Technology areas: Chemistry & Materials • Semiconductors, Circuits & Optics • Transportation, E-Commerce & Mechanical Systems
22 pending office actions • 15 art units • 18 examiners • 0 of 22 (0%) have an AI response strategy ready • 25 patents granted in the last 365 days
Nextpower LLC has 23 pending office actions in Transportation, E-Commerce & Mechanical Systems. The workload is distributed across 18 distinct examiners and 15 distinct art units. The difference between the office-action figure and the assignment figures indicates some repetition in both examiner and technical-unit coverage.
CANNON, RYAN SMITH is the busiest examiner, with 3 pending matters. That concentration is meaningful within the listed portfolio, although the broader docket still requires coordination across numerous examiner relationships. Counsel can use recurring art-unit and examiner experience to standardize issue analysis while preserving matter-specific claim strategies.
Based on the USPTO statutory response window for each pending office action. 7 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 7 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 only | 1 (5%) |
| §101 + other | 2 (9%) |
| §103 only | 2 (9%) |
| §102 only | 5 (23%) |
| §112 only | 1 (5%) |
| Multi-statute (no §101) | 10 (45%) |
| No statute on record | 1 (5%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| CANNON, RYAN SMITH | 3 | 55.8% | +36.9% |
| BAILLARGEON, PAUL D | 2 | 78.0% | +4.7% |
| TRIVISONNO, ANGELO | 2 | 52.8% | +25.8% |
| SINGH, SUNIL | 1 | 67.4% | +24.8% |
| NGUYEN, CHI Q | 1 | 82.4% | +12.4% |
| SINGH, GURKANWALJIT | 1 | 60.8% | +26.4% |
| FIORELLO, BENJAMIN F | 1 | 73.9% | +7.5% |
| WHITE, SADIE | 1 | 49.3% | +31.2% |
| COZART, JERMIE E | 1 | 83.9% | +3.3% |
| AZAD, MD ABUL K | 1 | 81.5% | +20.9% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 1 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18936759 | METHODS OF MANUFACTURING A PORTABLE CRIMPING DEVICE FOR JOINING FOUNDATION COMPONENTS | COZART, JERMIE E | — |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18214953 | MAXIMIZING OUTPUT OF A SOLAR ENERGY SYSTEM UNDER REDUCED IRRADIANCE CONDITIONS | CANNON, RYAN SMITH | 97d overdue |
| 18396544 | HYBRID WATER SYSTEM FOR AGRO-PV SYSTEM | CANNON, RYAN SMITH | 4d overdue |
| 19009273 | SOLAR MODULE FRAME COUPLINGS | TRIVISONNO, ANGELO | 40d |
| 18945790 | HORIZONTAL BALANCED SOLAR TRACKER | WHITE, SADIE | 48d |
| 19257294 | Frames for Solar Panels | CANNON, RYAN SMITH | — |
| 19173978 | GROUND PILE STRUCTURES FOR SOLAR TRACKING SYSTEMS | SINGH, SUNIL | — |
| 19089406 | SYSTEMS, METHODS, AND MACHINES FOR JOINING TRUSS FOUNDATION COMPONENTS WITHOUT MECHANICAL FASTENERS | NGUYEN, CHI Q | — |
| 19054834 | SYSTEMS FOR AND METHODS OF LEARNING FOR ON-DEMAND OPTIMAL ELECTRIC VEHICLE (EV) FLEET OPERATION | SINGH, GURKANWALJIT | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18214953 | MAXIMIZING OUTPUT OF A SOLAR ENERGY SYSTEM UNDER REDUCED IRRADIANCE CONDITIONS | CANNON, RYAN SMITH | 97d overdue |
| 18396544 | HYBRID WATER SYSTEM FOR AGRO-PV SYSTEM | CANNON, RYAN SMITH | 4d overdue |
| 19009273 | SOLAR MODULE FRAME COUPLINGS | TRIVISONNO, ANGELO | 40d |
| 18945790 | HORIZONTAL BALANCED SOLAR TRACKER | WHITE, SADIE | 48d |
| 19257294 | Frames for Solar Panels | CANNON, RYAN SMITH | — |
| 19173978 | GROUND PILE STRUCTURES FOR SOLAR TRACKING SYSTEMS | SINGH, SUNIL | — |
| 19089406 | SYSTEMS, METHODS, AND MACHINES FOR JOINING TRUSS FOUNDATION COMPONENTS WITHOUT MECHANICAL FASTENERS | NGUYEN, CHI Q | — |
| 19054834 | SYSTEMS FOR AND METHODS OF LEARNING FOR ON-DEMAND OPTIMAL ELECTRIC VEHICLE (EV) FLEET OPERATION | SINGH, GURKANWALJIT | — |
| Art Unit | Apps |
|---|---|
| 1726 | 3 |
| 3678 | 3 |
| 2831 | 2 |
| 3635 | 2 |
| 1722 | 2 |
| 3625 | 1 |
| 1721 | 1 |
| 3799 | 1 |
| 2119 | 1 |
| 2876 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19309083 | ALIGNED INSULATION HOOKING BUSBAR | BAILLARGEON, PAUL D | 2831 | §103 | Final Rejection | — | Pending | Aug 25, 2025 |
| 19257294 | Frames for Solar Panels | CANNON, RYAN SMITH | 1726 | §102§103§112 | Final Rejection | — | Pending | Jul 01, 2025 |
| 19173978 | GROUND PILE STRUCTURES FOR SOLAR TRACKING SYSTEMS | SINGH, SUNIL | 3678 | §102§103 | Non-Final OA | — | Pending | Apr 09, 2025 |
| 19089406 | SYSTEMS, METHODS, AND MACHINES FOR JOINING TRUSS FOUNDATION COMPONENTS WITHOUT MECHANICAL FASTENERS | NGUYEN, CHI Q | 3635 | §102§112Other | Non-Final OA | — | Pending | Mar 25, 2025 |
| 19054834 | SYSTEMS FOR AND METHODS OF LEARNING FOR ON-DEMAND OPTIMAL ELECTRIC VEHICLE (EV) FLEET OPERATION | SINGH, GURKANWALJIT | 3625 | §101 | Final Rejection | — | Pending | Feb 15, 2025 |
| 19043096 | ALIGNED INSULATION HOOKING BUSBAR | BAILLARGEON, PAUL D | 2831 | §102 | Final Rejection | — | Pending | Jan 31, 2025 |
| 19012735 | SCREW ANCHOR WITH CONSUMABLE TIP | FIORELLO, BENJAMIN F | 3678 | §103§112 | Non-Final OA | — | Pending | Jan 07, 2025 |
| 19009273 | SOLAR MODULE FRAME COUPLINGS | TRIVISONNO, ANGELO | 1722 | §103§112 | Final Rejection | 40d | Pending | Jan 03, 2025 |
| 18945790 | HORIZONTAL BALANCED SOLAR TRACKER | WHITE, SADIE | 1721 | §102§103 | Final Rejection | 48d | Pending | Nov 13, 2024 |
| 18936759 | METHODS OF MANUFACTURING A PORTABLE CRIMPING DEVICE FOR JOINING FOUNDATION COMPONENTS | COZART, JERMIE E | 3799 | §112 | Non-Final OA | — | Pending | Nov 04, 2024 |
| 18807109 | HAIL STOW SYSTEM AND METHOD | AZAD, MD ABUL K | 2119 | §101§103§112 | Non-Final OA | — | Pending | Aug 16, 2024 |
| 18801932 | INSULATION PIERCING ELECTRICAL CONNECTOR | LEE, SEUNG H | 2876 | §102§103 | Non-Final OA | — | Pending | Aug 13, 2024 |
| 18789942 | SOLAR TRACKER VARIABLE CONNECTION ANGULAR ORIENTATIONS | BAYNES, KEVIN J | 3678 | §102 | Non-Final OA | — | Pending | Jul 31, 2024 |
| 18664683 | LINKED SOLAR TRACKERS | TRIVISONNO, ANGELO | 1722 | §102§103§112 | Non-Final OA | — | Pending | May 15, 2024 |
| 18635529 | SYSTEMS FOR AND METHODS OF INCREASING ELECTRIC VEHICLE UTILIZATION IN TRANSIT FLEETS USING LEARNING, PREDICTIONS, OPTIMIZATION, AND AUTOMATION | CLARE, MARK C | 3628 | §101§103§112 | Non-Final OA | — | Pending | Apr 15, 2024 |
| 18396544 | HYBRID WATER SYSTEM FOR AGRO-PV SYSTEM | CANNON, RYAN SMITH | 1726 | §103§112 | Final Rejection | 4d overdue | Pending | Dec 26, 2023 |
| 18349577 | PARALLEL INVERTER SYSTEMS AND METHODS | QUDDUS, NUSRAT | 2838 | — | Final Rejection | — | Pending | Jul 10, 2023 |
| 18214953 | MAXIMIZING OUTPUT OF A SOLAR ENERGY SYSTEM UNDER REDUCED IRRADIANCE CONDITIONS | CANNON, RYAN SMITH | 1726 | §102§103 | Final Rejection | 97d overdue | Pending | Jun 27, 2023 |
| 18196843 | SUPPORT FRAMES FOR SOLAR TRACKERS | HAWN, PATRICK D | 3631 | §102Other | Non-Final OA | — | Pending | May 12, 2023 |
| 17989728 | SOLAR ENERGY SYSTEM FOR POWERING AN ELECTRONIC ELEMENT | HUFFMAN, JULIAN D | 2859 | §102 | Final Rejection | 79d overdue | Pending | Nov 18, 2022 |
| 17494607 | D-SHAPED TORQUE TUBE AND BEARING ASSEMBLIES | DEEAN, DEEPAK A | 3762 | §103 | Non-Final OA | 2d overdue | Pending | Oct 05, 2021 |
| 17179156 | TRUSS FOUNDATIONS FOR SINGLE-AXIS TRACKERS | HIJAZ, OMAR F | 3635 | §102 | Non-Final OA | 26d overdue | Pending | Feb 18, 2021 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free TrialNextpower LLC has 22 pending office actions as of October 2026, spread across 15 art units and 18 examiners.
Ryan Smith Cannon has the most, with 3 of Nextpower LLC's pending office actions.
Mostly Transportation, E-Commerce & Mechanical Systems (USPTO Tech Center 3600), based on where its pending office actions are examined.