Technology area: Medical Devices & Mechanical Engineering
1 pending office actions • 1 art units • 1 examiners • 0 of 1 (0%) have an AI response strategy ready
Renew Energy Maintenance LLC is currently managing 1 pending office action in the Medical Devices & Mechanical Engineering technology area. This single matter is assigned to 1 distinct examiner and is situated within 1 distinct art unit. Such a focused portfolio indicates that the company's current patenting activity is limited to a specific technical domain and a single point of examination. This concentration suggests that the company is not currently pursuing a broad range of technical protections.
The busiest examiner for this company is SEABE, JUSTIN D, who is responsible for 1 busiest examiner pending office action. This individual handles the entirety of the company's 1 pending office action. Because there is only 1 distinct examiner and 1 distinct art unit involved, the prosecution process is highly centralized. Practitioners should focus their efforts on the specific requirements of SEABE, JUSTIN D, as this single examiner controls the progress of the active matter currently pending for the entity.
Based on the USPTO statutory response window for each pending office action. 1 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §103 only | 1 (100%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| SEABE, JUSTIN D | 1 | 71.4% | +24.3% |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 1 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18960206 | METHOD OF REPLACING BEARING GREASE IN A WIND TURBINE | SEABE, JUSTIN D | 31d overdue |
| Art Unit | Apps |
|---|---|
| 3745 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 18960206 | METHOD OF REPLACING BEARING GREASE IN A WIND TURBINE | SEABE, JUSTIN D | 3745 | §103 | Final Rejection | 31d overdue | Pending | Nov 26, 2024 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free TrialRenew Energy Maintenance LLC has 1 pending office actions as of October 2026, spread across 1 art units and 1 examiners.
Justin D Seabe has the most, with 1 of Renew Energy Maintenance LLC's pending office actions.
Mostly Medical Devices & Mechanical Engineering (USPTO Tech Center 3700), based on where its pending office actions are examined.