5 pending office actions • 3 art units • 5 examiners • 0 of 5 (0%) have an AI response strategy ready • 8 patents granted in the last 365 days
Based on the USPTO statutory response window for each pending office action. 2 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 + other | 2 (40%) |
| §102 only | 1 (20%) |
| Multi-statute (no §101) | 2 (40%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| WORJLOH, JALATEE | 1 | 64.3% | +38.0% |
| HAILE, BENYAM | 1 | 62.0% | +24.2% |
| DURDEN, RICHARD KYLE | 1 | 61.5% | +30.0% |
| VANWORMER, SKYLAR K | 1 | 45.2% | +25.4% |
| DROUIN, STEVE HOANG | 1 | 100.0% | +0.0% |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 4 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18355219 | USE OF SMO INHIBITOR IN PREPARATION OF DRUG FOR PREVENTING, DELAYING OR ALLEVIATING ACCESS STENOSIS OF ARTERIOVENOUS FISTULA | DROUIN, STEVE HOANG | 11d overdue |
| 19294174 | METHOD AND SYSTEM FOR AUDITABLE OFF-CHAIN TRANSACTION IN BLOCK-CHAIN NETWORK | WORJLOH, JALATEE | — |
| 18666700 | FLEXIBLE HOSE MATERIAL AND A WATER PIPE MADE OF THE FLEXIBLE HOSE MATERIAL | DURDEN, RICHARD KYLE | — |
| 18613006 | METHOD FOR BUILDING BLOCKCHAIN-BASED SECURE AGGREGATION IN FEDERATED LEARNING WITH DATA REMOVAL | VANWORMER, SKYLAR K | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 4 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18768343 | DETECTION METHOD AND DEVICE FOR ENERGY STORAGE DEVICES | HAILE, BENYAM | 8d overdue |
| 19294174 | METHOD AND SYSTEM FOR AUDITABLE OFF-CHAIN TRANSACTION IN BLOCK-CHAIN NETWORK | WORJLOH, JALATEE | — |
| 18666700 | FLEXIBLE HOSE MATERIAL AND A WATER PIPE MADE OF THE FLEXIBLE HOSE MATERIAL | DURDEN, RICHARD KYLE | — |
| 18613006 | METHOD FOR BUILDING BLOCKCHAIN-BASED SECURE AGGREGATION IN FEDERATED LEARNING WITH DATA REMOVAL | VANWORMER, SKYLAR K | — |
| Art Unit | Apps |
|---|---|
| 3697 | 1 |
| 2688 | 1 |
| 1627 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19294174 | METHOD AND SYSTEM FOR AUDITABLE OFF-CHAIN TRANSACTION IN BLOCK-CHAIN NETWORK | WORJLOH, JALATEE | 3697 | §101§103§112 | Non-Final OA | — | Pending | Aug 07, 2025 |
| 18768343 | DETECTION METHOD AND DEVICE FOR ENERGY STORAGE DEVICES | HAILE, BENYAM | 2688 | §102 | Non-Final OA | 8d overdue | Pending | Jul 10, 2024 |
| 18666700 | FLEXIBLE HOSE MATERIAL AND A WATER PIPE MADE OF THE FLEXIBLE HOSE MATERIAL | DURDEN, RICHARD KYLE | — | §103§112 | Non-Final OA | — | Pending | May 16, 2024 |
| 18613006 | METHOD FOR BUILDING BLOCKCHAIN-BASED SECURE AGGREGATION IN FEDERATED LEARNING WITH DATA REMOVAL | VANWORMER, SKYLAR K | — | §101§103 | Non-Final OA | — | Pending | Mar 21, 2024 |
| 18355219 | USE OF SMO INHIBITOR IN PREPARATION OF DRUG FOR PREVENTING, DELAYING OR ALLEVIATING ACCESS STENOSIS OF ARTERIOVENOUS FISTULA | DROUIN, STEVE HOANG | 1627 | §102§103 | Non-Final OA | 11d overdue | Pending | Jul 19, 2023 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial