Prosecution Insights
Last updated: October 25, 2026

Sumitomo Construction Machinery Co., Ltd.

Technology areas: Communications • Transportation, E-Commerce & Mechanical Systems

9 pending office actions • 8 art units • 9 examiners • 0 of 9 (0%) have an AI response strategy ready • 27 patents granted in the last 365 days

Analysis

Sumitomo Construction Machinery Co., Ltd. has 11 pending office actions in Transportation, E-Commerce & Mechanical Systems. The matters involve 11 distinct examiners and 10 distinct art units, showing broad examiner distribution with limited art-unit repetition.

HAMID, AMMAR T is the busiest examiner, with 1 pending matter. Counsel should coordinate recurring construction-machinery positions across the portfolio while tailoring each response to its examiner and art-unit setting.

Written from this page's own data; every figure is computed from USPTO records and verified before publication.

Portfolio Summary

9
Total Pending OAs
6
Non-Final OAs
2
Final Rejections
1
Advisory / Quayle

Response Deadline Pressure

Based on the USPTO statutory response window for each pending office action. 2 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.

1
Overdue
0
Due this week
0
Due this month
1
Due in next 60 days
0
Due later

Case Difficulty Mix

Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.

6
Hard (67%)
3
Medium (33%)
0
Easy (0%)
0
Unknown (0%)

Rejection Statute Mix

BucketCases
§101 + other2 (22%)
§103 only3 (33%)
Multi-statute (no §101)4 (44%)

Industry Mix

How the docket's pending cases split across USPTO tech-center bands.

0
Life Sciences
0% of docket
1
Information Tech
11% of docket
2
Communications
22% of docket
0
Semiconductors
0% of docket
6
Mechanical / Eng
67% of docket
0
Business / Other
0% of docket

Time-on-OA Estimate

Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.

90 h
Manual time on pending OAs
18 h
Time saved (low, 20%)
31 h
Time saved (mid, 35%)
0.8 wks
FTE-weeks freed (mid)

Top Examiners on this docket

ExaminerApps on this docketAllow rateInterview lift
HAMID, AMMAR T 1 85.3% +9.7%
WILLIAMS, PATRICK C 1 80.7% +25.2%
LI, RUIPING 1 77.0% +18.2%
VON VOLKENBURG, KEITH ALLEN 1 74.7% +27.6%
HILGENDORF, DALE W 1 84.1% +21.5%
SLOWIK, ELIZABETH J 1 46.0% +9.0%
TEKLE, DANIEL T 1 63.4% -6.0%
BEDEWI, RAMI NABIH 1 67.7% +27.9%
MARUNDA II, TORRENCE S 1 25.8% +30.5%

Quick Wins (1)

Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 1 ordered by deadline are shown.

App #TitleExaminerDue in
19072336 WORK MACHINE AND CONTROL SYSTEM FOR WORK MACHINE HAMID, AMMAR T —

Hard Cases (7)

Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 7 ordered by deadline are shown.

App #TitleExaminerDue in
18899565 EXCAVATOR MANAGEMENT SYSTEM, EXCAVATOR MANAGEMENT METHOD, AND RECORDING MEDIUM SLOWIK, ELIZABETH J 49d overdue
18743623 INFORMATION PROCESSING SYSTEM AND INFORMATION PROCESSING METHOD TEKLE, DANIEL T 40d
18985801 WORK MACHINE WILLIAMS, PATRICK C —
18978487 EXCAVATOR AND EXCAVATOR CONTROL SYSTEM LI, RUIPING —
18978425 EXCAVATOR, DISPLAY APPARATUS, AND REMOTE OPERATION ASSISTANCE APPARATUS VON VOLKENBURG, KEITH ALLEN —
18931630 EXCAVATOR AND EXCAVATOR OPERATION CONTROL SYSTEM HILGENDORF, DALE W —
18059037 EXCAVATOR MARUNDA II, TORRENCE S —

Interview Candidates (6)

Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 6 ordered by deadline are shown.

App #TitleExaminerDue in
18985801 WORK MACHINE WILLIAMS, PATRICK C —
18978487 EXCAVATOR AND EXCAVATOR CONTROL SYSTEM LI, RUIPING —
18978425 EXCAVATOR, DISPLAY APPARATUS, AND REMOTE OPERATION ASSISTANCE APPARATUS VON VOLKENBURG, KEITH ALLEN —
18931630 EXCAVATOR AND EXCAVATOR OPERATION CONTROL SYSTEM HILGENDORF, DALE W —
18474587 EXCAVATOR BEDEWI, RAMI NABIH —
18059037 EXCAVATOR MARUNDA II, TORRENCE S —

Top Art Units

Art UnitApps
3662 2
2695 1
3753 1
2676 1
3665 1
2481 1
3666 1
3663 1

Pending Office Actions

App #TitleExaminerArt UnitStatutesStatusDue inAIFiled
19072336 WORK MACHINE AND CONTROL SYSTEM FOR WORK MACHINE HAMID, AMMAR T 2695 §103 Non-Final OA — Pending Mar 06, 2025
18985801 WORK MACHINE WILLIAMS, PATRICK C 3753 §102§103 Non-Final OA — Pending Dec 18, 2024
18978487 EXCAVATOR AND EXCAVATOR CONTROL SYSTEM LI, RUIPING 2676 §101§103§112 Non-Final OA — Pending Dec 12, 2024
18978425 EXCAVATOR, DISPLAY APPARATUS, AND REMOTE OPERATION ASSISTANCE APPARATUS VON VOLKENBURG, KEITH ALLEN 3665 §103§112 Final Rejection — Pending Dec 12, 2024
18931630 EXCAVATOR AND EXCAVATOR OPERATION CONTROL SYSTEM HILGENDORF, DALE W 3662 §103§112 Final Rejection — Pending Oct 30, 2024
18899565 EXCAVATOR MANAGEMENT SYSTEM, EXCAVATOR MANAGEMENT METHOD, AND RECORDING MEDIUM SLOWIK, ELIZABETH J 3662 §101§103 Non-Final OA 49d overdue Pending Sep 27, 2024
18743623 INFORMATION PROCESSING SYSTEM AND INFORMATION PROCESSING METHOD TEKLE, DANIEL T 2481 §103§112 Non-Final OA 40d Pending Jun 14, 2024
18474587 EXCAVATOR BEDEWI, RAMI NABIH 3666 §103 Non-Final OA — Pending Sep 26, 2023
18059037 EXCAVATOR MARUNDA II, TORRENCE S 3663 §103 Non-Final OA — Pending Nov 28, 2022

Managing Sumitomo Construction Machinery Co., Ltd.'s Patent Portfolio?

IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.

Start Free Trial

Frequently Asked Questions

How many pending USPTO office actions does Sumitomo Construction Machinery Co., Ltd. have?

Sumitomo Construction Machinery Co., Ltd. has 9 pending office actions as of October 2026, spread across 8 art units and 9 examiners.

Which USPTO examiner handles the most Sumitomo Construction Machinery Co., Ltd. applications?

Ammar T Hamid has the most, with 1 of Sumitomo Construction Machinery Co., Ltd.'s pending office actions.

What technology area are Sumitomo Construction Machinery Co., Ltd.'s patent applications in?

Mostly Transportation, E-Commerce & Mechanical Systems (USPTO Tech Center 3600), based on where its pending office actions are examined.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month