Technology area: Transportation, E-Commerce & Mechanical Systems
4 pending office actions • 2 art units • 4 examiners • 0 of 4 (0%) have an AI response strategy ready • 9 patents granted in the last 365 days
Itrec B.V. has 4 pending office actions in Transportation, E-Commerce & Mechanical Systems. The matters involve 4 distinct examiners and 2 distinct art units, creating a small but divided prosecution profile across examination groups.
FIORELLO, BENJAMIN F is the busiest examiner, with 1 pending matter. Counsel can compare matters within the two art units, but each response should account for the separate examiner assigned to it.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §103 only | 1 (25%) |
| Multi-statute (no §101) | 2 (50%) |
| No statute on record | 1 (25%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| FIORELLO, BENJAMIN F | 1 | 73.9% | +7.5% |
| VU, STEPHEN A | 1 | 82.1% | +14.8% |
| OQUENDO, CARIB A | 1 | 78.0% | +12.2% |
| CAMPOS JR, JUAN J | 1 | 68.8% | +19.6% |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 2 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19104623 | INSTALLING A HEAVY LIFT CRANE SYSTEM AT A HOISTING SITE | VU, STEPHEN A | — |
| 18728658 | CRANE AND METHOD FOR HANDLING OF ONE OR MORE WIND TURBINE COMPONENTS | CAMPOS JR, JUAN J | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 3 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19104623 | INSTALLING A HEAVY LIFT CRANE SYSTEM AT A HOISTING SITE | VU, STEPHEN A | — |
| 18857005 | METHOD FOR INSTALLATION OF AN OFFSHORE WIND TURBINE FOUNDATION MONOPILE | OQUENDO, CARIB A | — |
| 18728658 | CRANE AND METHOD FOR HANDLING OF ONE OR MORE WIND TURBINE COMPONENTS | CAMPOS JR, JUAN J | — |
| Art Unit | Apps |
|---|---|
| 3678 | 2 |
| 3654 | 2 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19213426 | INSTALLATION OF A WIND TURBINE ON A FLOATING FOUNDATION | FIORELLO, BENJAMIN F | 3678 | Other | Non-Final OA | — | Pending | May 20, 2025 |
| 19104623 | INSTALLING A HEAVY LIFT CRANE SYSTEM AT A HOISTING SITE | VU, STEPHEN A | 3654 | §102§112 | Non-Final OA | — | Pending | Feb 18, 2025 |
| 18857005 | METHOD FOR INSTALLATION OF AN OFFSHORE WIND TURBINE FOUNDATION MONOPILE | OQUENDO, CARIB A | 3678 | §103 | Final Rejection | — | Pending | Oct 15, 2024 |
| 18728658 | CRANE AND METHOD FOR HANDLING OF ONE OR MORE WIND TURBINE COMPONENTS | CAMPOS JR, JUAN J | 3654 | §103§112 | Final Rejection | — | Pending | Jul 12, 2024 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free TrialItrec B.V. has 4 pending office actions as of October 2026, spread across 2 art units and 4 examiners.
Benjamin F Fiorello has the most, with 1 of Itrec B.V.'s pending office actions.
Mostly Transportation, E-Commerce & Mechanical Systems (USPTO Tech Center 3600), based on where its pending office actions are examined.