Technology areas: Semiconductors, Circuits & Optics • Transportation, E-Commerce & Mechanical Systems • Medical Devices & Mechanical Engineering
6 pending office actions • 6 art units • 6 examiners • 0 of 6 (0%) have an AI response strategy ready • 11 patents granted in the last 365 days
GE Energy Power Conversion Technology Limited has 6 pending office actions in Semiconductors, Circuits & Optics. Those matters involve 6 distinct examiners and 6 distinct art units, so each action is assigned through a separate examiner and unit combination in the available data.
ELNAKIB, AHMED is the busiest examiner, with 1 pending matter. The evenly distributed assignment pattern limits the value of a single-examiner prosecution strategy. Counsel may instead benefit from a coordinated claim, disclosure, and response framework that can be adapted across the separate examination settings.
Based on the USPTO statutory response window for each pending office action. 3 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 3 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| Multi-statute (no §101) | 6 (100%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| ELNAKIB, AHMED | 1 | 78.9% | +8.6% |
| TAYLOR II, JAMES JOSEPH | 1 | 83.4% | +25.0% |
| FERDOUS, ZANNATUL | 1 | 84.4% | +16.7% |
| TAN, DING Y | 1 | 76.2% | +17.6% |
| EVANGELISTA, THEODORE JUSTINE | 1 | 62.7% | +21.6% |
| LEE, GEOFFREY S | 1 | 60.6% | +20.4% |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 6 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18764587 | ELECTRIC CIRCUITS AND TRIGGERING DETECTION METHODS FOR ELECTRIC CIRCUITS | FERDOUS, ZANNATUL | 23d |
| 18628240 | MOUNTING ARRANGEMENTS | TAN, DING Y | 56d |
| 16923266 | MECHANICAL DRIVE SYSTEM AND ASSOCIATED MOTOR COMPRESSOR | LEE, GEOFFREY S | 56d |
| 19169703 | GEARLESS MILL DRIVES | ELNAKIB, AHMED | — |
| 18941659 | DYNAMIC VIBRATION ABSORBER | TAYLOR II, JAMES JOSEPH | — |
| 18433855 | ARC FURNACLE FACILITY | EVANGELISTA, THEODORE JUSTINE | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 5 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18764587 | ELECTRIC CIRCUITS AND TRIGGERING DETECTION METHODS FOR ELECTRIC CIRCUITS | FERDOUS, ZANNATUL | 23d |
| 18628240 | MOUNTING ARRANGEMENTS | TAN, DING Y | 56d |
| 16923266 | MECHANICAL DRIVE SYSTEM AND ASSOCIATED MOTOR COMPRESSOR | LEE, GEOFFREY S | 56d |
| 18941659 | DYNAMIC VIBRATION ABSORBER | TAYLOR II, JAMES JOSEPH | — |
| 18433855 | ARC FURNACLE FACILITY | EVANGELISTA, THEODORE JUSTINE | — |
| Art Unit | Apps |
|---|---|
| 2834 | 1 |
| 3655 | 1 |
| 2858 | 1 |
| 3632 | 1 |
| 3761 | 1 |
| 3746 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19169703 | GEARLESS MILL DRIVES | ELNAKIB, AHMED | 2834 | §102§103 | Non-Final OA | — | Pending | Apr 03, 2025 |
| 18941659 | DYNAMIC VIBRATION ABSORBER | TAYLOR II, JAMES JOSEPH | 3655 | §102§112 | Non-Final OA | — | Pending | Nov 08, 2024 |
| 18764587 | ELECTRIC CIRCUITS AND TRIGGERING DETECTION METHODS FOR ELECTRIC CIRCUITS | FERDOUS, ZANNATUL | 2858 | §102§103 | Non-Final OA | 23d | Pending | Jul 05, 2024 |
| 18628240 | MOUNTING ARRANGEMENTS | TAN, DING Y | 3632 | §102§103§112 | Non-Final OA | 56d | Pending | Apr 05, 2024 |
| 18433855 | ARC FURNACLE FACILITY | EVANGELISTA, THEODORE JUSTINE | 3761 | §103§112 | Non-Final OA | — | Pending | Feb 06, 2024 |
| 16923266 | MECHANICAL DRIVE SYSTEM AND ASSOCIATED MOTOR COMPRESSOR | LEE, GEOFFREY S | 3746 | §103§112 | Non-Final OA | 56d | Pending | Jul 08, 2020 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free TrialGE Energy Power Conversion Technology Limited has 6 pending office actions as of October 2026, spread across 6 art units and 6 examiners.
Ahmed Elnakib has the most, with 1 of GE Energy Power Conversion Technology Limited's pending office actions.
Mostly Semiconductors, Circuits & Optics (USPTO Tech Center 2800), based on where its pending office actions are examined.