2 pending office actions • 1 art units • 2 examiners • 0 of 2 (0%) have an AI response strategy ready
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §112 only | 1 (50%) |
| Multi-statute (no §101) | 1 (50%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| BROWNE, SCOTT A | 1 | 72.0% | +35.6% |
| BELLINGER, JASON R | 1 | 70.0% | +18.7% |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 1 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18865059 | CRAWLER TRACK LINK FOR A SUPPORT CARRIAGE OF A MACHINE FOR LAYING OR RENOVATING A RAILWAY LINE AND ARTICULATED ASSEMBLY OF SUCH | BELLINGER, JASON R | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 2 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18868025 | METHOD FOR DETERMINING AT LEAST ONE GEOMETRY PARAMETER OF A RAILROAD TRACK AND SYSTEM FOR IMPLEMENTING THE METHOD | BROWNE, SCOTT A | — |
| 18865059 | CRAWLER TRACK LINK FOR A SUPPORT CARRIAGE OF A MACHINE FOR LAYING OR RENOVATING A RAILWAY LINE AND ARTICULATED ASSEMBLY OF SUCH | BELLINGER, JASON R | — |
| Art Unit | Apps |
|---|---|
| 3615 | 2 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 18868025 | METHOD FOR DETERMINING AT LEAST ONE GEOMETRY PARAMETER OF A RAILROAD TRACK AND SYSTEM FOR IMPLEMENTING THE METHOD | BROWNE, SCOTT A | 3615 | §112 | Non-Final OA | — | Pending | Nov 21, 2024 |
| 18865059 | CRAWLER TRACK LINK FOR A SUPPORT CARRIAGE OF A MACHINE FOR LAYING OR RENOVATING A RAILWAY LINE AND ARTICULATED ASSEMBLY OF SUCH | BELLINGER, JASON R | 3615 | §102§103§112 | Non-Final OA | — | Pending | Nov 12, 2024 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial