Technology area: Computing & Software
1 pending office actions • 1 art units • 1 examiners • 0 of 1 (0%) have an AI response strategy ready
Guangxi Power Grid Corporation currently manages 1 pending office action in the Computing & Software technology area. This single matter is assigned to the busiest examiner, VELEZ-LOPEZ, MARIO M, within 1 distinct art unit. The prosecution involves a distinct examiner, reflecting a focused path for its current filings.
Because the portfolio is limited to 1 distinct art unit, the company's software innovations are currently being reviewed within a specific technical classification at the patent office. This concentration under a single examiner indicates a streamlined review process for the company's active intellectual property matters.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 + other | 1 (100%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| VELEZ-LOPEZ, MARIO M | 1 | 74.5% | +5.0% |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 1 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18521269 | METHOD AND DEVICE FOR DETERMINING DAILY PEAK LOAD REGULATION CAPACITY OF HYDROPOWER STATION | VELEZ-LOPEZ, MARIO M | — |
| Art Unit | Apps |
|---|---|
| 2115 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 18521269 | METHOD AND DEVICE FOR DETERMINING DAILY PEAK LOAD REGULATION CAPACITY OF HYDROPOWER STATION | VELEZ-LOPEZ, MARIO M | 2115 | §101§112 | Non-Final OA | — | Pending | Nov 28, 2023 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free TrialGuangxi Power Grid Corporation has 1 pending office actions as of October 2026, spread across 1 art units and 1 examiners.
Mario M Velez-Lopez has the most, with 1 of Guangxi Power Grid Corporation's pending office actions.
Mostly Computing & Software (USPTO Tech Center 2100), based on where its pending office actions are examined.