Technology areas: Computing & Software • Transportation, E-Commerce & Mechanical Systems
17 pending office actions • 13 art units • 16 examiners • 0 of 17 (0%) have an AI response strategy ready • 41 patents granted in the last 365 days
Yaskawa Electric Corporation has 17 pending office actions in Transportation, E-Commerce & Mechanical Systems. The portfolio spans 16 distinct examiners and 13 distinct art units, showing broad examiner distribution with some repeated art-unit involvement. The matter count is only slightly higher than the examiner count, so most examiner relationships concern one pending matter.
KRUG, RANDELL J is the busiest examiner, with 2 pending matters. Counsel should maintain a coordinated portfolio view while preserving examiner-specific strategies for the assignments spread across the art units.
Based on the USPTO statutory response window for each pending office action. 4 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 4 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 + other | 1 (6%) |
| §103 only | 7 (41%) |
| §102 only | 2 (12%) |
| Multi-statute (no §101) | 7 (41%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| KRUG, RANDELL J | 2 | 76.6% | +18.0% |
| STIEBRITZ, NOAH WILLIAM | 1 | 61.5% | -7.1% |
| DANG, TRANG THANH | 1 | 58.8% | +29.3% |
| EMMETT, MADISON B | 1 | 80.3% | +9.9% |
| PRATHER, GREGORY T | 1 | 68.8% | +21.5% |
| KATZ, DYLAN MICHAEL | 1 | 86.4% | +21.0% |
| MUIR, MATTHEW SINCLAIR | 1 | 70.9% | +29.4% |
| EVERETT, CHRISTOPHER E | 1 | 83.6% | +23.1% |
| NGUYEN, ROBERT T | 1 | 83.6% | +10.7% |
| CAIN, ZACHARY ANDREW | 1 | 73.5% | +50.0% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 3 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18440146 | ROBOT SYSTEM, CALIBRATION TOOL, AND CALIBRATION METHOD | NGUYEN, ROBERT T | 23d |
| 18959623 | ROBOT CONTROL WITH ERROR REDUCTION | EMMETT, MADISON B | 28d |
| 18826463 | CONTROL SYSTEM AND CONTROL METHOD | KATZ, DYLAN MICHAEL | — |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19267604 | ROBOT AND ROBOT SYSTEM | KRUG, RANDELL J | — |
| 19260610 | ROBOT SYSTEM AND MODELING METHOD | STIEBRITZ, NOAH WILLIAM | — |
| 19086177 | SYSTEM, UNIT, AND MANUFACTURING METHOD | DANG, TRANG THANH | — |
| 18824908 | CONTROL APPARATUS AND COOLING METHOD OF CONTROL APPARATUS | MUIR, MATTHEW SINCLAIR | — |
| 18821188 | ROBOT CONTROL SYSTEM, ROBOT CONTROLLER, AND ROBOT CONTROL METHOD | EVERETT, CHRISTOPHER E | — |
| 18525869 | LINEAR HEAD MODULE AND ELECTRONIC COMPONENT MOUNTING APPARATUS | LEGASPI, EUGENE REY DEVERA | — |
| 18450406 | SIMULATION MODEL CORRECTION OF A MACHINE SYSTEM | CHAVEZ, ANTHONY RAY | — |
| 18363088 | IMAGE GENERATING METHOD, IMAGE GENERATING DEVICE, AND STORAGE MEDIUM | YAO, JULIA ZHI-YI | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18440146 | ROBOT SYSTEM, CALIBRATION TOOL, AND CALIBRATION METHOD | NGUYEN, ROBERT T | 23d |
| 18396700 | COMMUNICATION SYSTEM WITH ORDERED COMMAND DATA SETS | CAIN, ZACHARY ANDREW | 69d |
| 19267604 | ROBOT AND ROBOT SYSTEM | KRUG, RANDELL J | — |
| 19086177 | SYSTEM, UNIT, AND MANUFACTURING METHOD | DANG, TRANG THANH | — |
| 18951951 | ROBOT AND METHOD FOR MANUFACTURING ROBOT | PRATHER, GREGORY T | — |
| 18951529 | ROBOT | KRUG, RANDELL J | — |
| 18826463 | CONTROL SYSTEM AND CONTROL METHOD | KATZ, DYLAN MICHAEL | — |
| 18824908 | CONTROL APPARATUS AND COOLING METHOD OF CONTROL APPARATUS | MUIR, MATTHEW SINCLAIR | — |
| Art Unit | Apps |
|---|---|
| 3618 | 3 |
| 3658 | 2 |
| 2117 | 2 |
| 3656 | 1 |
| 3657 | 1 |
| 2841 | 1 |
| 3619 | 1 |
| 2116 | 1 |
| 3729 | 1 |
| 2186 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19267604 | ROBOT AND ROBOT SYSTEM | KRUG, RANDELL J | 3618 | §102§103§112 | Final Rejection | — | Pending | Jul 13, 2025 |
| 19260610 | ROBOT SYSTEM AND MODELING METHOD | STIEBRITZ, NOAH WILLIAM | 3658 | §102§103 | Non-Final OA | — | Pending | Jul 07, 2025 |
| 19086177 | SYSTEM, UNIT, AND MANUFACTURING METHOD | DANG, TRANG THANH | 3656 | §102§103§112 | Non-Final OA | — | Pending | Mar 21, 2025 |
| 18959623 | ROBOT CONTROL WITH ERROR REDUCTION | EMMETT, MADISON B | 3658 | §103 | Final Rejection | 28d | Pending | Nov 26, 2024 |
| 18951951 | ROBOT AND METHOD FOR MANUFACTURING ROBOT | PRATHER, GREGORY T | 3618 | §102 | Non-Final OA | — | Pending | Nov 19, 2024 |
| 18951529 | ROBOT | KRUG, RANDELL J | 3618 | §103 | Final Rejection | — | Pending | Nov 18, 2024 |
| 18826463 | CONTROL SYSTEM AND CONTROL METHOD | KATZ, DYLAN MICHAEL | 3657 | §103 | Non-Final OA | — | Pending | Sep 06, 2024 |
| 18824908 | CONTROL APPARATUS AND COOLING METHOD OF CONTROL APPARATUS | MUIR, MATTHEW SINCLAIR | 2841 | §102§103 | Non-Final OA | — | Pending | Sep 05, 2024 |
| 18821188 | ROBOT CONTROL SYSTEM, ROBOT CONTROLLER, AND ROBOT CONTROL METHOD | EVERETT, CHRISTOPHER E | 2117 | §102§103 | Non-Final OA | — | Pending | Aug 30, 2024 |
| 18440146 | ROBOT SYSTEM, CALIBRATION TOOL, AND CALIBRATION METHOD | NGUYEN, ROBERT T | 3619 | §102 | Final Rejection | 23d | Pending | Feb 13, 2024 |
| 18396700 | COMMUNICATION SYSTEM WITH ORDERED COMMAND DATA SETS | CAIN, ZACHARY ANDREW | 2116 | §103 | Final Rejection | 69d | Pending | Dec 27, 2023 |
| 18525869 | LINEAR HEAD MODULE AND ELECTRONIC COMPONENT MOUNTING APPARATUS | LEGASPI, EUGENE REY DEVERA | 3729 | §103§112 | Non-Final OA | — | Pending | Dec 01, 2023 |
| 18450406 | SIMULATION MODEL CORRECTION OF A MACHINE SYSTEM | CHAVEZ, ANTHONY RAY | 2186 | §101§103 | Non-Final OA | — | Pending | Aug 16, 2023 |
| 18363088 | IMAGE GENERATING METHOD, IMAGE GENERATING DEVICE, AND STORAGE MEDIUM | YAO, JULIA ZHI-YI | 2666 | §103§112 | Non-Final OA | — | Pending | Aug 01, 2023 |
| 18112791 | PAINTING SYSTEM AND PAINTING METHOD | KURPLE, KARL | 1717 | §103 | Final Rejection | 61d | Pending | Feb 22, 2023 |
| 17721372 | MACHINE LEARNING DATA GENERATION DEVICE, MACHINE LEARNING DEVICE, AND MACHINE LEARNING DATA GENERATION METHOD | RAMESH, TIRUMALE K | 2121 | §103 | Non-Final OA | — | Pending | Apr 15, 2022 |
| 17670511 | COATING CONTROL SYSTEM, COATING CONTROL APPARATUS, SETTING APPARATUS OF COATING CONTROL APPARATUS, SETTING METHOD OF COATING CONTROL APPARATUS, AND NON-TRANSITORY COMPUTER READABLE STORAGE MEDIUM | FOLLANSBEE, YVONNE TRANG | 2117 | §103 | Final Rejection | — | Pending | Feb 14, 2022 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free TrialYaskawa Electric Corporation has 17 pending office actions as of October 2026, spread across 13 art units and 16 examiners.
Randell J Krug has the most, with 2 of Yaskawa Electric Corporation's pending office actions.
Mostly Transportation, E-Commerce & Mechanical Systems (USPTO Tech Center 3600), based on where its pending office actions are examined.