Prosecution Insights
Last updated: October 04, 2026

Schneider Electric Buildings Americas Inc.

Technology areas: Networking & Security • Communications • Semiconductors, Circuits & Optics

4 pending office actions • 4 art units • 4 examiners • 0 of 4 (0%) have an AI response strategy ready • 6 patents granted in the last 365 days

Analysis

Schneider Electric Buildings Americas Inc. is currently managing 4 pending office actions in the Semiconductors, Circuits & Optics technology area. These 4 actions are distributed across 4 distinct examiners and 4 distinct art units. This distribution of actions to examiners and art units suggests a diverse range of technological inquiries that are not concentrated under a single office group. The presence of 4 distinct art units indicates that the company's pending matters span several different technical classifications.

The busiest examiner for the portfolio is CAVALLARI, DANIEL, who is assigned 1 busiest examiner pending office action. Because each of the 4 pending office actions is handled by a different examiner, the workload is spread evenly across the 4 distinct examiners. This requires the company to manage four separate prosecution tracks, each with its own examiner and art unit context. The lack of overlap among the 4 distinct examiners means that strategies must be tailored individually for each pending matter.

Written from this page's own data; every figure is computed from USPTO records and verified before publication.

Portfolio Summary

4
Total Pending OAs
3
Non-Final OAs
1
Final Rejections
0
Advisory / Quayle

Response Deadline Pressure

Based on the USPTO statutory response window for each pending office action. 2 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.

0
Overdue
0
Due this week
1
Due this month
0
Due in next 60 days
1
Due later

Case Difficulty Mix

Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.

2
Hard (50%)
2
Medium (50%)
0
Easy (0%)
0
Unknown (0%)

Rejection Statute Mix

BucketCases
§103 only2 (50%)
Multi-statute (no §101)2 (50%)

Industry Mix

How the docket's pending cases split across USPTO tech-center bands.

0
Life Sciences
0% of docket
1
Information Tech
25% of docket
1
Communications
25% of docket
2
Semiconductors
50% of docket
0
Mechanical / Eng
0% of docket
0
Business / Other
0% of docket

Time-on-OA Estimate

Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.

40 h
Manual time on pending OAs
8 h
Time saved (low, 20%)
14 h
Time saved (mid, 35%)
0.3 wks
FTE-weeks freed (mid)

Top Examiners on this docket

ExaminerApps on this docketAllow rateInterview lift
CAVALLARI, DANIEL 1 78.6% +13.9%
MANGOT, GREGORY LAWRENCE 1 65.6% +20.8%
DEAN, RAYMOND S 1 70.3% +15.7%
TRAN, NAM T 1 77.0% +25.7%

Hard Cases (2)

Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 2 ordered by deadline are shown.

App #TitleExaminerDue in
19048747 FIELD REPLACEABLE ELECTRONIC RETURN FOR ACTUATOR CAVALLARI, DANIEL —
18607958 PLATE FOR DIN RAIL STYLE DEVICES MANGOT, GREGORY LAWRENCE —

Interview Candidates (4)

Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 4 ordered by deadline are shown.

App #TitleExaminerDue in
18498115 APPARATUSES, SYSTEMS, AND METHODS FOR PROVIDING ACCESS RIGHTS MANAGEMENT IN A BUILDING GRAPH TRAN, NAM T 8d
18533361 TOOL TO GUIDE INSTALLERS IN SETTING UP CONNECTED DEVICES(IOT)/SYSTEMS FOR EFFICIENT AND OPTIMAL NETWORK CREATION/UTILIZATION AND PREVENTION OF NETWORK- RELATED ISSUES IN THE FUTURE DEAN, RAYMOND S 71d
19048747 FIELD REPLACEABLE ELECTRONIC RETURN FOR ACTUATOR CAVALLARI, DANIEL —
18607958 PLATE FOR DIN RAIL STYLE DEVICES MANGOT, GREGORY LAWRENCE —

Top Art Units

Art UnitApps
2836 1
2834 1
2645 1
2455 1

Pending Office Actions

App #TitleExaminerArt UnitStatutesStatusDue inAIFiled
19048747 FIELD REPLACEABLE ELECTRONIC RETURN FOR ACTUATOR CAVALLARI, DANIEL 2836 §102§103§112 Non-Final OA — Pending Feb 07, 2025
18607958 PLATE FOR DIN RAIL STYLE DEVICES MANGOT, GREGORY LAWRENCE 2834 §102§103 Non-Final OA — Pending Mar 18, 2024
18533361 TOOL TO GUIDE INSTALLERS IN SETTING UP CONNECTED DEVICES(IOT)/SYSTEMS FOR EFFICIENT AND OPTIMAL NETWORK CREATION/UTILIZATION AND PREVENTION OF NETWORK- RELATED ISSUES IN THE FUTURE DEAN, RAYMOND S 2645 §103 Non-Final OA 71d Pending Dec 08, 2023
18498115 APPARATUSES, SYSTEMS, AND METHODS FOR PROVIDING ACCESS RIGHTS MANAGEMENT IN A BUILDING GRAPH TRAN, NAM T 2455 §103 Final Rejection 8d Pending Oct 31, 2023

Managing Schneider Electric Buildings Americas Inc.'s Patent Portfolio?

IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.

Start Free Trial

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month