Technology area: Transportation, E-Commerce & Mechanical Systems
1 pending office actions • 1 art units • 1 examiners • 0 of 1 (0%) have an AI response strategy ready
Advanced Modular Design has 1 pending office action in Transportation, E-Commerce & Mechanical Systems. The application is associated with 1 examiner and 1 art unit, producing a focused prosecution record.
KWIECINSKI, RYAN D is the busiest examiner, with 1 pending matter. Counsel can concentrate on the single action, the examiner’s stated issues, and the technical distinctions most relevant to the assigned art unit.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| Multi-statute (no §101) | 1 (100%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| KWIECINSKI, RYAN D | 1 | 68.2% | +19.7% |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 1 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19072497 | STABILIZER FOR A METAL STRUCTURE AND METAL STRUCTURES INCORPORATING THE STABILIZER | KWIECINSKI, RYAN D | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 1 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19072497 | STABILIZER FOR A METAL STRUCTURE AND METAL STRUCTURES INCORPORATING THE STABILIZER | KWIECINSKI, RYAN D | — |
| Art Unit | Apps |
|---|---|
| 3635 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19072497 | STABILIZER FOR A METAL STRUCTURE AND METAL STRUCTURES INCORPORATING THE STABILIZER | KWIECINSKI, RYAN D | 3635 | §102§103§112 | Non-Final OA | — | Pending | Mar 06, 2025 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free TrialAdvanced Modular Design has 1 pending office actions as of October 2026, spread across 1 art units and 1 examiners.
Ryan D Kwiecinski has the most, with 1 of Advanced Modular Design's pending office actions.
Mostly Transportation, E-Commerce & Mechanical Systems (USPTO Tech Center 3600), based on where its pending office actions are examined.