Technology areas: Computing & Software • Transportation, E-Commerce & Mechanical Systems
2 pending office actions • 2 art units • 2 examiners • 0 of 2 (0%) have an AI response strategy ready
State Grid Nanjing Power Supply Company has 2 pending office actions in the Transportation, E-Commerce & Mechanical Systems technology area. These actions are split between 2 distinct examiners and 2 distinct art units. MARJORIE PUJOLS-CRUZ is the busiest examiner with 1 pending action. This matching number of actions, examiners, and art units indicates a dispersed prosecution footprint.
The presence of 2 distinct art units for the 2 pending actions suggests that each matter falls into a different specialized category within the mechanical systems sector. With 2 examiners involved, the company is receiving feedback from multiple perspectives even at this small scale. MARJORIE PUJOLS-CRUZ's assignment of 1 pending action highlights the distributed nature of their current legal challenges. Practitioners can expect an individualized approach for each of the pending office actions given the lack of examiner overlap within the Transportation, E-Commerce & Mechanical Systems sector.
Based on the USPTO statutory response window for each pending office action. 1 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 only | 1 (50%) |
| §101 + other | 1 (50%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| PUJOLS-CRUZ, MARJORIE | 1 | 18.4% | +27.1% |
| FENNEMA, ROBERT E | 1 | 53.0% | +24.4% |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 2 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19008913 | METHOD FOR GENERATING OPERATION SCHEDULING SCHEME OF HYDROGEN-PHOTOVOLTAIC-STORAGE-CHARGING INTEGRATED ENERGY STATION | PUJOLS-CRUZ, MARJORIE | 22d |
| 18641379 | Power Energy Scheduling Optimization Method and System for User-side Energy Storage Sharing Framework | FENNEMA, ROBERT E | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 2 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19008913 | METHOD FOR GENERATING OPERATION SCHEDULING SCHEME OF HYDROGEN-PHOTOVOLTAIC-STORAGE-CHARGING INTEGRATED ENERGY STATION | PUJOLS-CRUZ, MARJORIE | 22d |
| 18641379 | Power Energy Scheduling Optimization Method and System for User-side Energy Storage Sharing Framework | FENNEMA, ROBERT E | — |
| Art Unit | Apps |
|---|---|
| 3624 | 1 |
| 2117 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19008913 | METHOD FOR GENERATING OPERATION SCHEDULING SCHEME OF HYDROGEN-PHOTOVOLTAIC-STORAGE-CHARGING INTEGRATED ENERGY STATION | PUJOLS-CRUZ, MARJORIE | 3624 | §101§112 | Final Rejection | 22d | Pending | Jan 03, 2025 |
| 18641379 | Power Energy Scheduling Optimization Method and System for User-side Energy Storage Sharing Framework | FENNEMA, ROBERT E | 2117 | §101 | Final Rejection | — | Pending | Apr 21, 2024 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free TrialState Grid Nanjing Power Supply Company has 2 pending office actions as of October 2026, spread across 2 art units and 2 examiners.
Marjorie Pujols-Cruz has the most, with 1 of State Grid Nanjing Power Supply Company's pending office actions.
Mostly Transportation, E-Commerce & Mechanical Systems (USPTO Tech Center 3600), based on where its pending office actions are examined.