Prosecution Insights
Last updated: October 04, 2026
Application No. 19/462,296

METHOD AND USER EQUIPMENT FOR PROCESSING SERVICES USING CONTROL PLANE CIOT EPS OPTIMIZATION

Non-Final OA §DP
Filed
Jan 28, 2026
Priority
Sep 08, 2025 — RE 10-2025-0127112 +1 more
Examiner
BELUR, DEEPA
Art Unit
2472
Tech Center
2400 — Computer Networks
Assignee
H3Nity Co. Ltd.
OA Round
3 (Non-Final)
84%
Grant Probability
Favorable
3-4
OA Rounds
1y 9m
Est. Remaining
94%
With Interview

Examiner Intelligence

Grants 84% — above average
84%
Career Allowance Rate
503 granted / 600 resolved
+25.8% vs TC avg
Moderate +11% lift
Without
With
+10.6%
Interview Lift
resolved cases with interview
Typical timeline
2y 5m
Avg Prosecution
17 currently pending
Career history
616
Total Applications
across all art units

Statute-Specific Performance

§101
4.1%
-35.9% vs TC avg
§103
61.1%
+21.1% vs TC avg
§102
8.8%
-31.2% vs TC avg
§112
18.0%
-22.0% vs TC avg
Black line = Tech Center average estimate • Based on career data from 600 resolved cases

Office Action

§DP
DETAILED ACTION Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . This action is in response to the RCE filed on 7/28/2026. Claims 1-15 are amended. The Applicant was contacted on 9/22/2026 and was informed regarding the Double Patenting rejection for the recently issued Patent Application No. 1919/463,659 (Notice of Allowance mailed on 9/15/2026). Please refer to the Interview Summary for details. The 35 U.S.C. 122(b) rejection for claims 1-15 has been withdrawn, based on the amendment. Claims 1-15 are examined and rejected. Double Patenting The nonstatutory double patenting rejection is based on a judicially created doctrine grounded in public policy (a policy reflected in the statute) so as to prevent the unjustified or improper timewise extension of the “right to exclude” granted by a patent and to prevent possible harassment by multiple assignees. A nonstatutory double patenting rejection is appropriate where the conflicting claims are not identical, but at least one examined application claim is not patentably distinct from the reference claim(s) because the examined application claim is either anticipated by, or would have been obvious over, the reference claim(s). See, e.g., In re Berg, 140 F.3d 1428, 46 USPQ2d 1226 (Fed. Cir. 1998); In re Goodman, 11 F.3d 1046, 29 USPQ2d 2010 (Fed. Cir. 1993); In re Longi, 759 F.2d 887, 225 USPQ 645 (Fed. Cir. 1985); In re Van Ornum, 686 F.2d 937, 214 USPQ 761 (CCPA 1982); In re Vogel, 422 F.2d 438, 164 USPQ 619 (CCPA 1970); In re Thorington, 418 F.2d 528, 163 USPQ 644 (CCPA 1969). A timely filed terminal disclaimer in compliance with 37 CFR 1.321(c) or 1.321(d) may be used to overcome an actual or provisional rejection based on nonstatutory double patenting provided the reference application or patent either is shown to be commonly owned with the examined application, or claims an invention made as a result of activities undertaken within the scope of a joint research agreement. See MPEP § 717.02 for applications subject to examination under the first inventor to file provisions of the AIA as explained in MPEP § 2159. See MPEP § 2146 et seq. for applications not subject to examination under the first inventor to file provisions of the AIA . A terminal disclaimer must be signed in compliance with 37 CFR 1.321(b). The filing of a terminal disclaimer by itself is not a complete reply to a nonstatutory double patenting (NSDP) rejection. A complete reply requires that the terminal disclaimer be accompanied by a reply requesting reconsideration of the prior Office action. Even where the NSDP rejection is provisional the reply must be complete. See MPEP § 804, subsection I.B.1. For a reply to a non-final Office action, see 37 CFR 1.111(a). For a reply to final Office action, see 37 CFR 1.113(c). A request for reconsideration while not provided for in 37 CFR 1.113(c) may be filed after final for consideration. See MPEP §§ 706.07(e) and 714.13. The USPTO Internet website contains terminal disclaimer forms which may be used. Please visit www.uspto.gov/patent/patents-forms. The actual filing date of the application in which the form is filed determines what form (e.g., PTO/SB/25, PTO/SB/26, PTO/AIA /25, or PTO/AIA /26) should be used. A web-based eTerminal Disclaimer may be filled out completely online using web-screens. An eTerminal Disclaimer that meets all requirements is auto-processed and approved immediately upon submission. For more information about eTerminal Disclaimers, refer to www.uspto.gov/patents/apply/applying-online/eterminal-disclaimer. Independent Claims 1, 6 and 11 rejected on the ground of nonstatutory double patenting as being unpatentable over claims (1-3), (6-8), (11-13) respectively of U.S. Application No. 19/463,659 (Notice of Allowance mailed on 9/15/2026). Although the claims at issue are not identical, they are not patentably distinct from each other because although the conflicting claims are not identical, they are not patentably distinct from each other because claim 1 is generic to all that is recited in claim 1 of the U.S. Application No. 19/463,659 (Notice of Allowance mailed on 9/15/2026). That is, claim 1 is anticipated by claims 1-3 of the U.S. Application No. 19/463,659 (Notice of Allowance mailed on 9/15/2026). Representative Claim 1 of the instant application is directed to method of UE, the UE supports control plane cellular internet of things (CIoT) evolved packet system (EPS) optimization with overhead reduction, setting a control plane CIoT EPS optimization with overhead reduction bit to "control plane CIoT EPS optimization with overhead reduction supported" in capability information; transmitting an attach request message including the capability information; receiving a response message, wherein based on that the UE supports the control plane CIoT EPS optimization with overhead reduction, based on that a network node supports and accepts the control plane CIoT EPS optimization with overhead reduction and based on that the response message is an attach accept message, the attach accept message includes an EPS network feature support information which indicates "control plane CIoT EPS optimization with overhead reduction supported"; based on that the UE supports a store and forward (S&F) operation and the network node is operating in a S&F mode, receiving a service accept message including a S&F satellite operation parameter, wherein the S&F satellite operation parameter includes at least one of a S&F wait time duration and an estimated uplink delivery time duration; and based on that the S&F satellite operation parameter includes the S&F wait time duration, starting a first timer based on a value of the S&F wait time duration, wherein while the first timer is running, the UE does not initiate a non-access stratum (NAS) procedure over a S&F satellite cell in a tracking area of a tracking area identity (TAI) list, unless the S&F satellite cell broadcasts the same satellite identity (ID) broadcasted by the S&F satellite cell, and wherein based on that the service accept message includes the value for the T3448 timer and based on that the value for the T3448 timer indicates that the T3448 timer is either zero or deactivated, the UE considers this case as an abnormal case and performs a procedure for a situation where the value for the T3448 timer is not present. Claims (1-3) of the U.S. Application No. 19/463,659 (Notice of Allowance mailed on 9/15/2026) are directed to a method of UE, if the UE supports control plane cellular internet of things (CIoT) evolved packet system (EPS) optimization with overhead reduction, setting a control plane CIoT EPS optimization with overhead reduction bit to "control plane CIoT EPS optimization with overhead reduction supported" in capability information; transmitting a tracking area update message including the capability information; if the UE supports a store and forward (S&F) operation and the network node is operating in a S&F mode, receiving a service accept message including a S&F satellite operation parameter, wherein the S&F satellite operation parameter includes at least one of a S&F wait time duration and an estimated uplink delivery time duration; and if the S&F satellite operation parameter includes the S&F wait time duration, starting a first timer based on a value of the S&F wait time duration, wherein while the first timer is running, the UE does not initiate a non-access stratum (NAS) procedure over a S&F satellite cell in a tracking area of a tracking area identity (TAI) list, unless the S&F satellite cell broadcasts a same satellite identity (ID) broadcasted by the S&F satellite cell and cell from which the service accept message was received wherein the control plane CIoT EPS optimization with overhead reduction bit is ignored if a control plane CIoT EPS optimization bit is set to zero (0)…. if the service accept message includes a value for a T3448 timer, stopping the timer T3448 and considering a transport of user data via a control plane as successful… wherein if the value for the T3448 timer indicates that the T3448 timer is either zero or deactivated, the UE considers this case as an abnormal case and proceeds as if the value for the T3448 timer is not included. Independent Claims 1, 6 and 11 rejected on the ground of nonstatutory double patenting as being unpatentable over claims (1-3), (5-7), (9-11) respectively of U.S. Patent. 12/666,282 B2. Although the claims at issue are not identical, they are not patentably distinct from each other because although the conflicting claims are not identical, they are not patentably distinct from each other because claim 1 is generic to all that is recited in claim 1 of the U.S. Patent. 12/666,282 B2. That is, claim 1 is anticipated by claims 1-3 of the U.S. Patent. 12/666,282 B2. Representative Claim 1 of the instant application is directed to method of UE, the UE supports control plane cellular internet of things (CIoT) evolved packet system (EPS) optimization with overhead reduction, setting a control plane CIoT EPS optimization with overhead reduction bit to "control plane CIoT EPS optimization with overhead reduction supported" in capability information; transmitting an attach request message including the capability information; receiving a response message, wherein based on that the UE supports the control plane CIoT EPS optimization with overhead reduction, based on that a network node supports and accepts the control plane CIoT EPS optimization with overhead reduction and based on that the response message is an attach accept message, the attach accept message includes an EPS network feature support information which indicates "control plane CIoT EPS optimization with overhead reduction supported"; based on that the UE supports a store and forward (S&F) operation and the network node is operating in a S&F mode, receiving a service accept message including a S&F satellite operation parameter, wherein the S&F satellite operation parameter includes at least one of a S&F wait time duration and an estimated uplink delivery time duration; and based on that the S&F satellite operation parameter includes the S&F wait time duration, starting a first timer based on a value of the S&F wait time duration, wherein while the first timer is running, the UE does not initiate a non-access stratum (NAS) procedure over a S&F satellite cell in a tracking area of a tracking area identity (TAI) list, unless the S&F satellite cell broadcasts the same satellite identity (ID) broadcasted by the S&F satellite cell, and wherein based on that the service accept message includes the value for the T3448 timer and based on that the value for the T3448 timer indicates that the T3448 timer is either zero or deactivated, the UE considers this case as an abnormal case and performs a procedure for a situation where the value for the T3448 timer is not present. Claims (1-3) of the U.S. Patent. 12/666,282 B2 are directed to method of user equipment (UE), comprising when the UE supports control plane cellular internet of things (CIoT) evolved packet system (EPS) optimization with overhead reduction, transmitting a first message including capability information in which a control plane CIoT EPS optimization with overhead reduction bit is set, wherein the control plane CIoT EPS optimization with overhead reduction bit is ignored when a control plane CIoT EPS optimization bit is set to zero (0); when the UE supports a store and forward (S&F) operation and the network node is operating in a S&F mode, receiving a service accept message including a S&F wait time duration; and starting a first timer based on a value of the S&F wait time duration, wherein while the first timer is running, the UE does not initiate a non-access stratum (NAS) procedure over a S&F satellite cell in a tracking area of a tracking area identity (TAI) list, unless the S&F satellite cell broadcasts a same satellite identity (ID) broadcasted by the S&F satellite cell… if the service accept message includes a value for a T3448 timer, stopping the timer T3448 and considering a transport of user data via a control plane as successful… if the value for the T3448 timer indicates that the T3448 timer is either zero or deactivated, the UE considers this case as an abnormal case and proceeds as if the value for the T3448 timer is not included. Conclusion Any inquiry concerning this communication or earlier communications from the examiner should be directed to DEEPA BELUR whose telephone number is (571)270-3722. The examiner can normally be reached M-F 8 am - 4:30 pm. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Kevin Bates can be reached at 571-272-3980. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /DEEPA BELUR/Primary Examiner, Art Unit 2472
Read full office action

Prosecution Timeline

Jan 28, 2026
Application Filed
Jul 06, 2026
Non-Final Rejection mailed — §DP
Jul 09, 2026
Response Filed
Jul 24, 2026
Final Rejection mailed — §DP
Jul 28, 2026
Request for Continued Examination
Aug 03, 2026
Response after Non-Final Action
Sep 22, 2026
Examiner Interview (Telephonic)
Sep 25, 2026
Non-Final Rejection mailed — §DP (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12750793
TECHNIQUES FOR SWITCHING RECEIVE BEAMS FOR CELL MEASUREMENT IN WIRELESS COMMUNICATIONS
6y 0m to grant Granted Sep 29, 2026
Patent 12739003
METHOD AND APPARATUS
3y 2m to grant Granted Sep 15, 2026
Patent 12732861
ESTIMATING CONGESTION BASED ON BOTH COMMUNICATION AND NON-COMMUNICATION PERSPECTIVES
2y 8m to grant Granted Sep 08, 2026
Patent 12707356
Handling of Quality-of-Experience (QOE) Measurement Status
3y 0m to grant Granted Aug 11, 2026
Patent 12701448
MEASUREMENT REPORTING USING A LOOKUP TABLE
3y 4m to grant Granted Aug 04, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

3-4
Expected OA Rounds
84%
Grant Probability
94%
With Interview (+10.6%)
2y 5m (~1y 9m remaining)
Median Time to Grant
High
PTA Risk
Based on 600 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month