Prosecution Insights
Last updated: October 04, 2026

Liebherr-Components Biberach GmbH

Technology area: Semiconductors, Circuits & Optics

2 pending office actions • 1 art units • 2 examiners • 0 of 2 (0%) have an AI response strategy ready • 5 patents granted in the last 365 days

Analysis

Liebherr-Components Biberach GmbH has 2 pending office actions in the Semiconductors, Circuits & Optics technology area. These actions are assigned to 2 distinct examiners and 1 distinct art unit. JAMES PILKINGTON is the busiest examiner for the portfolio, currently handling 1 pending office action.

The 2 pending office actions are split between 2 distinct examiners, meaning each examiner is responsible for one matter. This distribution indicates that no single examiner is overwhelmed by the company's current filings. The 1 distinct art unit suggests that both actions are being reviewed within the same technical group. JAMES PILKINGTON is one of the two individuals managing the current workload in the Semiconductors, Circuits & Optics area.

Because the 2 pending office actions are located in 1 distinct art unit, the technical focus of the portfolio is concentrated. The prosecution team must manage relationships with 2 distinct examiners, including JAMES PILKINGTON. Each of these 2 distinct examiners handles 1 pending office action. This arrangement requires a strategy that addresses the individual preferences of both examiners while operating within the same art unit. The 1 pending office action managed by JAMES PILKINGTON represents half of the company's active matters.

Written from this page's own data; every figure is computed from USPTO records and verified before publication.

Portfolio Summary

2
Total Pending OAs
1
Non-Final OAs
1
Final Rejections
0
Advisory / Quayle

Case Difficulty Mix

Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.

2
Hard (100%)
0
Medium (0%)
0
Easy (0%)
0
Unknown (0%)

Rejection Statute Mix

BucketCases
Multi-statute (no §101)2 (100%)

Industry Mix

How the docket's pending cases split across USPTO tech-center bands.

0
Life Sciences
0% of docket
0
Information Tech
0% of docket
0
Communications
0% of docket
1
Semiconductors
50% of docket
0
Mechanical / Eng
0% of docket
1
Business / Other
50% of docket

Time-on-OA Estimate

Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.

20 h
Manual time on pending OAs
4 h
Time saved (low, 20%)
7 h
Time saved (mid, 35%)
0.2 wks
FTE-weeks freed (mid)

Top Examiners on this docket

ExaminerApps on this docketAllow rateInterview lift
PILKINGTON, JAMES 1 70.2% +35.7%
MAI, THIEN T 1 59.2% +19.8%

Hard Cases (2)

Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 2 ordered by deadline are shown.

App #TitleExaminerDue in
19244932 ROLLING BEARING PILKINGTON, JAMES —
18272555 ENERGY SUPPLY STATION FOR THE ELECTRIFICATION OF CONSTRUCTION SITES AND METHOD FOR SUPPLYING A CONSTRUCTION SITE WITH ELECTRICAL ENERGY MAI, THIEN T —

Interview Candidates (2)

Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 2 ordered by deadline are shown.

App #TitleExaminerDue in
19244932 ROLLING BEARING PILKINGTON, JAMES —
18272555 ENERGY SUPPLY STATION FOR THE ELECTRIFICATION OF CONSTRUCTION SITES AND METHOD FOR SUPPLYING A CONSTRUCTION SITE WITH ELECTRICAL ENERGY MAI, THIEN T —

Top Art Units

Art UnitApps
2876 1

Pending Office Actions

App #TitleExaminerArt UnitStatutesStatusDue inAIFiled
19244932 ROLLING BEARING PILKINGTON, JAMES — §102§103§112 Non-Final OA — Pending Jun 20, 2025
18272555 ENERGY SUPPLY STATION FOR THE ELECTRIFICATION OF CONSTRUCTION SITES AND METHOD FOR SUPPLYING A CONSTRUCTION SITE WITH ELECTRICAL ENERGY MAI, THIEN T 2876 §102§103 Final Rejection — Pending Jul 14, 2023

Managing Liebherr-Components Biberach GmbH's Patent Portfolio?

IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.

Start Free Trial

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month