Prosecution Insights
Last updated: October 25, 2026

State Grid Sichuan Electric Power Research Institute

Technology area: Semiconductors, Circuits & Optics

1 pending office actions • 1 art units • 1 examiners • 0 of 1 (0%) have an AI response strategy ready

Analysis

State Grid Sichuan Electric Power Research Institute currently manages 1 pending office action within the Semiconductors, Circuits & Optics technology area. This 1 pending office action is handled by 1 distinct examiner and 1 distinct art unit, showing a concentrated focus for the company's optical or circuit filings. This structure in 1 distinct art unit indicates a specific technological application within the semiconductors sector. The firm can focus on a set of regulatory requirements.

The busiest examiner is QUIGLEY, KYLE ROBERT, who handles 1 busiest examiner pending office action. This 1 busiest examiner pending office action matches the total workload for the company. Since there is only 1 distinct examiner, the practitioner can develop a targeted approach based on the specific examination style of this individual. Resolving the 1 pending office action requires navigating the specific standards of the 1 distinct art unit.

Written from this page's own data; every figure is computed from USPTO records and verified before publication.

Portfolio Summary

1
Total Pending OAs
0
Non-Final OAs
0
Final Rejections
1
Advisory / Quayle

Case Difficulty Mix

Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.

1
Hard (100%)
0
Medium (0%)
0
Easy (0%)
0
Unknown (0%)

Rejection Statute Mix

BucketCases
§101 + other1 (100%)

Industry Mix

How the docket's pending cases split across USPTO tech-center bands.

0
Life Sciences
0% of docket
0
Information Tech
0% of docket
0
Communications
0% of docket
1
Semiconductors
100% of docket
0
Mechanical / Eng
0% of docket
0
Business / Other
0% of docket

Time-on-OA Estimate

Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.

10 h
Manual time on pending OAs
2 h
Time saved (low, 20%)
4 h
Time saved (mid, 35%)
0.1 wks
FTE-weeks freed (mid)

Top Examiners on this docket

ExaminerApps on this docketAllow rateInterview lift
QUIGLEY, KYLE ROBERT 1 53.3% +34.2%

Hard Cases (1)

Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 1 ordered by deadline are shown.

App #TitleExaminerDue in
18561278 METHOD AND SYSTEM FOR PROTECTING HIGH-VOLTAGE DIRECT-CURRENT LINE, DEVICE AND STORAGE MEDIUM QUIGLEY, KYLE ROBERT —

Interview Candidates (1)

Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 1 ordered by deadline are shown.

App #TitleExaminerDue in
18561278 METHOD AND SYSTEM FOR PROTECTING HIGH-VOLTAGE DIRECT-CURRENT LINE, DEVICE AND STORAGE MEDIUM QUIGLEY, KYLE ROBERT —

Top Art Units

Art UnitApps
2857 1

Pending Office Actions

App #TitleExaminerArt UnitStatutesStatusDue inAIFiled
18561278 METHOD AND SYSTEM FOR PROTECTING HIGH-VOLTAGE DIRECT-CURRENT LINE, DEVICE AND STORAGE MEDIUM QUIGLEY, KYLE ROBERT 2857 §101§103 Non-Final OA — Pending Nov 15, 2023

Managing State Grid Sichuan Electric Power Research Institute's Patent Portfolio?

IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.

Start Free Trial

Frequently Asked Questions

How many pending USPTO office actions does State Grid Sichuan Electric Power Research Institute have?

State Grid Sichuan Electric Power Research Institute has 1 pending office actions as of October 2026, spread across 1 art units and 1 examiners.

Which USPTO examiner handles the most State Grid Sichuan Electric Power Research Institute applications?

Kyle Robert Quigley has the most, with 1 of State Grid Sichuan Electric Power Research Institute's pending office actions.

What technology area are State Grid Sichuan Electric Power Research Institute's patent applications in?

Mostly Semiconductors, Circuits & Optics (USPTO Tech Center 2800), based on where its pending office actions are examined.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month