Prosecution Insights
Last updated: May 29, 2026

Precision Robotics (Hong Kong) Limited

5 pending office actions • 5 art units • 5 examiners • 0 of 5 (0%) have an AI response strategy ready • 2 patents granted in the last 365 days

Portfolio Summary

5
Total Pending OAs
4
Non-Final OAs
1
Final Rejections
0
Advisory / Quayle

Response Deadline Pressure

Based on the USPTO statutory response window for each pending office action. 5 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.

3
Overdue
0
Due this week
1
Due this month
0
Due in next 60 days
1
Due later

Deadline Fire Line

Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 5 of the docket's apps have a known mailing date.

-30dToday30d60d90d120d
Overdue (3)Due ≤ 30 days (1)Due later (1)

Case Difficulty Mix

Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.

0
Hard (0%)
5
Medium (100%)
0
Easy (0%)
0
Unknown (0%)

Rejection Statute Mix

BucketCases
§103 only5 (100%)

Industry Mix

How the docket's pending cases split across USPTO tech-center bands.

0
Life Sciences
0% of docket
0
Information Tech
0% of docket
0
Communications
0% of docket
1
Semiconductors
20% of docket
4
Mechanical / Eng
80% of docket
0
Business / Other
0% of docket

Time-on-OA Estimate

Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.

50 h
Manual time on pending OAs
10 h
Time saved (low, 20%)
18 h
Time saved (mid, 35%)
0.4 wks
FTE-weeks freed (mid)

Top Examiners on this docket

ExaminerApps on this docketAllow rateInterview lift
ZARROLI, MICHAEL C 1 72.0% +16.2%
GANNON, LEVI 1 82.6% +6.8%
FERGUSON, MICHAEL P 1 63.4% +73.7%
SHIRSAT, VIVEK K 1 73.8% +28.5%
SCHMITT, BENJAMIN ALLYN 1 5.6% +50.0%

Quick Wins (1)

Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 1 ordered by deadline are shown.

App #TitleExaminerDue in
18690869 SURGICAL ROBOT AND POWER SUPPLY PROTECTION CIRCUIT THEREOF GANNON, LEVI 16d overdue

Hard Cases (1)

Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 1 ordered by deadline are shown.

App #TitleExaminerDue in
18003933 SURGICAL ROBOTIC ARM, FLEXIBLE ARM AND FLEXIBLE JOINT SCHMITT, BENJAMIN ALLYN 5d overdue

Interview Candidates (4)

Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 4 ordered by deadline are shown.

App #TitleExaminerDue in
18698847 SURGICAL ROBOT, AND POWER SUPPLY SYSTEM, POWER SUPPLY PROTECTION CIRCUIT AND MEDIUM THEREOF ZARROLI, MICHAEL C 17d overdue
18003933 SURGICAL ROBOTIC ARM, FLEXIBLE ARM AND FLEXIBLE JOINT SCHMITT, BENJAMIN ALLYN 5d overdue
18571519 CLEAN ROOM MODULE SHIRSAT, VIVEK K 20d
18687902 FLEXIBLE JOINT, MANUFACTURING METHOD THEREOF, AND BENDING SECTION FOR SURGICAL INSTRUMENTS FERGUSON, MICHAEL P 71d

Top Art Units

Art UnitApps
3658 1
2849 1
3619 1
3762 1
3796 1

Pending Office Actions

App #TitleExaminerArt UnitStatutesStatusDue inAIFiled
18698847 SURGICAL ROBOT, AND POWER SUPPLY SYSTEM, POWER SUPPLY PROTECTION CIRCUIT AND MEDIUM THEREOF ZARROLI, MICHAEL C 3658 §103 Non-Final OA 17d overdue Pending Apr 05, 2024
18690869 SURGICAL ROBOT AND POWER SUPPLY PROTECTION CIRCUIT THEREOF GANNON, LEVI 2849 §103 Non-Final OA 16d overdue Pending Mar 11, 2024
18687902 FLEXIBLE JOINT, MANUFACTURING METHOD THEREOF, AND BENDING SECTION FOR SURGICAL INSTRUMENTS FERGUSON, MICHAEL P 3619 §103 Non-Final OA 71d Pending Feb 29, 2024
18571519 CLEAN ROOM MODULE SHIRSAT, VIVEK K 3762 §103 Non-Final OA 20d Pending Dec 18, 2023
18003933 SURGICAL ROBOTIC ARM, FLEXIBLE ARM AND FLEXIBLE JOINT SCHMITT, BENJAMIN ALLYN 3796 §103 Final Rejection 5d overdue Pending Dec 30, 2022

Managing Precision Robotics (Hong Kong) Limited's Patent Portfolio?

IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.

Start Free Trial

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month