US 20230316167 A1 to SUZUKI et al. as applied to claims 1 and 3 above, and further in view of US 20230316193 A1 to Coburn et al. (hereinafter’ COBURN’). Claim 7 The combination of HUNTER, SHAKFEH, and SUZUKI discloses the risk analysis method according to claim 3. The combination of HUNTER, SHAKFEH, and SUZUKI does not specifically disclose, but COBURN discloses, wherein the risk is delay in delivery of a product in an event of an earthquake (see ¶[0022] and [0042]; a number of products delayed. An earthquake), each of the explanatory factors is data relating to an operation of each factory that produces a component forming the product (see ¶[0166] industrial incidents), each of the normal-time objective functions represents a relation between number of days of delay in delivery of each component supplied by each factory and each explanatory factor (see ¶[0022]; downtime), and the emergency-time objective function represents a relation between number of days of delay in the delivery of the product in the event of the earthquake and each normal- time objective function (see again ¶[0022]; downtime). HUNTER discloses resource allocation techniques that includes objective functions that are optimized for risk that consider how assets behave during a time of crisis. COBURN discloses estimating risks on technical systems in times of an earthquake. It would have been obvious for one of ordinary skill in the art at the time of invention to include the estimation of risks as taught by COBURN in the system executing the method of HUNTER with the motivation to model risks in times of crisis. Claim 14 The combination of HUNTER, SHAKFEH, and SUZUKI discloses the risk analysis system according to claim 10. The combination of HUNTER, SHAKFEH, and SUZUKI does not specifically disclose, but COBURN discloses, wherein the risk is delay in delivery of a product in an event of an earthquake see ¶[0022] and [0042]; a number of products delayed. An earthquake), each of the explanatory factors is data relating to an operation of each factory that produces a component forming the product (see ¶[0166] industrial incidents), each of the normal-time objective functions represents a relation between number of days of delay in delivery of each component supplied by each factory and each explanatory factor (see ¶[0022]; downtime), and the emergency-time objective function represents a relation between number of days of delay in the delivery of the product in the event of the earthquake and each normal- time objective function (see again ¶[0022]; downtime). HUNTER discloses resource allocation techniques that includes objective functions that are optimized for risk that consider how assets behave during a time of crisis. COBURN discloses estimating risks on technical systems in times of an earthquake. It would have been obvious for one of ordinary skill in the art at the time of invention to include the estimation of risks as taught by COBURN in the system executing the method of HUNTER with the motivation to model risks in times of crisis. Conclusion Any inquiry concerning this communication or earlier communications from the examiner should be directed to RICHARD N SCHEUNEMANN whose telephone number is (571)270-7947. The examiner can normally be reached M-F 9am-5pm EST. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Patricia Munson can be reached at 571-270-5396. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /RICHARD N SCHEUNEMANN/ Primary Examiner, Art Unit 3624
Read full office action

Prosecution Timeline

Apr 28, 2025
Application Filed
Jun 09, 2026
Non-Final Rejection mailed — §101, §103
Aug 04, 2026
Response Filed
Oct 22, 2026
Final Rejection mailed — §101, §103 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12579549
PLATFORM FOR FACILITATING AN AUTOMATED IT AUDIT
4y 8m to grant Granted Mar 17, 2026
Patent 12535999
A METHOD FOR EXECUTION OF A MACHINE LEARNING MODEL ON MEMORY RESTRICTED INDUSTRIAL DEVICE
6y 4m to grant Granted Jan 27, 2026
Patent 12033094
AUTOMATIC GENERATION OF TASKS AND RETRAINING MACHINE LEARNING MODULES TO GENERATE TASKS BASED ON FEEDBACK FOR THE GENERATED TASKS
4y 9m to grant Granted Jul 09, 2024
Patent 12026624
System and Method For Loss Function Metalearning For Faster, More Accurate Training, and Smaller Datasets
4y 1m to grant Granted Jul 02, 2024
Patent 11836746
AUTO-ENCODER ENHANCED SELF-DIAGNOSTIC COMPONENTS FOR MODEL MONITORING
9y 0m to grant Granted Dec 05, 2023
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

3-4
Expected OA Rounds
6%
Grant Probability
14%
With Interview (+8.3%)
3y 11m (~2y 5m remaining)
Median Time to Grant
Moderate
PTA Risk
Based on 561 resolved cases by this examiner. Grant probability derived from career allowance rate.