Technology areas: Semiconductors, Circuits & Optics • Transportation, E-Commerce & Mechanical Systems • Medical Devices & Mechanical Engineering
19 pending office actions • 15 art units • 19 examiners • 0 of 19 (0%) have an AI response strategy ready • 52 patents granted in the last 365 days
Greenworks (Jiangsu) Co. Ltd. has 18 pending office actions in Transportation, E-Commerce & Mechanical Systems. The matters involve 18 distinct examiners and 14 distinct art units, indicating full examiner dispersion with recurring activity within some technical groups.
ERB, NATHAN is the busiest examiner, with 1 pending action. The portfolio calls for matter-specific examiner preparation, supported by art-unit tracking for any repeated technical issues.
Based on the USPTO statutory response window for each pending office action. 2 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 + other | 1 (5%) |
| §103 only | 6 (32%) |
| §102 only | 1 (5%) |
| Multi-statute (no §101) | 11 (58%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| ERB, NATHAN | 1 | 51.4% | -0.1% |
| MICHALSKI, SEAN M | 1 | 53.4% | +12.8% |
| SHAHINIAN, LEVON J | 1 | 85.7% | -6.5% |
| COY, NICOLE A | 1 | 78.2% | -2.3% |
| MULLINS, BURTON S | 1 | 68.9% | +1.4% |
| MAYO, TARA LEIGH | 1 | 74.6% | +11.4% |
| DO, NHAT CHIEU Q | 1 | 64.0% | +48.7% |
| RILEY, JONATHAN G | 1 | 52.2% | +30.1% |
| ONDREJCAK, ANDREW DOMENIC | 1 | 45.8% | +43.2% |
| RESTIFO, JEFFREY J | 1 | 79.2% | +10.7% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 1 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19017853 | Pressure Washer | SHAHINIAN, LEVON J | — |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18330387 | Handheld vacuum cleaner | MULLER, BRYAN R | 3d overdue |
| 19332030 | Management system and management method of garden tool | ERB, NATHAN | — |
| 19012829 | SNOW PLOW | COY, NICOLE A | — |
| 18985062 | Power head and outdoor power equipment using the same | MULLINS, BURTON S | — |
| 18966079 | MOWER SYSTEM AND CONNECTING DEVICE THEREOF | MAYO, TARA LEIGH | — |
| 18926459 | CUTTING SAW AND CONTROL METHOD OF THE CUTTING SAW | DO, NHAT CHIEU Q | — |
| 18898582 | POWER TOOL APPARATUS | RILEY, JONATHAN G | — |
| 18820367 | SPRAY GENERATION APPARATUS | ONDREJCAK, ANDREW DOMENIC | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 6 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19091890 | Chainsaw | MICHALSKI, SEAN M | — |
| 18966079 | MOWER SYSTEM AND CONNECTING DEVICE THEREOF | MAYO, TARA LEIGH | — |
| 18926459 | CUTTING SAW AND CONTROL METHOD OF THE CUTTING SAW | DO, NHAT CHIEU Q | — |
| 18898582 | POWER TOOL APPARATUS | RILEY, JONATHAN G | — |
| 18820367 | SPRAY GENERATION APPARATUS | ONDREJCAK, ANDREW DOMENIC | — |
| 18815837 | GO-KART | RESTIFO, JEFFREY J | — |
| Art Unit | Apps |
|---|---|
| 3724 | 3 |
| 3671 | 2 |
| 3723 | 2 |
| 3628 | 1 |
| 1711 | 1 |
| 3672 | 1 |
| 2834 | 1 |
| 3752 | 1 |
| 3613 | 1 |
| 3658 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19332030 | Management system and management method of garden tool | ERB, NATHAN | 3628 | §101§103 | Non-Final OA | — | Pending | Sep 17, 2025 |
| 19091890 | Chainsaw | MICHALSKI, SEAN M | 3724 | §102 | Non-Final OA | — | Pending | Mar 27, 2025 |
| 19017853 | Pressure Washer | SHAHINIAN, LEVON J | 1711 | §103 | Non-Final OA | — | Pending | Jan 13, 2025 |
| 19012829 | SNOW PLOW | COY, NICOLE A | 3672 | §102§103 | Final Rejection | — | Pending | Jan 07, 2025 |
| 18985062 | Power head and outdoor power equipment using the same | MULLINS, BURTON S | 2834 | §102§103 | Non-Final OA | — | Pending | Dec 18, 2024 |
| 18966079 | MOWER SYSTEM AND CONNECTING DEVICE THEREOF | MAYO, TARA LEIGH | 3671 | §102§112 | Non-Final OA | — | Pending | Dec 02, 2024 |
| 18926459 | CUTTING SAW AND CONTROL METHOD OF THE CUTTING SAW | DO, NHAT CHIEU Q | 3724 | §103§112 | Non-Final OA | — | Pending | Oct 25, 2024 |
| 18898582 | POWER TOOL APPARATUS | RILEY, JONATHAN G | 3724 | §103§112 | Final Rejection | — | Pending | Sep 26, 2024 |
| 18820367 | SPRAY GENERATION APPARATUS | ONDREJCAK, ANDREW DOMENIC | 3752 | §103§112 | Non-Final OA | — | Pending | Aug 30, 2024 |
| 18815837 | GO-KART | RESTIFO, JEFFREY J | 3613 | §103 | Non-Final OA | — | Pending | Aug 27, 2024 |
| 18782035 | CONTROL METHOD OF OUTDOOR POWER EQUIPMENT AND OUTDOOR POWER EQUIPMENT | EL SAYAH, MOHAMAD O | 3658 | §103§112 | Non-Final OA | — | Pending | Jul 24, 2024 |
| 18638740 | OUTDOOR POWER EQUIPMENT AND RELATED METHODS | BREGEL, EVAN ANTHONY | 3671 | §102§103 | Non-Final OA | — | Pending | Apr 18, 2024 |
| 18592540 | MULTI-SLOT CHARGER | VO, TUYEN KIM | 2876 | §103 | Non-Final OA | — | Pending | Mar 01, 2024 |
| 18432034 | POWER SUPPLY CONTROL CIRCUITS, POWER TOOLS, AND POWER TOOL SYSTEMS | BARNIE, REXFORD N | 2836 | §103 | Non-Final OA | — | Pending | Feb 04, 2024 |
| 18292487 | OUTDOOR POWER MACHINE CONTROL INTERFACE | KAZIMI, MAHMOUD M | 3665 | §103 | Non-Final OA | — | Pending | Jan 26, 2024 |
| 18520567 | Vacuum cleaning system | HOLIZNA, CALEB ANDREW | 3723 | §103 | Final Rejection | 69d | Pending | Nov 28, 2023 |
| 18519077 | Charging device and application thereof | ZHOU, ZIXUAN | 2859 | §102§103 | Non-Final OA | — | Pending | Nov 27, 2023 |
| 18450370 | Battery pack, battery thermal management system and battery thermal management control method | LUO, KAN | 1751 | §102§103 | Non-Final OA | — | Pending | Aug 15, 2023 |
| 18330387 | Handheld vacuum cleaner | MULLER, BRYAN R | 3723 | §103§112 | Non-Final OA | 3d overdue | Pending | Jun 07, 2023 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free TrialGreenworks (Jiangsu) Co., Ltd. has 19 pending office actions as of October 2026, spread across 15 art units and 19 examiners.
Nathan Erb has the most, with 1 of Greenworks (Jiangsu) Co., Ltd.'s pending office actions.
Mostly Transportation, E-Commerce & Mechanical Systems (USPTO Tech Center 3600), based on where its pending office actions are examined.