Technology areas: Semiconductors, Circuits & Optics • Transportation, E-Commerce & Mechanical Systems
3 pending office actions • 3 art units • 3 examiners • 0 of 3 (0%) have an AI response strategy ready • 5 patents granted in the last 365 days
Guangxi University has 4 pending office actions in Semiconductors, Circuits & Optics. The matters involve 4 distinct examiners across 3 distinct art units, so the portfolio includes multiple examiner relationships with some art-unit concentration. That structure calls for coordinated oversight while preserving matter-specific prosecution positions.
HINZE, LEO T is the busiest examiner with 1 pending matter. Counsel should monitor consistency in semiconductor terminology and technical explanations across the matters, while tailoring amendments and arguments to each examiner’s cited art and assigned unit.
Based on the USPTO statutory response window for each pending office action. 1 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 + other | 1 (33%) |
| §102 only | 1 (33%) |
| §112 only | 1 (33%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| HINZE, LEO T | 1 | 52.9% | +10.2% |
| BACA, MATTHEW WALTER | 1 | 71.7% | +5.6% |
| PATEL, KALPIT CHANDRAKANT | 1 | 80.0% | +25.0% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 1 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18336068 | COLD-CAST ANCHOR STAY CABLE CONTAINING FIBER GRATING STRAIN AND INSTALLATION METHOD THEREOF | PATEL, KALPIT CHANDRAKANT | 9d |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 1 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18641474 | MULTI-ENGINE SYNCHRONOUS DETECTION AND ANALYSIS SYSTEM | BACA, MATTHEW WALTER | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 2 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18336068 | COLD-CAST ANCHOR STAY CABLE CONTAINING FIBER GRATING STRAIN AND INSTALLATION METHOD THEREOF | PATEL, KALPIT CHANDRAKANT | 9d |
| 18832745 | WATER FILLING AND DRAINAGE TEST METHOD AND DEVICE FOR PREFABRICATED CRACK-CONTAINING REINFORCED CONCRETE LINING PRESSURE TUNNEL | HINZE, LEO T | — |
| Art Unit | Apps |
|---|---|
| 2853 | 1 |
| 2857 | 1 |
| 3671 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 18832745 | WATER FILLING AND DRAINAGE TEST METHOD AND DEVICE FOR PREFABRICATED CRACK-CONTAINING REINFORCED CONCRETE LINING PRESSURE TUNNEL | HINZE, LEO T | 2853 | §112 | Non-Final OA | — | Pending | Jul 24, 2024 |
| 18641474 | MULTI-ENGINE SYNCHRONOUS DETECTION AND ANALYSIS SYSTEM | BACA, MATTHEW WALTER | 2857 | §101§103 | Final Rejection | — | Pending | Apr 22, 2024 |
| 18336068 | COLD-CAST ANCHOR STAY CABLE CONTAINING FIBER GRATING STRAIN AND INSTALLATION METHOD THEREOF | PATEL, KALPIT CHANDRAKANT | 3671 | §102 | Non-Final OA | 9d | Pending | Jun 16, 2023 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free TrialGuangxi University has 3 pending office actions as of October 2026, spread across 3 art units and 3 examiners.
Leo T Hinze has the most, with 1 of Guangxi University's pending office actions.
Mostly Semiconductors, Circuits & Optics (USPTO Tech Center 2800), based on where its pending office actions are examined.