2 pending office actions • 0 art units • 2 examiners • 0 of 2 (0%) have an AI response strategy ready • 3 patents granted in the last 365 days
Energy Vault Inc. currently manages a portfolio with 1 pending office action. This single action is assigned to a distinct examiner. Everett, Christopher E is the busiest examiner for the company, currently overseeing the 1 pending office action. The current workload involves 0 distinct art units. This indicates that the company's current prosecution effort is concentrated on a single matter. Practitioners should prioritize the requirements of this examiner to ensure a favorable outcome for the pending case.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §103 only | 1 (50%) |
| Multi-statute (no §101) | 1 (50%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| DESAI, NAISHADH N | 1 | 82.0% | +8.8% |
| EVERETT, CHRISTOPHER E | 1 | 83.6% | +23.2% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 1 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18935328 | SYSTEMS AND METHODS FOR FAULT TOLERANT ENERGY MANAGEMENT SYSTEMS CONFIGURED TO MANAGE HETEROGENEOUS POWER PLANTS | EVERETT, CHRISTOPHER E | — |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 1 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19034177 | LIFT DRIVE SYSTEM FOR ENERGY STORAGE AND DELIVERY SYSTEM | DESAI, NAISHADH N | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 1 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18935328 | SYSTEMS AND METHODS FOR FAULT TOLERANT ENERGY MANAGEMENT SYSTEMS CONFIGURED TO MANAGE HETEROGENEOUS POWER PLANTS | EVERETT, CHRISTOPHER E | — |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19034177 | LIFT DRIVE SYSTEM FOR ENERGY STORAGE AND DELIVERY SYSTEM | DESAI, NAISHADH N | — | §102§103 | Non-Final OA | — | Pending | Jan 22, 2025 |
| 18935328 | SYSTEMS AND METHODS FOR FAULT TOLERANT ENERGY MANAGEMENT SYSTEMS CONFIGURED TO MANAGE HETEROGENEOUS POWER PLANTS | EVERETT, CHRISTOPHER E | — | §103Other | Non-Final OA | — | Pending | Nov 01, 2024 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial