Technology area: Transportation, E-Commerce & Mechanical Systems
20 pending office actions • 12 art units • 16 examiners • 0 of 20 (0%) have an AI response strategy ready • 34 patents granted in the last 365 days
BNSF Railway Company has 19 pending office actions in Transportation, E-Commerce & Mechanical Systems. These matters involve 15 examiners across 11 art units, showing distribution across both individual examiners and technical groups.
GILLS, KURTIS is the busiest examiner, with 4 pending matters. The identified concentration gives counsel a specific examiner relationship to monitor, while the broader examiner and art-unit spread calls for matter-level review rather than a single uniform response approach.
Based on the USPTO statutory response window for each pending office action. 4 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 4 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 only | 3 (15%) |
| §101 + other | 8 (40%) |
| §103 only | 6 (30%) |
| §102 only | 1 (5%) |
| Multi-statute (no §101) | 2 (10%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| GILLS, KURTIS | 4 | 58.0% | +28.8% |
| KUHFUSS, ZACHARY L | 2 | 77.9% | +18.2% |
| MCPHERSON, JAMES M | 1 | 82.3% | +17.3% |
| GURMU, MULUEMEBET | 1 | 80.2% | +17.2% |
| GODBOLD, DAVID GARRISON | 1 | 22.4% | +29.5% |
| LEWANDROSKI, SARA J | 1 | 80.7% | +9.7% |
| CHANG, DANIEL CHEOLJIN | 1 | 88.2% | +14.4% |
| MCCARRY JR, ROBERT J | 1 | 81.7% | +16.9% |
| BARZEGAR, PEGAH | 1 | 73.7% | +42.1% |
| MORFORD, ALEXANDRA ROBYN | 1 | 50.0% | +50.5% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 2 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19291451 | SYSTEM AND METHOD FOR DATA PRUNING VIA DYNAMIC PARTITION MANAGEMENT | GURMU, MULUEMEBET | — |
| 18959518 | LOCKED-AXLE WHEEL CRADLE, SYSTEM, AND METHOD | MCCARRY JR, ROBERT J | — |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18911983 | SYSTEM AND METHOD FOR DYNAMIC AND LOGICAL INTERMODAL PARKING LOT CLASSIFICATION | GILLS, KURTIS | 7d |
| 19356860 | REMOTE ENGINE SPEED CONTROL | MCPHERSON, JAMES M | — |
| 19285774 | SYSTEMS AND METHODS FOR ESTIMATING DYNAMIC TIME WINDOW FOR LAST-MILE DELIVERY ESTIMATED TIME OF ARRIVAL | GODBOLD, DAVID GARRISON | — |
| 19269393 | TIME-SPACE NETWORK BASED MULTI-OBJECTIVE SYSTEMS AND METHODS FOR OPTIMAL RAIL CAR STACKING AT A RAILROAD MERCHANDISE YARD | GILLS, KURTIS | — |
| 19219413 | SYSTEM AND METHOD FOR RAILROAD SNAPSHOT AND PLAYBACK | LEWANDROSKI, SARA J | — |
| 19044828 | SYSTEM AND METHOD FOR INTERMODAL DUAL-STREAM-BASED RESOURCE OPTIMIZATION | GILLS, KURTIS | — |
| 19018708 | SYSTEMS AND METHODS FOR RECONSTRUCTING OBJECTS USING TRANSITIONAL IMAGES | CHANG, DANIEL CHEOLJIN | — |
| 18911420 | SYSTEM AND METHOD FOR OPTIMIZING UTILIZATION OF CHASSIS RESOURCES OF A HUB BASED ON A DUAL-STREAM RESOURCE OPTIMIZATION | GILLS, KURTIS | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18911983 | SYSTEM AND METHOD FOR DYNAMIC AND LOGICAL INTERMODAL PARKING LOT CLASSIFICATION | GILLS, KURTIS | 7d |
| 18658510 | SYSTEMS AND METHODS FOR AUTOMATIC TUNING OF CLASSIFICATION YARD PARAMETERS | MORFORD, ALEXANDRA ROBYN | 34d |
| 19356860 | REMOTE ENGINE SPEED CONTROL | MCPHERSON, JAMES M | — |
| 19291451 | SYSTEM AND METHOD FOR DATA PRUNING VIA DYNAMIC PARTITION MANAGEMENT | GURMU, MULUEMEBET | — |
| 19285774 | SYSTEMS AND METHODS FOR ESTIMATING DYNAMIC TIME WINDOW FOR LAST-MILE DELIVERY ESTIMATED TIME OF ARRIVAL | GODBOLD, DAVID GARRISON | — |
| 19269393 | TIME-SPACE NETWORK BASED MULTI-OBJECTIVE SYSTEMS AND METHODS FOR OPTIMAL RAIL CAR STACKING AT A RAILROAD MERCHANDISE YARD | GILLS, KURTIS | — |
| 19044828 | SYSTEM AND METHOD FOR INTERMODAL DUAL-STREAM-BASED RESOURCE OPTIMIZATION | GILLS, KURTIS | — |
| 19018708 | SYSTEMS AND METHODS FOR RECONSTRUCTING OBJECTS USING TRANSITIONAL IMAGES | CHANG, DANIEL CHEOLJIN | — |
| Art Unit | Apps |
|---|---|
| 3624 | 4 |
| 3615 | 4 |
| 3661 | 2 |
| 2857 | 2 |
| 2163 | 1 |
| 3628 | 1 |
| 2669 | 1 |
| 3747 | 1 |
| 3658 | 1 |
| 3627 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19356860 | REMOTE ENGINE SPEED CONTROL | MCPHERSON, JAMES M | 3661 | §101 | Non-Final OA | — | Pending | Oct 13, 2025 |
| 19291451 | SYSTEM AND METHOD FOR DATA PRUNING VIA DYNAMIC PARTITION MANAGEMENT | GURMU, MULUEMEBET | 2163 | §103 | Non-Final OA | — | Pending | Aug 05, 2025 |
| 19285774 | SYSTEMS AND METHODS FOR ESTIMATING DYNAMIC TIME WINDOW FOR LAST-MILE DELIVERY ESTIMATED TIME OF ARRIVAL | GODBOLD, DAVID GARRISON | 3628 | §101 | Final Rejection | — | Pending | Jul 30, 2025 |
| 19269393 | TIME-SPACE NETWORK BASED MULTI-OBJECTIVE SYSTEMS AND METHODS FOR OPTIMAL RAIL CAR STACKING AT A RAILROAD MERCHANDISE YARD | GILLS, KURTIS | 3624 | §101Other | Non-Final OA | — | Pending | Jul 15, 2025 |
| 19219413 | SYSTEM AND METHOD FOR RAILROAD SNAPSHOT AND PLAYBACK | LEWANDROSKI, SARA J | 3661 | §101§103§112 | Final Rejection | — | Pending | May 27, 2025 |
| 19044828 | SYSTEM AND METHOD FOR INTERMODAL DUAL-STREAM-BASED RESOURCE OPTIMIZATION | GILLS, KURTIS | 3624 | §101§103DP | Final Rejection | — | Pending | Feb 04, 2025 |
| 19018708 | SYSTEMS AND METHODS FOR RECONSTRUCTING OBJECTS USING TRANSITIONAL IMAGES | CHANG, DANIEL CHEOLJIN | 2669 | §103§112Other | Non-Final OA | — | Pending | Jan 13, 2025 |
| 18959518 | LOCKED-AXLE WHEEL CRADLE, SYSTEM, AND METHOD | MCCARRY JR, ROBERT J | 3615 | §102 | Non-Final OA | — | Pending | Nov 25, 2024 |
| 18911983 | SYSTEM AND METHOD FOR DYNAMIC AND LOGICAL INTERMODAL PARKING LOT CLASSIFICATION | GILLS, KURTIS | 3624 | §101§103 | Final Rejection | 7d | Pending | Oct 10, 2024 |
| 18911420 | SYSTEM AND METHOD FOR OPTIMIZING UTILIZATION OF CHASSIS RESOURCES OF A HUB BASED ON A DUAL-STREAM RESOURCE OPTIMIZATION | GILLS, KURTIS | 3747 | §101§103 | Final Rejection | — | Pending | Oct 10, 2024 |
| 18797137 | SYSTEMS AND METHODS FOR REMOTE ACTIVATION OF RAILROAD CROSSING SIGNALS | BARZEGAR, PEGAH | 3615 | §103 | Final Rejection | — | Pending | Aug 07, 2024 |
| 18658510 | SYSTEMS AND METHODS FOR AUTOMATIC TUNING OF CLASSIFICATION YARD PARAMETERS | MORFORD, ALEXANDRA ROBYN | 3658 | §103 | Non-Final OA | 34d | Pending | May 08, 2024 |
| 18658760 | SYSTEMS AND METHODS FOR MONITORING AND VALIDATING STATUS OF SWITCH DEVICES | KUHFUSS, ZACHARY L | 3615 | §103§112 | Non-Final OA | — | Pending | May 08, 2024 |
| 18658386 | SYSTEMS OF METHODS FOR MANAGING OPERATIONS OF A CLASSIFICATION YARD | KUHFUSS, ZACHARY L | 3615 | §103 | Non-Final OA | — | Pending | May 08, 2024 |
| 18658732 | SYSTEMS AND METHODS WITH PREDICTIVE MODELS FOR ESTIMATING TUNING COEFFICIENTS OF A CLASSIFICATION YARD | KUAN, JOHN CHUNYANG | 2857 | §101§112Other | Non-Final OA | — | Pending | May 08, 2024 |
| 18435831 | INTERMODAL INVENTORY VISUALIZATION SYSTEMS AND METHODS | CHAMPAGNE, LUNA | 3627 | §103 | Non-Final OA | 33d | Pending | Feb 07, 2024 |
| 18394046 | SYSTEMS AND METHODS FOR SCHEDULING TRACK MAINTENANCE | EL-BATHY, MOHAMED N | 3624 | §103 | Non-Final OA | 37d overdue | Pending | Dec 22, 2023 |
| 18391182 | AUTOMATED POSITIVE TRAIN CONTROL EVENT DATA EXTRACTION AND ANALYSIS ENGINE FOR PERFORMING ROOT CAUSE ANALYSIS OF UNSTRUCTURED DATA | SITIRICHE, LUIS A | 2126 | §101§103Other | Non-Final OA | — | Pending | Dec 20, 2023 |
| 18497156 | SYSTEM AND METHOD FOR CONTINUOUS WELDED RAIL RISK MODELING | SUN, XIUQIN | 2857 | §101§103§112 | Final Rejection | — | Pending | Oct 30, 2023 |
| 18167656 | MOBILE WORK REPORTING SYSTEMS AND METHODS | XIE, THEODORE L | 3623 | §101§103 | Non-Final OA | — | Pending | Feb 10, 2023 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free TrialBNSF Railway Company has 20 pending office actions as of October 2026, spread across 12 art units and 16 examiners.
Kurtis Gills has the most, with 4 of BNSF Railway Company's pending office actions.
Mostly Transportation, E-Commerce & Mechanical Systems (USPTO Tech Center 3600), based on where its pending office actions are examined.