Prosecution Insights
Last updated: November 21, 2026
Application No. 19/440,893

DUAL PUMP SYSTEM AND METHOD TO CONTROL WAVESOLDER CONTACT LENGTH

Final Rejection §112
Filed
Jan 06, 2026
Priority
Dec 16, 2024 — continuation of 12/543,271
Examiner
STONER, KILEY SHAWN
Art Unit
1735
Tech Center
1700 — Chemical & Materials Engineering
Assignee
Illinois Tool Works Inc.
OA Round
2 (Final)
81%
Grant Probability
Favorable
3-4
OA Rounds
1y 2m
Est. Remaining
96%
With Interview

Examiner Intelligence

Grants 81% — above average
81%
Career Allowance Rate
1181 granted / 1463 resolved
+15.7% vs TC avg
Strong +16% interview lift
Without
With
+15.5%
Interview Lift
resolved cases with interview
Fast prosecutor
2y 1m
Avg Prosecution
41 currently pending
Career history
1518
Total Applications
across all art units

Statute-Specific Performance

§101
0.4%
-39.6% vs TC avg
§103
45.4%
+5.4% vs TC avg
§102
27.6%
-12.4% vs TC avg
§112
21.3%
-18.7% vs TC avg
Black line = Tech Center average estimate • Based on career data from 1463 resolved cases

Office Action

§112
DETAILED ACTION Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . Claim Rejections - 35 USC § 112 The following is a quotation of the first paragraph of 35 U.S.C. 112(a): (a) IN GENERAL.—The specification shall contain a written description of the invention, and of the manner and process of making and using it, in such full, clear, concise, and exact terms as to enable any person skilled in the art to which it pertains, or with which it is most nearly connected, to make and use the same, and shall set forth the best mode contemplated by the inventor or joint inventor of carrying out the invention. The following is a quotation of the first paragraph of pre-AIA 35 U.S.C. 112: The specification shall contain a written description of the invention, and of the manner and process of making and using it, in such full, clear, concise, and exact terms as to enable any person skilled in the art to which it pertains, or with which it is most nearly connected, to make and use the same, and shall set forth the best mode contemplated by the inventor of carrying out his invention. Claims 1-6, 8-12, 15-18, and 20 are rejected under 35 U.S.C. 112(a) or 35 U.S.C. 112 (pre-AIA ), first paragraph, as failing to comply with the written description requirement. The claim(s) contains subject matter which was not described in the specification in such a way as to reasonably convey to one skilled in the relevant art that the inventor or a joint inventor, or for applications subject to pre-AIA 35 U.S.C. 112, the inventor(s), at the time the application was filed, had possession of the claimed invention. In independent claims 1 and 17, he newly added limitation “controller (being) configured to operate the first pump to operate the first pump to deliver solder the load sider of the solder distribution baffle via the first chamber to reduce a width of the solder wave” in conjunction with the comprising language is not supported by the original disclosure and constitutes new matter. Specifically, paragraph [0032] of the instant specification states that “[f]or example, by only operating the first pump impeller 58, molten solder is delivered to the load side of the solder distribution baffle 56 via the first chamber 38 to reduce a width of the solder wave.” Thus, the applicant’s omission of “only” from the amendments to claims 1 and 17 in conjunction with the “comprising” language broadens the scope of the claims beyond what is supported by the original disclosure. In independent claim 12, the newly added limitation “selectively controlling the two pumps includes controlling the first pump to deliver solder the load side of the solder distribution baffle via the first chamber to reduce a width of the solder wave” in conjunction with the “comprising” language is not supported by the original disclosure and constitutes new matter. Specifically, paragraph [0032] of the instant specification states that “[f]or example, by only operating the first pump impeller 58, molten solder is delivered to the load side of the solder distribution baffle 56 via the first chamber 38 to reduce a width of the solder wave.” Thus, the applicant’s omission of “only” from the amendments to claim 12 in conjunction with the “comprising” language broadens the scope of the claim beyond what is supported by the original disclosure. Response to Arguments Applicant's arguments filed 9/30/26 have been fully considered but they are not persuasive. The applicant argues that “[s]imply put, there is no teaching in Grasmann of being able to produce a reduced width solder wave by operating the first pump only and to produce an increased width solder wave by operating the first pump and the second pump together.” The applicant’s argument is not commensurate in scope with the claims. Note that placing the “only” language into claims 1, 12, and 17 would overcome the new matter rejections above. Conclusion Applicant's amendment necessitated the new ground(s) of rejection presented in this Office action. Accordingly, THIS ACTION IS MADE FINAL. See MPEP § 706.07(a). Applicant is reminded of the extension of time policy as set forth in 37 CFR 1.136(a). A shortened statutory period for reply to this final action is set to expire THREE MONTHS from the mailing date of this action. In the event a first reply is filed within TWO MONTHS of the mailing date of this final action and the advisory action is not mailed until after the end of the THREE-MONTH shortened statutory period, then the shortened statutory period will expire on the date the advisory action is mailed, and any nonprovisional extension fee (37 CFR 1.17(a)) pursuant to 37 CFR 1.136(a) will be calculated from the mailing date of the advisory action. In no event, however, will the statutory period for reply expire later than SIX MONTHS from the mailing date of this final action. Any inquiry concerning this communication or earlier communications from the examiner should be directed to KILEY SHAWN STONER whose telephone number is (571)272-1183. The examiner can normally be reached on Monday-Thursday. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Keith Walker can be reached on 571-272-3458. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of an application may be obtained from the Patent Application Information Retrieval (PAIR) system. Status information for published applications may be obtained from either Private PAIR or Public PAIR. Status information for unpublished applications is available through Private PAIR only. For more information about the PAIR system, see http://pair-direct.uspto.gov. Should you have questions on access to the Private PAIR system, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative or access to the automated information system, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /KILEY S STONER/ Primary Examiner, Art Unit 1735
Read full office action

Prosecution Timeline

Jan 06, 2026
Application Filed
Sep 02, 2026
Non-Final Rejection mailed — §112
Sep 30, 2026
Response Filed
Nov 06, 2026
Final Rejection mailed — §112
Nov 16, 2026
Applicant Interview (Telephonic)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12797953
Processes and/or Machines for Producing Continuous Plastic Deformation, and/or Compositions and/or Manufactures Produced Thereby
1y 4m to grant Granted Nov 17, 2026
Patent 12794188
Robotic Wire Termination System
1y 3m to grant Granted Nov 10, 2026
Patent 12782643
SYSTEMS AND METHODS OF JOINING SUBSTRATES USING NANO-PARTICLES
2y 11m to grant Granted Nov 03, 2026
Patent 12758840
Throwing Footwork Trainer
2y 1m to grant Granted Oct 13, 2026
Patent 12760938
IN-SITU SOLAR TRACKER MANUFACTURING
1y 11m to grant Granted Oct 13, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

3-4
Expected OA Rounds
81%
Grant Probability
96%
With Interview (+15.5%)
2y 1m (~1y 2m remaining)
Median Time to Grant
Moderate
PTA Risk
Based on 1463 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month