Technology areas: Transportation, E-Commerce & Mechanical Systems • Medical Devices & Mechanical Engineering
12 pending office actions • 10 art units • 10 examiners • 0 of 12 (0%) have an AI response strategy ready • 18 patents granted in the last 365 days
Great Plains Manufacturing Inc. has 14 pending office actions in Transportation, E-Commerce & Mechanical Systems. The matters span 12 distinct examiners and 11 distinct art units, indicating substantial distribution across the examining corps. Counsel will need portfolio-level docket controls alongside application-specific technical review.
CHEN, SHELLEY is the busiest examiner, with 3 pending matters. That assignment is the main examiner concentration in the portfolio, while the remaining matters require coordination across multiple other examiner and art-unit channels.
Based on the USPTO statutory response window for each pending office action. 5 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 5 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §103 only | 7 (58%) |
| Double-patenting + other | 1 (8%) |
| Multi-statute (no §101) | 4 (33%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| CHEN, SHELLEY | 3 | 66.2% | +20.4% |
| DIZON, EDWARD ANDREW IZON | 1 | 0.0% | +0.0% |
| DICKSTEIN, WILLIAM DOUGLAS | 1 | 25.0% | +0.0% |
| WOOD, DOUGLAS S | 1 | 78.2% | +11.6% |
| KNAUF, MORGAN MARIE | 1 | 75.0% | +32.0% |
| CHEN, JOSE V | 1 | 78.1% | +15.1% |
| LAUGHLIN, ELIZABETH ANN | 1 | 59.3% | +57.6% |
| TORRES, ALICIA M | 1 | 73.7% | +17.3% |
| PEDERSEN, DAVID RUBEN | 1 | 57.4% | +51.6% |
| PRICE, CRAIG JAMES | 1 | 69.0% | +22.0% |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 6 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18533470 | HVAC DUCTING FOR WORK MACHINE | LAUGHLIN, ELIZABETH ANN | 34d |
| 18910132 | ROLLOVER MONITORING SYSTEM | DIZON, EDWARD ANDREW IZON | — |
| 18781438 | HIGH-CAPACITY BALER WITH COMMON NEEDLE FRAME | DICKSTEIN, WILLIAM DOUGLAS | — |
| 18647230 | REMOVABLE SEED DISTRIBUTION CONTROL SYSTEM FOR AGRICULTURAL SEEDING MACHINE | WOOD, DOUGLAS S | — |
| 18437880 | ENDWISE TRANSPORTABLE IMPLEMENT WITH SEQUENTIAL HYDRAULIC CIRCUIT | KNAUF, MORGAN MARIE | — |
| 18489643 | AUTONOMOUS AGRICULTURAL SYSTEM | CHEN, SHELLEY | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18516313 | VISION SYSTEM FOR METERING DEVICE | TORRES, ALICIA M | 43d overdue |
| 18489618 | AUTONOMOUS AGRICULTURAL SYSTEM | CHEN, SHELLEY | 38d overdue |
| 18484056 | WORK MACHINE SYSTEM FOR MAINTAINING ATTACHMENT POSITION | PEDERSEN, DAVID RUBEN | 27d |
| 18533654 | DISPLAY FOR A WORK MACHINE | CHEN, JOSE V | 33d |
| 18533470 | HVAC DUCTING FOR WORK MACHINE | LAUGHLIN, ELIZABETH ANN | 34d |
| 18647230 | REMOVABLE SEED DISTRIBUTION CONTROL SYSTEM FOR AGRICULTURAL SEEDING MACHINE | WOOD, DOUGLAS S | — |
| 18437880 | ENDWISE TRANSPORTABLE IMPLEMENT WITH SEQUENTIAL HYDRAULIC CIRCUIT | KNAUF, MORGAN MARIE | — |
| 18489519 | AUTONOMOUS AGRICULTURAL SYSTEM | CHEN, SHELLEY | — |
| Art Unit | Apps |
|---|---|
| 3665 | 3 |
| 3663 | 1 |
| 3725 | 1 |
| 3672 | 1 |
| 3611 | 1 |
| 3637 | 1 |
| 3762 | 1 |
| 3671 | 1 |
| 3658 | 1 |
| 3753 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 18910132 | ROLLOVER MONITORING SYSTEM | DIZON, EDWARD ANDREW IZON | 3663 | §103 | Non-Final OA | — | Pending | Oct 09, 2024 |
| 18781438 | HIGH-CAPACITY BALER WITH COMMON NEEDLE FRAME | DICKSTEIN, WILLIAM DOUGLAS | 3725 | §102§103§112DP | Non-Final OA | — | Pending | Jul 23, 2024 |
| 18647230 | REMOVABLE SEED DISTRIBUTION CONTROL SYSTEM FOR AGRICULTURAL SEEDING MACHINE | WOOD, DOUGLAS S | 3672 | §102§103 | Final Rejection | — | Pending | Apr 26, 2024 |
| 18437880 | ENDWISE TRANSPORTABLE IMPLEMENT WITH SEQUENTIAL HYDRAULIC CIRCUIT | KNAUF, MORGAN MARIE | 3611 | §102§103§112 | Non-Final OA | — | Pending | Feb 09, 2024 |
| 18533654 | DISPLAY FOR A WORK MACHINE | CHEN, JOSE V | 3637 | §103 | Non-Final OA | 33d | Pending | Dec 08, 2023 |
| 18533470 | HVAC DUCTING FOR WORK MACHINE | LAUGHLIN, ELIZABETH ANN | 3762 | §102§103 | Final Rejection | 34d | Pending | Dec 08, 2023 |
| 18516313 | VISION SYSTEM FOR METERING DEVICE | TORRES, ALICIA M | 3671 | §103 | Final Rejection | 43d overdue | Pending | Nov 21, 2023 |
| 18489618 | AUTONOMOUS AGRICULTURAL SYSTEM | CHEN, SHELLEY | 3665 | §103 | Non-Final OA | 38d overdue | Pending | Oct 18, 2023 |
| 18489519 | AUTONOMOUS AGRICULTURAL SYSTEM | CHEN, SHELLEY | 3665 | §103 | Non-Final OA | — | Pending | Oct 18, 2023 |
| 18489643 | AUTONOMOUS AGRICULTURAL SYSTEM | CHEN, SHELLEY | 3665 | §103§112 | Non-Final OA | — | Pending | Oct 18, 2023 |
| 18484056 | WORK MACHINE SYSTEM FOR MAINTAINING ATTACHMENT POSITION | PEDERSEN, DAVID RUBEN | 3658 | §103 | Final Rejection | 27d | Pending | Oct 10, 2023 |
| 18359666 | WORK MACHINE WITH MULTIPLE HYDRAULIC TANKS | PRICE, CRAIG JAMES | 3753 | §103 | Non-Final OA | — | Pending | Jul 26, 2023 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free TrialGreat Plains Manufacturing Inc. has 12 pending office actions as of October 2026, spread across 10 art units and 10 examiners.
Shelley Chen has the most, with 3 of Great Plains Manufacturing Inc.'s pending office actions.
Mostly Transportation, E-Commerce & Mechanical Systems (USPTO Tech Center 3600), based on where its pending office actions are examined.