Prosecution Insights
Last updated: October 25, 2026

Schneider Electric Buildings Americas Inc.

Technology areas: Networking & Security • Communications • Semiconductors, Circuits & Optics

3 pending office actions • 3 art units • 3 examiners • 0 of 3 (0%) have an AI response strategy ready • 6 patents granted in the last 365 days

Analysis

Schneider Electric Buildings Americas Inc. manages 3 pending office actions within the Semiconductors, Circuits & Optics technology area. These matters are assigned to 3 distinct examiners, with each examiner handling exactly one case. The portfolio's activity is spread across 3 distinct art units, showing a one-to-one-to-one relationship between actions, examiners, and art units. CAVALLARI, DANIEL is the busiest examiner for the company, currently managing 1 pending action.

This distribution indicates a highly diversified prosecution landscape despite the small number of pending cases. The 3 pending office actions suggest a focused but technically varied set of filings. Having 3 distinct art units for the actions means that each matter falls into a different technical category. This requires the company to navigate different sets of art unit norms and examiner styles. The distinct examiners involved mean that no single individual has a broad influence over the company's current pending claims. Practitioners should tailor their approach to the specific requirements of each of the art units.

Written from this page's own data; every figure is computed from USPTO records and verified before publication.

Portfolio Summary

3
Total Pending OAs
2
Non-Final OAs
1
Final Rejections
0
Advisory / Quayle

Response Deadline Pressure

Based on the USPTO statutory response window for each pending office action. 2 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.

0
Overdue
0
Due this week
1
Due this month
0
Due in next 60 days
1
Due later

Case Difficulty Mix

Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.

1
Hard (33%)
2
Medium (67%)
0
Easy (0%)
0
Unknown (0%)

Rejection Statute Mix

BucketCases
§103 only2 (67%)
Multi-statute (no §101)1 (33%)

Industry Mix

How the docket's pending cases split across USPTO tech-center bands.

0
Life Sciences
0% of docket
1
Information Tech
33% of docket
1
Communications
33% of docket
1
Semiconductors
33% of docket
0
Mechanical / Eng
0% of docket
0
Business / Other
0% of docket

Time-on-OA Estimate

Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.

30 h
Manual time on pending OAs
6 h
Time saved (low, 20%)
10 h
Time saved (mid, 35%)
0.3 wks
FTE-weeks freed (mid)

Top Examiners on this docket

ExaminerApps on this docketAllow rateInterview lift
CAVALLARI, DANIEL 1 78.5% +14.2%
DEAN, RAYMOND S 1 70.4% +15.8%
TRAN, NAM T 1 77.2% +25.5%

Hard Cases (1)

Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 1 ordered by deadline are shown.

App #TitleExaminerDue in
19048747 FIELD REPLACEABLE ELECTRONIC RETURN FOR ACTUATOR CAVALLARI, DANIEL —

Interview Candidates (3)

Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 3 ordered by deadline are shown.

App #TitleExaminerDue in
18498115 APPARATUSES, SYSTEMS, AND METHODS FOR PROVIDING ACCESS RIGHTS MANAGEMENT IN A BUILDING GRAPH TRAN, NAM T 8d
18533361 TOOL TO GUIDE INSTALLERS IN SETTING UP CONNECTED DEVICES(IOT)/SYSTEMS FOR EFFICIENT AND OPTIMAL NETWORK CREATION/UTILIZATION AND PREVENTION OF NETWORK- RELATED ISSUES IN THE FUTURE DEAN, RAYMOND S 71d
19048747 FIELD REPLACEABLE ELECTRONIC RETURN FOR ACTUATOR CAVALLARI, DANIEL —

Top Art Units

Art UnitApps
2836 1
2645 1
2455 1

Pending Office Actions

App #TitleExaminerArt UnitStatutesStatusDue inAIFiled
19048747 FIELD REPLACEABLE ELECTRONIC RETURN FOR ACTUATOR CAVALLARI, DANIEL 2836 §102§103§112 Non-Final OA — Pending Feb 07, 2025
18533361 TOOL TO GUIDE INSTALLERS IN SETTING UP CONNECTED DEVICES(IOT)/SYSTEMS FOR EFFICIENT AND OPTIMAL NETWORK CREATION/UTILIZATION AND PREVENTION OF NETWORK- RELATED ISSUES IN THE FUTURE DEAN, RAYMOND S 2645 §103 Non-Final OA 71d Pending Dec 08, 2023
18498115 APPARATUSES, SYSTEMS, AND METHODS FOR PROVIDING ACCESS RIGHTS MANAGEMENT IN A BUILDING GRAPH TRAN, NAM T 2455 §103 Final Rejection 8d Pending Oct 31, 2023

Managing Schneider Electric Buildings Americas Inc.'s Patent Portfolio?

IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.

Start Free Trial

Frequently Asked Questions

How many pending USPTO office actions does Schneider Electric Buildings Americas Inc. have?

Schneider Electric Buildings Americas Inc. has 3 pending office actions as of October 2026, spread across 3 art units and 3 examiners.

Which USPTO examiner handles the most Schneider Electric Buildings Americas Inc. applications?

Daniel Cavallari has the most, with 1 of Schneider Electric Buildings Americas Inc.'s pending office actions.

What technology area are Schneider Electric Buildings Americas Inc.'s patent applications in?

Mostly Semiconductors, Circuits & Optics (USPTO Tech Center 2800), based on where its pending office actions are examined.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month