Prosecution Insights
Last updated: November 04, 2026
Application No. 19/341,428

POWER GENERATION SYSTEM USING A THERMOCHEMICAL ENERGY STORAGE SYSTEM OR A THERMAL ENERGY STORAGE SYSTEM

Non-Final OA §102§103§112
Filed
Sep 26, 2025
Priority
Sep 26, 2024 — provisional 63/699,267
Examiner
SINGH, DAPINDER
Art Unit
3746
Tech Center
3700 — Mechanical Engineering & Manufacturing
Assignee
Redoxblox Inc.
OA Round
1 (Non-Final)
82%
Grant Probability
Favorable
1-2
OA Rounds
1y 0m
Est. Remaining
99%
With Interview

Examiner Intelligence

Grants 82% — above average
82%
Career Allowance Rate
740 granted / 897 resolved
+12.5% vs TC avg
Strong +19% interview lift
Without
With
+18.6%
Interview Lift
resolved cases with interview
Fast prosecutor
2y 2m
Avg Prosecution
18 currently pending
Career history
919
Total Applications
across all art units

Statute-Specific Performance

§101
4.2%
-35.8% vs TC avg
§103
37.6%
-2.4% vs TC avg
§102
31.9%
-8.1% vs TC avg
§112
22.3%
-17.7% vs TC avg
Black line = Tech Center average estimate • Based on career data from 897 resolved cases

Office Action

§102 §103 §112
DETAILED ACTION Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . Election/Restrictions Applicant’s election without traverse of claims 1-6, 20-26 in the reply filed on 10/12/2026 is acknowledged. Claims 7-11 withdrawn from further consideration pursuant to 37 CFR 1.142(b) as being drawn to a nonelected Invention Group II, there being no allowable generic or linking claim. Election was made without traverse in the reply filed on 10/12/2026. Claim Rejections - 35 USC § 112 The following is a quotation of the first paragraph of 35 U.S.C. 112(a): (a) IN GENERAL.—The specification shall contain a written description of the invention, and of the manner and process of making and using it, in such full, clear, concise, and exact terms as to enable any person skilled in the art to which it pertains, or with which it is most nearly connected, to make and use the same, and shall set forth the best mode contemplated by the inventor or joint inventor of carrying out the invention. The following is a quotation of the first paragraph of pre-AIA 35 U.S.C. 112: The specification shall contain a written description of the invention, and of the manner and process of making and using it, in such full, clear, concise, and exact terms as to enable any person skilled in the art to which it pertains, or with which it is most nearly connected, to make and use the same, and shall set forth the best mode contemplated by the inventor of carrying out his invention. Claims 21, 22 rejected under 35 U.S.C. 112(a) or 35 U.S.C. 112 (pre-AIA ), first paragraph, as failing to comply with the written description requirement. The claim(s) contains subject matter which was not described in the specification in such a way as to reasonably convey to one skilled in the relevant art that the inventor or a joint inventor, or for applications subject to pre-AIA 35 U.S.C. 112, the inventor(s), at the time the application was filed, had possession of the claimed invention. Newly added claim 21 recites a negative limitation “without an external heater being embedded within the energy storage material” that is not supported by specification. “Any negative limitation or exclusionary proviso must have basis in the original disclosure. If alternative elements are positively recited in the specification, they may be explicitly excluded in the claims.” (MPEP 2173.05(i). Therefore, the claim is rejected for adding new matter not supported by specification. Newly added claim 22 recited the limitation “the controller is further configured to determine the threshold temperature based at least in part on a forecasted demand received from an electrical grid infrastructure in data communication with the power generation system” (emphasis added) which is not supported by specification. Specification or drawings provide no support of the claimed “forecasted demand”. As such, the claim is rejected for adding new matter not supported by specification. The following is a quotation of 35 U.S.C. 112(b): (b) CONCLUSION.—The specification shall conclude with one or more claims particularly pointing out and distinctly claiming the subject matter which the inventor or a joint inventor regards as the invention. The following is a quotation of 35 U.S.C. 112 (pre-AIA ), second paragraph: The specification shall conclude with one or more claims particularly pointing out and distinctly claiming the subject matter which the applicant regards as his invention. Claims 1-6, 20-26 are rejected under 35 U.S.C. 112(b) or 35 U.S.C. 112 (pre-AIA ), second paragraph, as being indefinite for failing to particularly point out and distinctly claim the subject matter which the inventor or a joint inventor (or for applications subject to pre-AIA 35 U.S.C. 112, the applicant), regards as the invention. Claim 1 recites the limitation "the energy storage material" in line 5. There is insufficient antecedent basis for this limitation in the claim. Claim 5 recites the limitation "the ejector system” in lines 3-4. There is insufficient antecedent basis for this limitation in the claim. Claim Rejections - 35 USC § 102 In the event the determination of the status of the application as subject to AIA 35 U.S.C. 102 and 103 (or as subject to pre-AIA 35 U.S.C. 102 and 103) is incorrect, any correction of the statutory basis (i.e., changing from AIA to pre-AIA ) for the rejection will not be considered a new ground of rejection if the prior art relied upon, and the rationale supporting the rejection, would be the same under either status. The following is a quotation of the appropriate paragraphs of 35 U.S.C. 102 that form the basis for the rejections under this section made in this Office action: A person shall be entitled to a patent unless – (a)(1) the claimed invention was patented, described in a printed publication, or in public use, on sale, or otherwise available to the public before the effective filing date of the claimed invention. Claim(s) 1-3, 20-23, 25-26 is/are rejected under 35 U.S.C. 102(a)(1) as being anticipated by US 2022/0170386 to O’Donnell et al (O’Donnell). Regarding claim 1, O’Donnell discloses a power generation system, comprising: a thermal energy storage (TES) device ([7]-[10], [155], fig. 1) or a thermochemical energy storage (TCES) device ([7]-[10], [155], fig. 1) that is configured to increase a thermal energy storage capacity or a thermochemical energy storage capacity by passing an electrical current directly through the energy storage material (14, fig. 1; [26, [158]); and a controller (15, fig. 1) that is configured to operate the power generation system in a charging mode (157]-[161], [169], [261]), the controller being configured to: receive a charge signal ([169], [264]); initiate a charging mode for the TES device or the TCES device based at least in part on the charge signal ([261]-[265]), the charging mode being initiated causes the electrical current to pass directly through the energy storage material; and terminate the charging mode based at least in part on a threshold temperature being reached or according to another signal from the controller ([169], [265]-[267]). Regarding claim 2, O’Donnell discloses the power generation system of claim 1, wherein the charge signal represents an instruction for operating the charging mode while simultaneously operating a discharging mode for discharging a heated gas out of the TES device or the TCES device ([169], [180]-[185], [261]-[267]). Regarding claim 3, O’Donnell discloses the power generation system of claim 1, further comprising an oxygen extraction system that is configured to remove oxygen generated by a reduction reaction from an interior portion of the TCES device ([10], [531], [669], [685], [694]). Regarding claim 20, O’Donnell discloses the power generation system of claim 1, wherein the controller is further configured to operate the power generation system in a charging while discharging mode in which the charging mode is performed simultaneously with a discharging mode ([157]-[158], [261]-[262]), the electrical current being passed through the energy storage material while a heated gas is discharged from the TES device or the TCES device to a turbine coupled to an electrical generator ([49], [158]. [261]). Regarding claim 21, O’Donnell discloses the power generation system of claim 1, wherein the electrical current is configured to be passed through the energy storage material to heat the energy storage material by Joule heating without an external heater being embedded within the energy storage material ([26]). Regarding claim 22, O’Donnell discloses the power generation system of claim 1, wherein the controller is further configured to determine the threshold temperature based at least in part on a forecasted demand received from an electrical grid infrastructure in data communication with the power generation system ([162]). Regarding claim 23, O’Donnell discloses the power generation system of claim 1, wherein the controller is further configured to receive a discharge signal ([157]-[158], [261]-[262]) and, based at least in part on the discharge signal, to initiate a discharging mode in which a compressor provides a gas to the TES device or the TCES device to generate a heated gas that is used to power directly or indirectly a turbine coupled to an electrical generator ([812]). Regarding claim 25, O’Donnell discloses the power generation system of claim 1, further comprising a power transformer that is configured to adjust a line voltage to a voltage value used by the TES device or the TCES device ([606], [625]), and a power controller that is configured to input a controlled amount of electricity into the TES device or the TCES device according to a prescribed power rating ([625]-[632]). Regarding claim 26, O’Donnell discloses the power generation system of claim 1, further comprising a mixing valve (419, fig. 4) that is configured to combine a bypass gas with a heated gas discharged from the TES device or the TCES device to produce a mixed gas having a temperature suitable to power directly or indirectly a turbine coupled to an electrical generator ([176]-[177]). Claim Rejections - 35 USC § 103 In the event the determination of the status of the application as subject to AIA 35 U.S.C. 102 and 103 (or as subject to pre-AIA 35 U.S.C. 102 and 103) is incorrect, any correction of the statutory basis (i.e., changing from AIA to pre-AIA ) for the rejection will not be considered a new ground of rejection if the prior art relied upon, and the rationale supporting the rejection, would be the same under either status. The following is a quotation of 35 U.S.C. 103 which forms the basis for all obviousness rejections set forth in this Office action: A patent for a claimed invention may not be obtained, notwithstanding that the claimed invention is not identically disclosed as set forth in section 102, if the differences between the claimed invention and the prior art are such that the claimed invention as a whole would have been obvious before the effective filing date of the claimed invention to a person having ordinary skill in the art to which the claimed invention pertains. Patentability shall not be negated by the manner in which the invention was made. This application currently names joint inventors. In considering patentability of the claims the examiner presumes that the subject matter of the various claims was commonly owned as of the effective filing date of the claimed invention(s) absent any evidence to the contrary. Applicant is advised of the obligation under 37 CFR 1.56 to point out the inventor and effective filing dates of each claim that was not commonly owned as of the effective filing date of the later invention in order for the examiner to consider the applicability of 35 U.S.C. 102(b)(2)(C) for any potential 35 U.S.C. 102(a)(2) prior art against the later invention. Claim(s) 4-6 is/are rejected under 35 U.S.C. 103 as being unpatentable over O’Donnell in view of US 2021/0325124 to Klausner et al (Klausner). Regarding claim 4, O’Donnell discloses the power generation system of claim 3, but does not explicitly disclose which O’Donnell discloses: the oxygen extraction system (fig. 3; [70]-[74]) comprises: an ejector system (fig. 3; [70]-[74]) that is in fluid connection with an oxygen valve (92, fig. 3; [70]-[74]) and receives oxygen extracted from an interior of the TCES device when the oxygen valve is opened; and an atmospheric blower (50, fig. 3)that provides a flow of ambient air to the ejector system, the flow of ambient air generates a suction force for extracting the oxygen from the interior of the TCES device. Therefore, it would have been obvious to the one with ordinary skill in the art, before the effective filing date of the claimed invention, to have the Oxygen extraction system of Klausner with the device of O’Donnell so as to provide a consistent temperature to the turbine ([73]; Klausner). Regarding claim 5, O’Donnell discloses the power generation system of claim 1, further comprising an oxygen extraction system ([10], [531], [669], [685], [694]), but does not explicitly disclose which O’Donnell discloses: the oxygen extraction system (fig. 3; [70]-[74]) comprises: a blower valve (92, fig. 3) that is situated in a fluid connection between the ejector system and the atmospheric blower; and an ambient valve (108, fig. 3) is situated in a fluid connection between the ejector system and an ambient exit opening, the oxygen is extracted and released through the ambient exit opening ([70]-[74]). Therefore, it would have been obvious to the one with ordinary skill in the art, before the effective filing date of the claimed invention, to have the Oxygen extraction system of Klausner with the device of O’Donnell so as to provide a consistent temperature to the turbine ([73]; Klausner). Regarding claim 6, O’Donnell discloses the power generation system of claim 1, further comprising an oxygen extraction system ([10], [531], [669], [685], [694]) that comprises: a heat exchanger that is in fluid connection with the TCES device ([41]-[44], [175]), but does not explicitly disclose which O’Donnell discloses: the oxygen extraction system (fig. 3; [70]-[74]) comprises: a heat exchanger (10, fig. 3) that is in fluid connection with the TCES device, the heat exchanger being configured to receive extracted oxygen from the TCES device when an oxygen valve (92, fig. 3; [68]-[74]) is opened; and an atmospheric blower (82, fig. 3) that is in fluid connection with the heat exchanger and an ambient exit opening, the oxygen extracted from the TCES device being released through the ambient exit opening (fig. 3). Therefore, it would have been obvious to the one with ordinary skill in the art, before the effective filing date of the claimed invention, to have the Oxygen extraction system of Klausner with the device of O’Donnell so as to provide a consistent temperature to the turbine ([73]; Klausner). Allowable Subject Matter Claim 24 is objected to as being dependent upon a rejected base claim, but would be allowable if rewritten in independent form including all of the limitations of the base claim and any intervening claims. Conclusion The prior art made of record and not relied upon is considered pertinent to applicant's disclosure. US 11,923,682 to Kanan US 11,782,399 to Buttgenbach et al. US 11,404,871 to Hansen et al. US 2021/0273483 to Ding et al. US 2015/0240784 to Sagi et al. US 2010/0138062 to Zheng et al. All references above describe general state of art. Any inquiry concerning this communication or earlier communications from the examiner should be directed to DAPINDER SINGH whose telephone number is (571)270-1774. The examiner can normally be reached Monday to Friday from 8:00 AM to 5:30 PM. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Mark Laurenzi can be reached at (571) 270-7878. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /DAPINDER SINGH/Primary Examiner, Art Unit 3746
Read full office action

Prosecution Timeline

Sep 26, 2025
Application Filed
Oct 22, 2026
Non-Final Rejection mailed — §102, §103, §112 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12779421
Sparger and Reactor Comprising the Same
3y 7m to grant Granted Nov 03, 2026
Patent 12781648
ENGINE BRAKE HYDRAULIC CAPSULE WITH PLUNGER RETURN MECHANISM
1y 3m to grant Granted Nov 03, 2026
Patent 12773665
TREATMENT DEVICE FOR SEMICONDUCTOR MANUFACTURING EXHAUST GAS
3y 3m to grant Granted Oct 27, 2026
Patent 12767027
SHAPE-MEMORY ALLOY ACTUATOR ASSEMBLY
1y 10m to grant Granted Oct 20, 2026
Patent 12768345
Parallel Pumping Controller with Load Sharing and Systems Including the Same
1y 0m to grant Granted Oct 20, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

1-2
Expected OA Rounds
82%
Grant Probability
99%
With Interview (+18.6%)
2y 2m (~1y 0m remaining)
Median Time to Grant
Low
PTA Risk
Based on 897 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month