Prosecution Insights
Last updated: October 26, 2026

The Chugoku Electric Power Co. Inc.

Technology area: Chemistry & Materials

2 pending office actions • 2 art units • 2 examiners • 0 of 2 (0%) have an AI response strategy ready • 1 patents granted in the last 365 days

Analysis

The Chugoku Electric Power Co. Inc. has 2 pending office actions within the Medical Devices & Mechanical Engineering technology area. These actions are distributed across 2 distinct examiners and 2 distinct art units. FREAY, CHARLES GRANT is the busiest examiner for the company, currently overseeing 1 pending office action. The distribution of 2 actions among 2 examiners shows that no single examiner is managing more than one matter for the portfolio at this time.

The involvement of 2 distinct art units indicates that the company's applications are being reviewed by two different specialized groups. FREAY, CHARLES GRANT is the busiest examiner, yet he manages only 1 pending office action, which accounts for half of the total pending workload. This 1 to 1 ratio between pending actions and distinct examiners ensures that each matter is subject to a unique review process. Practitioners should note that the 2 pending office actions are not concentrated under a single individual, but are instead spread across 2 distinct examiners. This lack of concentration in the Medical Devices & Mechanical Engineering area suggests a diversified approach to the company's current patent filings.

Written from this page's own data; every figure is computed from USPTO records and verified before publication.

Portfolio Summary

2
Total Pending OAs
2
Non-Final OAs
0
Final Rejections
0
Advisory / Quayle

Case Difficulty Mix

Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.

1
Hard (50%)
1
Medium (50%)
0
Easy (0%)
0
Unknown (0%)

Rejection Statute Mix

BucketCases
§103 only1 (50%)
Multi-statute (no §101)1 (50%)

Industry Mix

How the docket's pending cases split across USPTO tech-center bands.

2
Life Sciences
100% of docket
0
Information Tech
0% of docket
0
Communications
0% of docket
0
Semiconductors
0% of docket
0
Mechanical / Eng
0% of docket
0
Business / Other
0% of docket

Time-on-OA Estimate

Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.

20 h
Manual time on pending OAs
4 h
Time saved (low, 20%)
7 h
Time saved (mid, 35%)
0.2 wks
FTE-weeks freed (mid)

Top Examiners on this docket

ExaminerApps on this docketAllow rateInterview lift
FREAY, CHARLES GRANT 1 77.0% +30.3%
GREGORIO, GUINEVER S 1 73.1% +18.4%

Hard Cases (1)

Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 1 ordered by deadline are shown.

App #TitleExaminerDue in
18854428 METHOD AND APPARATUS FOR WATER CLARIFICATION AND GREENING FREAY, CHARLES GRANT —

Interview Candidates (2)

Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 2 ordered by deadline are shown.

App #TitleExaminerDue in
18854428 METHOD AND APPARATUS FOR WATER CLARIFICATION AND GREENING FREAY, CHARLES GRANT —
17642798 PHOSPHORUS ADSORBENT GREGORIO, GUINEVER S —

Top Art Units

Art UnitApps
1778 1
1732 1

Pending Office Actions

App #TitleExaminerArt UnitStatutesStatusDue inAIFiled
18854428 METHOD AND APPARATUS FOR WATER CLARIFICATION AND GREENING FREAY, CHARLES GRANT 1778 §102§103§112 Non-Final OA — Pending Oct 04, 2024
17642798 PHOSPHORUS ADSORBENT GREGORIO, GUINEVER S 1732 §103 Non-Final OA — Pending Mar 14, 2022

Managing The Chugoku Electric Power Co. Inc.'s Patent Portfolio?

IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.

Start Free Trial

Frequently Asked Questions

How many pending USPTO office actions does The Chugoku Electric Power Co. Inc. have?

The Chugoku Electric Power Co. Inc. has 2 pending office actions as of October 2026, spread across 2 art units and 2 examiners.

Which USPTO examiner handles the most The Chugoku Electric Power Co. Inc. applications?

Charles Grant Freay has the most, with 1 of The Chugoku Electric Power Co. Inc.'s pending office actions.

What technology area are The Chugoku Electric Power Co. Inc.'s patent applications in?

Mostly Chemistry & Materials (USPTO Tech Center 1700), based on where its pending office actions are examined.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month