Prosecution Insights
Last updated: October 25, 2026

State Grid Nanjing Power Supply Company

Technology areas: Computing & Software • Transportation, E-Commerce & Mechanical Systems

2 pending office actions • 2 art units • 2 examiners • 0 of 2 (0%) have an AI response strategy ready

Analysis

State Grid Nanjing Power Supply Company has 2 pending office actions in the Transportation, E-Commerce & Mechanical Systems technology area. These actions are split between 2 distinct examiners and 2 distinct art units. MARJORIE PUJOLS-CRUZ is the busiest examiner with 1 pending action. This matching number of actions, examiners, and art units indicates a dispersed prosecution footprint.

The presence of 2 distinct art units for the 2 pending actions suggests that each matter falls into a different specialized category within the mechanical systems sector. With 2 examiners involved, the company is receiving feedback from multiple perspectives even at this small scale. MARJORIE PUJOLS-CRUZ's assignment of 1 pending action highlights the distributed nature of their current legal challenges. Practitioners can expect an individualized approach for each of the pending office actions given the lack of examiner overlap within the Transportation, E-Commerce & Mechanical Systems sector.

Written from this page's own data; every figure is computed from USPTO records and verified before publication.

Portfolio Summary

2
Total Pending OAs
0
Non-Final OAs
2
Final Rejections
0
Advisory / Quayle

Response Deadline Pressure

Based on the USPTO statutory response window for each pending office action. 1 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.

0
Overdue
0
Due this week
1
Due this month
0
Due in next 60 days
0
Due later

Case Difficulty Mix

Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.

2
Hard (100%)
0
Medium (0%)
0
Easy (0%)
0
Unknown (0%)

Rejection Statute Mix

BucketCases
§101 only1 (50%)
§101 + other1 (50%)

Industry Mix

How the docket's pending cases split across USPTO tech-center bands.

0
Life Sciences
0% of docket
1
Information Tech
50% of docket
0
Communications
0% of docket
0
Semiconductors
0% of docket
1
Mechanical / Eng
50% of docket
0
Business / Other
0% of docket

Time-on-OA Estimate

Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.

20 h
Manual time on pending OAs
4 h
Time saved (low, 20%)
7 h
Time saved (mid, 35%)
0.2 wks
FTE-weeks freed (mid)

Top Examiners on this docket

ExaminerApps on this docketAllow rateInterview lift
PUJOLS-CRUZ, MARJORIE 1 18.4% +27.1%
FENNEMA, ROBERT E 1 53.0% +24.4%

Hard Cases (2)

Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 2 ordered by deadline are shown.

App #TitleExaminerDue in
19008913 METHOD FOR GENERATING OPERATION SCHEDULING SCHEME OF HYDROGEN-PHOTOVOLTAIC-STORAGE-CHARGING INTEGRATED ENERGY STATION PUJOLS-CRUZ, MARJORIE 22d
18641379 Power Energy Scheduling Optimization Method and System for User-side Energy Storage Sharing Framework FENNEMA, ROBERT E —

Interview Candidates (2)

Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 2 ordered by deadline are shown.

App #TitleExaminerDue in
19008913 METHOD FOR GENERATING OPERATION SCHEDULING SCHEME OF HYDROGEN-PHOTOVOLTAIC-STORAGE-CHARGING INTEGRATED ENERGY STATION PUJOLS-CRUZ, MARJORIE 22d
18641379 Power Energy Scheduling Optimization Method and System for User-side Energy Storage Sharing Framework FENNEMA, ROBERT E —

Top Art Units

Art UnitApps
3624 1
2117 1

Pending Office Actions

App #TitleExaminerArt UnitStatutesStatusDue inAIFiled
19008913 METHOD FOR GENERATING OPERATION SCHEDULING SCHEME OF HYDROGEN-PHOTOVOLTAIC-STORAGE-CHARGING INTEGRATED ENERGY STATION PUJOLS-CRUZ, MARJORIE 3624 §101§112 Final Rejection 22d Pending Jan 03, 2025
18641379 Power Energy Scheduling Optimization Method and System for User-side Energy Storage Sharing Framework FENNEMA, ROBERT E 2117 §101 Final Rejection — Pending Apr 21, 2024

Managing State Grid Nanjing Power Supply Company's Patent Portfolio?

IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.

Start Free Trial

Frequently Asked Questions

How many pending USPTO office actions does State Grid Nanjing Power Supply Company have?

State Grid Nanjing Power Supply Company has 2 pending office actions as of October 2026, spread across 2 art units and 2 examiners.

Which USPTO examiner handles the most State Grid Nanjing Power Supply Company applications?

Marjorie Pujols-Cruz has the most, with 1 of State Grid Nanjing Power Supply Company's pending office actions.

What technology area are State Grid Nanjing Power Supply Company's patent applications in?

Mostly Transportation, E-Commerce & Mechanical Systems (USPTO Tech Center 3600), based on where its pending office actions are examined.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month