Prosecution Insights
Last updated: November 04, 2026

Heyuan Power Supply Bureau Of Guangdong Power Grid Corporation

Technology areas: Computing & Software • Transportation, E-Commerce & Mechanical Systems

2 pending office actions • 2 art units • 2 examiners • 0 of 2 (0%) have an AI response strategy ready

Analysis

Heyuan Power Supply Bureau Of Guangdong Power Grid Corporation has 2 pending office actions in Computing & Software. The matters involve 2 distinct examiners and 2 distinct art units, indicating separate examination paths within the technology area.

UDDIN, MD I is the busiest examiner, with 1 pending matter. Counsel should track each response independently while preserving consistent positions on software-related claim scope and supporting disclosure.

Written from this page's own data; every figure is computed from USPTO records and verified before publication.

Portfolio Summary

2
Total Pending OAs
0
Non-Final OAs
1
Final Rejections
1
Advisory / Quayle

Case Difficulty Mix

Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.

1
Hard (50%)
1
Medium (50%)
0
Easy (0%)
0
Unknown (0%)

Rejection Statute Mix

BucketCases
§101 + other1 (50%)
§103 only1 (50%)

Industry Mix

How the docket's pending cases split across USPTO tech-center bands.

0
Life Sciences
0% of docket
1
Information Tech
50% of docket
0
Communications
0% of docket
0
Semiconductors
0% of docket
1
Mechanical / Eng
50% of docket
0
Business / Other
0% of docket

Time-on-OA Estimate

Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.

20 h
Manual time on pending OAs
4 h
Time saved (low, 20%)
7 h
Time saved (mid, 35%)
0.2 wks
FTE-weeks freed (mid)

Top Examiners on this docket

ExaminerApps on this docketAllow rateInterview lift
UDDIN, MD I 1 77.0% +73.5%
TANG, BRYANT 1 86.1% +0.2%

Quick Wins (1)

Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 1 ordered by deadline are shown.

App #TitleExaminerDue in
19006770 LIVE WORKING ROBOT AND METHOD FOR MAINTAINING HIGH-VOLTAGE ELECTRICAL DEVICE TANG, BRYANT —

Hard Cases (1)

Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 1 ordered by deadline are shown.

App #TitleExaminerDue in
19006703 METHOD AND APPARATUS FOR CLASSIFYING ELECTRICAL LOADS, ELECTRONIC DEVICE, MEDIUM AND PRODUCT UDDIN, MD I —

Interview Candidates (1)

Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 1 ordered by deadline are shown.

App #TitleExaminerDue in
19006703 METHOD AND APPARATUS FOR CLASSIFYING ELECTRICAL LOADS, ELECTRONIC DEVICE, MEDIUM AND PRODUCT UDDIN, MD I —

Top Art Units

Art UnitApps
2169 1
3658 1

Pending Office Actions

App #TitleExaminerArt UnitStatutesStatusDue inAIFiled
19006703 METHOD AND APPARATUS FOR CLASSIFYING ELECTRICAL LOADS, ELECTRONIC DEVICE, MEDIUM AND PRODUCT UDDIN, MD I 2169 §101§103 Non-Final OA — Pending Dec 31, 2024
19006770 LIVE WORKING ROBOT AND METHOD FOR MAINTAINING HIGH-VOLTAGE ELECTRICAL DEVICE TANG, BRYANT 3658 §103 Final Rejection — Pending Dec 31, 2024

Managing Heyuan Power Supply Bureau Of Guangdong Power Grid Corporation's Patent Portfolio?

IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.

Start Free Trial

Frequently Asked Questions

How many pending USPTO office actions does Heyuan Power Supply Bureau Of Guangdong Power Grid Corporation have?

Heyuan Power Supply Bureau Of Guangdong Power Grid Corporation has 2 pending office actions as of November 2026, spread across 2 art units and 2 examiners.

Which USPTO examiner handles the most Heyuan Power Supply Bureau Of Guangdong Power Grid Corporation applications?

Md I Uddin has the most, with 1 of Heyuan Power Supply Bureau Of Guangdong Power Grid Corporation's pending office actions.

What technology area are Heyuan Power Supply Bureau Of Guangdong Power Grid Corporation's patent applications in?

Mostly Computing & Software (USPTO Tech Center 2100), based on where its pending office actions are examined.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month