Technology areas: Computing & Software • Transportation, E-Commerce & Mechanical Systems • Medical Devices & Mechanical Engineering
4 pending office actions • 3 art units • 3 examiners • 0 of 4 (0%) have an AI response strategy ready • 4 patents granted in the last 365 days
Korea Railroad Research Institute has 4 pending office actions in Transportation, E-Commerce & Mechanical Systems. The matters involve 3 distinct examiners and 3 distinct art units, indicating one repeated examiner relationship and one repeated art-unit relationship.
BARZEGAR, PEGAH is the busiest examiner, with 2 pending matters. Counsel should review those related matters together for consistent technical and claim positions, while separately managing the other assignments.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 + other | 1 (25%) |
| §103 only | 2 (50%) |
| Multi-statute (no §101) | 1 (25%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| BARZEGAR, PEGAH | 2 | 73.7% | +42.1% |
| BRYAN, JASON B | 1 | 76.6% | +14.2% |
| THONG, YEONG JUEN | 1 | 48.8% | +53.9% |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 2 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19267040 | MULTI-ACCESS EDGE COMPUTING SYSTEM HAVING FAULT PREVENTION FUNCTION AND METHOD FOR PREVENTING FAILURE THEREOF | BRYAN, JASON B | — |
| 18908833 | PREFABRICATED WIRE MESH ASSEMBLY FOR BALLAST AND METHOD OF CONSTRUCTING GRAVEL-BALLASTED TRACK USING THE SAME | BARZEGAR, PEGAH | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 4 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19267040 | MULTI-ACCESS EDGE COMPUTING SYSTEM HAVING FAULT PREVENTION FUNCTION AND METHOD FOR PREVENTING FAILURE THEREOF | BRYAN, JASON B | — |
| 18908833 | PREFABRICATED WIRE MESH ASSEMBLY FOR BALLAST AND METHOD OF CONSTRUCTING GRAVEL-BALLASTED TRACK USING THE SAME | BARZEGAR, PEGAH | — |
| 18776296 | SYSTEM AND METHOD FOR DIAGNOSING OPERATIONAL SAFETY OF RAILCARS | BARZEGAR, PEGAH | — |
| 18331916 | UNIFORMLY-HEATING SYSTEM FOR CURING CONCRETE | THONG, YEONG JUEN | — |
| Art Unit | Apps |
|---|---|
| 3615 | 2 |
| 2114 | 1 |
| 3761 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19267040 | MULTI-ACCESS EDGE COMPUTING SYSTEM HAVING FAULT PREVENTION FUNCTION AND METHOD FOR PREVENTING FAILURE THEREOF | BRYAN, JASON B | 2114 | §101§102§103§112 | Non-Final OA | — | Pending | Jul 11, 2025 |
| 18908833 | PREFABRICATED WIRE MESH ASSEMBLY FOR BALLAST AND METHOD OF CONSTRUCTING GRAVEL-BALLASTED TRACK USING THE SAME | BARZEGAR, PEGAH | 3615 | §103§112 | Non-Final OA | — | Pending | Oct 08, 2024 |
| 18776296 | SYSTEM AND METHOD FOR DIAGNOSING OPERATIONAL SAFETY OF RAILCARS | BARZEGAR, PEGAH | 3615 | §103 | Non-Final OA | — | Pending | Jul 18, 2024 |
| 18331916 | UNIFORMLY-HEATING SYSTEM FOR CURING CONCRETE | THONG, YEONG JUEN | 3761 | §103 | Final Rejection | — | Pending | Jun 08, 2023 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free TrialKorea Railroad Research Institute has 4 pending office actions as of October 2026, spread across 3 art units and 3 examiners.
Pegah Barzegar has the most, with 2 of Korea Railroad Research Institute's pending office actions.
Mostly Transportation, E-Commerce & Mechanical Systems (USPTO Tech Center 3600), based on where its pending office actions are examined.