Prosecution Insights
Last updated: October 04, 2026

General Electric Technology GmbH

Technology areas: Computing & Software • Medical Devices & Mechanical Engineering

3 pending office actions • 2 art units • 3 examiners • 0 of 3 (0%) have an AI response strategy ready • 16 patents granted in the last 365 days

Analysis

General Electric Technology GmbH has 3 pending office actions in the Medical Devices & Mechanical Engineering technology area. These actions are split across 2 distinct art units, indicating some technical breadth within this sector. The prosecution involves 3 distinct examiners, so each pending action is being reviewed by a different individual. This distribution across 3 distinct examiners requires the company to manage three separate examiner relationships.

The busiest examiner is GOLIK, ARTHUR PAUL, who is responsible for 1 pending office action. With 3 pending actions and 3 distinct examiners, the workload is evenly distributed. The company must manage 3 separate examiner relationships across 2 distinct art units, requiring a strategy that accounts for the specific feedback of each individual examiner. Practitioners should note that each of the 3 pending office actions is being handled by a unique examiner, which may lead to different prosecution outcomes across the 2 distinct art units.

Written from this page's own data; every figure is computed from USPTO records and verified before publication.

Portfolio Summary

3
Total Pending OAs
2
Non-Final OAs
1
Final Rejections
0
Advisory / Quayle

Case Difficulty Mix

Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.

2
Hard (67%)
1
Medium (33%)
0
Easy (0%)
0
Unknown (0%)

Rejection Statute Mix

BucketCases
§103 only1 (33%)
Multi-statute (no §101)2 (67%)

Industry Mix

How the docket's pending cases split across USPTO tech-center bands.

0
Life Sciences
0% of docket
1
Information Tech
33% of docket
0
Communications
0% of docket
0
Semiconductors
0% of docket
2
Mechanical / Eng
67% of docket
0
Business / Other
0% of docket

Time-on-OA Estimate

Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.

30 h
Manual time on pending OAs
6 h
Time saved (low, 20%)
10 h
Time saved (mid, 35%)
0.3 wks
FTE-weeks freed (mid)

Top Examiners on this docket

ExaminerApps on this docketAllow rateInterview lift
GOLIK, ARTHUR PAUL 1 69.9% +45.3%
REITZ, MICHAEL K. 1 69.2% +4.2%
SCHALLHORN, TYLER J 1 35.6% +14.8%

Hard Cases (2)

Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 2 ordered by deadline are shown.

App #TitleExaminerDue in
19151139 A STEAM TURBINE, A POWER PLANT AND A SMALL MODULAR REACTOR COMPRISING THE TURBINE AND A METHOD OF MANUFACTURING OR SERVICING OF SAID TURBINE GOLIK, ARTHUR PAUL —
19139721 A STEAM TURBINE AND A USE OF THE STEAM TURBINE, A METHOD OF MANUFACTURING OR SERVICING OF SAID STEAM TURBINE, A SMALL-MODULAR REACTOR AND A POWER PLANT INCLUDING SAID STEAM TURBINE REITZ, MICHAEL K. —

Interview Candidates (2)

Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 2 ordered by deadline are shown.

App #TitleExaminerDue in
19151139 A STEAM TURBINE, A POWER PLANT AND A SMALL MODULAR REACTOR COMPRISING THE TURBINE AND A METHOD OF MANUFACTURING OR SERVICING OF SAID TURBINE GOLIK, ARTHUR PAUL —
18315887 SYSTEMS AND METHODS FOR PERFORMING MACHINE LEARNING AND DATA ANALYTICS IN HYBRID SYSTEMS SCHALLHORN, TYLER J —

Top Art Units

Art UnitApps
3745 2
2144 1

Pending Office Actions

App #TitleExaminerArt UnitStatutesStatusDue inAIFiled
19151139 A STEAM TURBINE, A POWER PLANT AND A SMALL MODULAR REACTOR COMPRISING THE TURBINE AND A METHOD OF MANUFACTURING OR SERVICING OF SAID TURBINE GOLIK, ARTHUR PAUL 3745 §103§112 Non-Final OA — Pending Jul 25, 2025
19139721 A STEAM TURBINE AND A USE OF THE STEAM TURBINE, A METHOD OF MANUFACTURING OR SERVICING OF SAID STEAM TURBINE, A SMALL-MODULAR REACTOR AND A POWER PLANT INCLUDING SAID STEAM TURBINE REITZ, MICHAEL K. 3745 §102§112 Non-Final OA — Pending Jun 16, 2025
18315887 SYSTEMS AND METHODS FOR PERFORMING MACHINE LEARNING AND DATA ANALYTICS IN HYBRID SYSTEMS SCHALLHORN, TYLER J 2144 §103 Final Rejection — Pending May 11, 2023

Managing General Electric Technology GmbH's Patent Portfolio?

IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.

Start Free Trial

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month