DETAILED ACTION
Notice of Pre-AIA or AIA Status
The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA .
Double Patenting
The nonstatutory double patenting rejection is based on a judicially created doctrine grounded in public policy (a policy reflected in the statute) so as to prevent the unjustified or improper timewise extension of the “right to exclude” granted by a patent and to prevent possible harassment by multiple assignees. A nonstatutory double patenting rejection is appropriate where the conflicting claims are not identical, but at least one examined application claim is not patentably distinct from the reference claim(s) because the examined application claim is either anticipated by, or would have been obvious over, the reference claim(s). See, e.g., In re Berg, 140 F.3d 1428, 46 USPQ2d 1226 (Fed. Cir. 1998); In re Goodman, 11 F.3d 1046, 29 USPQ2d 2010 (Fed. Cir. 1993); In re Longi, 759 F.2d 887, 225 USPQ 645 (Fed. Cir. 1985); In re Van Ornum, 686 F.2d 937, 214 USPQ 761 (CCPA 1982); In re Vogel, 422 F.2d 438, 164 USPQ 619 (CCPA 1970); In re Thorington, 418 F.2d 528, 163 USPQ 644 (CCPA 1969).
A timely filed terminal disclaimer in compliance with 37 CFR 1.321(c) or 1.321(d) may be used to overcome an actual or provisional rejection based on nonstatutory double patenting provided the reference application or patent either is shown to be commonly owned with the examined application, or claims an invention made as a result of activities undertaken within the scope of a joint research agreement. See MPEP § 717.02 for applications subject to examination under the first inventor to file provisions of the AIA as explained in MPEP § 2159. See MPEP §§ 706.02(l)(1) - 706.02(l)(3) for applications not subject to examination under the first inventor to file provisions of the AIA . A terminal disclaimer must be signed in compliance with 37 CFR 1.321(b).
The USPTO Internet website contains terminal disclaimer forms which may be used. Please visit www.uspto.gov/patent/patents-forms. The filing date of the application in which the form is filed determines what form (e.g., PTO/SB/25, PTO/SB/26, PTO/AIA /25, or PTO/AIA /26) should be used. A web-based eTerminal Disclaimer may be filled out completely online using web-screens. An eTerminal Disclaimer that meets all requirements is auto-processed and approved immediately upon submission. For more information about eTerminal Disclaimers, refer to www.uspto.gov/patents/process/file/efs/guidance/eTD-info-I.jsp.
Application 19281493 and US Patent 12375395
Claim 1 is non-provisionally rejected on the ground of nonstatutory double patenting (anticipated) over claim 1 of US Patent 12375395. Limitations of the claim 1 in the instant application 19281493 “determining a cluster of shared infrastructure components, wherein a set of deployed applications of a plurality of deployed applications is executing on the cluster of shared infrastructure components”, and the limitation in claim 1 in the Patent 12375395 “determining a cluster of shared infrastructure components of a first data center region based on infrastructure monitoring data associated with a plurality of deployed applications, wherein a set of deployed applications of the plurality of deployed applications is executing on the cluster of shared infrastructure components” have similar subject matters.
Furthermore, Limitations of the claim 1 in the instant application 19281493 “determining a set of intermittent components in communication with the cluster of shared infrastructure components”, and the limitation in claim 1 in the Patent 12375395 “determining a set of intermittent components in communication with the cluster of shared infrastructure components” have similar subject matters.
Furthermore, Limitations of the claim 1 in the instant application 19281493 “probing the set of intermittent components with a set of probing messages without using messages generated by the set of deployed applications to communicate with the set of intermittent components”, and the limitation in claim 1 in the Patent 12375395 “probing the set of intermittent components with a set of probing messages without using messages generated by the set of deployed applications to communicate with the set of intermittent components” have similar subject matters.
Furthermore, Limitations of the claim 1 in the instant application 19281493 “obtaining a set of responses from the set of intermittent components associated with the set of probing messages”, and the limitation in claim 1 in the Patent 12375395 “obtaining a set of responses from the set of intermittent components associated with the set of probing messages” have similar subject matters.
Furthermore, Limitations of the claim 1 in the instant application 19281493 “determining a combined resource value based on performance data associated with the set of deployed applications by: generating a performance requirement based on performance metrics associated with the set of deployed applications; and predicting the combined resource value based on the performance requirement and configuration data associated with the set of deployed applications”, and the limitation in claim 1 in the Patent 12375395 “determining a combined resource value based on performance data associated with the set of deployed applications by: generating a performance requirement based on performance metrics associated with the set of deployed applications; and predicting the combined resource value based on the performance requirement and configuration data associated with the set of deployed applications” have similar subject matters.
Furthermore, Limitations of the claim 1 in the instant application 19281493 “generating a set of predictions indicating a likelihood of a latency or a resource availability by providing a prediction model with the set of responses”, and the limitation in claim 1 in the Patent 12375395 “generating a set of predictions indicating a likelihood of a latency failure or a resource availability failure by providing a prediction model with the set of responses” have similar subject matters.
Claim 2 is non-provisionally rejected on the ground of nonstatutory double patenting (anticipated) over claim 2 of US Patent 12375395. Limitations of the claim 2 in the instant application 19281493 “determining a set of shared components, wherein a set of deployed applications is executing on the set of shared components”, and the limitation in claim 2 in the Patent 12375395 “determining a set of shared components of a first data center region based on infrastructure monitoring data, wherein a set of deployed applications is executing on the set of shared components” have similar subject matters.
Furthermore, Limitations of the claim 2 in the instant application 19281493 “determining a set of intermittent components in communication with the set of shared components”, and the limitation in claim 2 in the Patent 12375395 “determining a set of intermittent components in communication with the set of shared components based on the infrastructure monitoring data and an activity gap threshold” have similar subject matters.
Furthermore, Limitations of the claim 2 in the instant application 19281493 “probing the set of intermittent components with a set of probing messages”, and the limitation in claim 2 in the Patent 12375395 “probing the set of intermittent components with a set of probing messages without using messages generated by the set of deployed applications” have similar subject matters.
Furthermore, Limitations of the claim 2 in the instant application 19281493 “obtaining a set of responses from the set of intermittent components associated with the set of probing messages”, and the limitation in claim 2 in the Patent 12375395 “obtaining a set of responses from the set of intermittent components associated with the set of probing messages” have similar subject matters.
Furthermore, Limitations of the claim 2 in the instant application 19281493 “determining a combined resource value based on performance data associated with the set of deployed applications by: generating a performance requirement based on performance metrics associated with the set of deployed applications; and predicting the combined resource value based on the performance requirement”, and the limitation in claim 2 in the Patent 12375395 “determining a combined resource value based on performance data associated with the set of deployed applications by: generating a performance requirement based on performance metrics associated with the set of deployed applications; and predicting the combined resource value based on the performance requirement and configuration data associated with the set of deployed applications” have similar subject matters.
Furthermore, Limitations of the claim 2 in the instant application 19281493 “determining a result indicating that the set of responses satisfies a set of criteria by providing the set of responses to a prediction model to generate a set of predictions indicating a likelihood of a latency or a resource availability”, and the limitation in claim 2 in the Patent 12375395 “determining a result indicating that the set of responses satisfies a set of region-switching criteria by providing the set of responses to a prediction model to generate a set of predictions indicating a likelihood of a latency failure or a resource availability failure” have similar subject matters.
Claims 3, and 13 are non-provisionally rejected on the ground of nonstatutory double patenting (anticipated) over claim 3 of US Patent 12375395. Limitations of the Claims 3, and 13 in the instant application 19281493 “wherein the result is a first result, wherein the set of responses is a first set of responses, further comprising: directing network traffic of the set of deployed applications; obtaining a second set of responses from the set of intermittent components; and determining a second result indicating that the second set of responses does not satisfy the set of criteria”, and the limitation in claim 3 in the Patent 12375395 “directing network traffic of the set of deployed applications to the second data center region; obtaining a second set of responses from the set of intermittent components; determining a second result indicating that the second set of responses does not satisfy the set of region-switching criteria” have similar subject matters.
Claim 4, 14 are non-provisionally rejected on the ground of nonstatutory double patenting (anticipated) over claim 3 of US Patent 12375395. Limitations of the Claim 4, 14 in the instant application 19281493 “based on the second result, redirecting the network traffic of a first application of the set of deployed applications; obtaining a third set of responses from the set of intermittent components;
determining a third result indicating that the third set of responses does not satisfy the set of criteria; and based on the third result, redirecting the network traffic of a second application of the set of deployed applications”, and the limitation in claim 3 in the Patent 12375395 “based on the second result, redirecting network traffic of a first application of the set of deployed applications to the first data center region; obtaining a third set of responses from the set of intermittent components; determining a third result indicating that the third set of responses does not satisfy the set of region-switching criteria; and based on the third result, redirecting network traffic of a second application of the set of deployed applications to the first data center region” have similar subject matters.
Claims 5 and 15 are non-provisionally rejected on the ground of nonstatutory double patenting (anticipated) over claim 4 of US Patent 12375395. Limitations of the claims 5, and 15 in the instant application 19281493 “determining a first priority score for a first application based on a first network traffic metric of the first application indicating a first number of users within a geographical region corresponding to a first data center region; determining a second priority score for a second application based on a second network traffic metric of the second application indicating a second number of users within the geographical region, wherein redirecting network traffic of the first application comprises selecting the network traffic of the first application for re-direction in lieu of the network traffic of the second application based on a comparison between the first priority score and the second priority score”, and the limitation in claim 4 in the Patent 12375395 “determining a first priority score for the first application based on a first network traffic metric of the first application indicating a first number of users within a geographical region corresponding to the first data center region; determining a second priority score for the second application based on a second network traffic metric of the second application indicating a second number of users within the geographical region, wherein redirecting the network traffic of the first application comprises selecting the network traffic of the first application for re-direction in lieu of the network traffic of the second application based on a comparison between the first priority score and the second priority score” have similar subject matters.
Claims 6 and 16 are non-provisionally rejected on the ground of nonstatutory double patenting (anticipated) over claim 5 of US Patent 12375395. Limitations of the claims 6 and 16 in the instant application 19281493 “broadcasting a set of performance metrics of a data center zone of a second data center region to a set of other data center regions, wherein: the set of other data center regions comprises a first data center region; and the set of performance metrics comprises the latency, wherein provisioning a second set of infrastructure resources of the second data center region comprises selecting the second data center region based on the latency”, and the limitation in claim 5 in the Patent 12375395 “broadcasting a set of performance metrics of a data center zone of the second data center region to a set of other data center regions, wherein: the set of other data center regions comprises the first data center region; and the set of performance metrics comprises a latency, wherein provisioning the second set of infrastructure resources of the second data center region comprises selecting the second data center region based on the latency” have similar subject matters.
Claim 7, and 17 are non-provisionally rejected on the ground of nonstatutory double patenting (anticipated) over claim 6 of US Patent 12375395. Limitations of the claims 7 and 17 in the instant application 19281493 “obtaining a set of network latency measurements corresponding to a plurality of data center regions; and selecting a second data center region of the plurality of data center regions based on a comparison between the combined resource value and the set of network latency measurements”, and the limitation in claim 6 in the Patent 12375395 “obtaining a set of network latency measurements corresponding to the plurality of data center regions; and selecting the second data center region of the plurality of data center regions based on a comparison between the combined resource value and the set of network latency measurements” have similar subject matters.
Claims 8 and 18 are non-provisionally rejected on the ground of nonstatutory double patenting (anticipated) over claim 7 of US Patent 12375395. Limitations of the claims 8, and 18 in the instant application 19281493 “obtaining the set of responses comprises obtaining a warning that a backup database of a first database is not storing data; and determining the result indicating that the set of responses satisfies the set of criteria comprises determining that the warning satisfies a region-switching criterion of the set of criteria”, and the limitation in claim 7 in the Patent 12375395 “obtaining the set of responses comprises obtaining a warning that a backup database of the first database is not storing data; and determining the result indicating that the set of responses satisfies the set of region-switching criteria comprises determining that the warning satisfies a region-switching criterion of the set of region-switching criteria” have similar subject matters.
Claims 9, and 19 are non-provisionally rejected on the ground of nonstatutory double patenting (anticipated) over claim 8 of US Patent 12375395. Limitations of the claims 9, and 19 in the instant application 19281493 “determining the result indicates that the performance metrics associated with a set of data center zones in a first data center region do not satisfy the combined resource value; and provisioning a second set of infrastructure resources based on the result”, and the limitation in claim 8 in the Patent 12375395 “determining a second result indicating that performance metrics associated with a set of data center zones in the first data center region do not satisfy the combined resource value; and provisioning the second set of infrastructure resources based on the second result” have similar subject matters.
Claims 10 and 20 are non-provisionally rejected on the ground of nonstatutory double patenting (anticipated) over claim 9 of US Patent 12375395. Limitations of the claims 10, and 20 in the instant application 19281493 “detecting an increase in network activity associated with an application of the set of deployed applications; and increasing a probing rate in response to the detection of the increase in the network activity” and the limitation in claim 9 in the Patent 12375395 “detecting an increase in network activity associated with an application of the set of deployed applications; and increasing the probing rate in response to the detection of the increase in network activity” have similar subject matters.
Claim 11 is non-provisionally rejected on the ground of nonstatutory double patenting (anticipated) over claim 10 of US Patent 12375395. Limitations of the claim 11 in the instant application 19281493 “identifying a set of critical component requirements based on application data associated with the set of deployed applications; and determining a second result indicating that the set of critical component requirements is satisfied based on identified resources of a data center region” and the limitation in claim 10 in the Patent 12375395 “identifying a set of critical component requirements based on application data associated with the set of deployed applications; and determining a second result indicating that the set of critical component requirements is satisfied based on identified resources of the second data center region” have similar subject matters.
Claim 12 is non-provisionally rejected on the ground of nonstatutory double patenting (anticipated) over claim 11 of US Patent 12375395. Limitations of the claim 12 in the instant application 19281493 “determining a set of shared components, wherein a set of deployed applications is executing on the set of shared components”, and the limitation in claim 11 in the Patent 12375395 “determining a set of shared components of a first data center region based on monitoring data, wherein a set of deployed applications is executing on the set of shared components” have similar subject matters.
Furthermore, Limitations of the claim 12 in the instant application 19281493 “determining a set of intermittent components in communication with the set of shared components”, and the limitation in claim 11 in the Patent 12375395 “determining a set of intermittent components associated with the set of shared components” have similar subject matters.
Furthermore, Limitations of the claim 12 in the instant application 19281493 “probing the set of intermittent components with a set of probing messages”, and the limitation in claim 11 in the Patent 12375395 “probing the set of intermittent components with a set of probing messages” have similar subject matters.
Furthermore, Limitations of the claim 12 in the instant application 19281493 “obtaining a set of responses from the set of intermittent components associated with the set of probing messages”, and the limitation in claim 11 in the Patent 12375395 “obtaining a set of responses from the set of intermittent components associated with the set of probing messages” have similar subject matters.
Furthermore, Limitations of the claim 12 in the instant application 19281493 “determining a combined resource value based on performance data associated with the set of deployed applications by: generating a performance requirement based on performance metrics associated with the set of deployed applications; and predicting the combined resource value based on the performance requirement”, and the limitation in claim 11 in the Patent 12375395 “determining a combined resource value based on performance data associated with the set of deployed applications by: generating a performance requirement based on performance metrics associated with the set of deployed applications; and predicting the combined resource value based on the performance requirement and configuration data associated with the set of deployed applications” have similar subject matters.
Furthermore, Limitations of the claim 12 in the instant application 19281493 “determining a result indicating that the set of responses satisfies a set of criteria by providing the set of responses to a prediction model to generate a set of predictions indicating a likelihood of a latency or a resource availability”, and the limitation in claim 11 in the Patent 12375395 “determining whether the set of responses satisfies a set of region-switching criteria by providing the set of responses to a prediction model to generate a set of predictions indicating a likelihood of a latency failure or a resource availability failure” have similar subject matters.
Allowable Subject Matter
Claims 1-20 would be allowable if overcoming the double patenting rejection set forth in this office action.
The following is the reason for allowable subject matter in claim 1.
The closest prior arts of record (“Janakiraman”, US 20230318947 A1), (“Metz”, US 20140280338 A1), (“Wallace”, US 12010007 B1) fail to fairly teach or suggest identifying a group of shared elements in having a group of applications, wherein a group of applications are running on group of shared elements, identifying a group of intermittent elements connected to the group of shared elements based on the monitoring data and threshold, conduct a probing on the group of intermittent elements with certain probing messages, collecting a group of responses related to the probing messages, identifying a combined resource value based on the performance information of group of the applications, generating a performance attribute base on the performance values of the group of the applications, forecasting the coming resource value based on the performance attribute and setting data associated with the group of applications, producing a group of forecasts pointing the probability of delay or resource availability by using a machine learning model and group of responses.
The following is the reason for allowable subject matter in claims 2, and 12.
The closest prior arts of record (“Janakiraman”, US 20230318947 A1), (“Metz”, US 20140280338 A1), (“Wallace”, US 12010007 B1) fail to fairly teach or suggest identifying a group of shared elements in having a group of applications, wherein a group of applications are running on group of shared elements, identifying a group of intermittent elements connected to the group of shared elements based on the monitoring data and threshold, conduct a probing on the group of intermittent elements with certain probing messages, collecting a group of responses related to the probing messages, identifying a combined resource value based on the performance information of group of the applications, generating a performance attribute base on the performance values of the group of the applications, forecasting the coming resource value based on the performance attribute and setting data associated with the group of applications, producing a group of forecasts pointing the probability of delay or resource availability by using a machine learning model and group of responses.
Thus, no other prior art of record fairly teaches or suggests the instant claims as a whole.
Conclusion
Any inquiry concerning this communication or earlier communications from the examiner should be directed to FADI HAJ SAID whose telephone number is (571)272-2833. The examiner can normally be reached on 8:00 AM - 5:00 PM EST. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, John Follansbee can be reached on 571-272-3964. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300.
Information regarding the status of an application may be obtained from the Patent Application Information Retrieval (PAIR) system. Status information for published applications may be obtained from either Private PAIR or Public PAIR. Status information for unpublished applications is available through Private PAIR only. For more information about the PAIR system, see https://ppair-my.uspto.gov/pair/PrivatePair. Should you have questions on access to the Private PAIR system, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative or access to the automated information system, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000.
/FADI HAJ SAID/Primary Examiner, Art Unit 2444